An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. GSOC UpdateMay 2012 Member Services Steve Caison

  2. Topics • System loads • Current Projects • Compliance • 2012 Strategic Issues

  3. System Loads

  4. Smart Grid - Status • Consists of 11 Total Projects • Three Completely Finished • Telecom Upgrade • Scheduling Member Hardware and Software Upgrade • Fire Suppression Upgrade • Four Substantially Completed • EMS Alarm Enhancements • Centralized Database Editing • CIP Tools & Data Historian

  5. Smart Grid Status (cont.) • Four to be completed in 2012 • Improved Real-Time Production Costs • Energy Control System Upgrade • Outage Management Tool • Transmission System Model • DOE Grant pays for roughly half of project costs

  6. Telecom Initiative – GTC/GSOC • GSOC responsible for Network monitoring, configuration and troubleshooting of backbone and circuit devices • Pilot Project underway now • Project to be complete by Fall 2014

  7. Information Delivery – Improvements for 2012 • GSOC Data Portal • New Feature: ability to “push” reports • Member Portal – single log-in • Using SharePoint as the platform • Will incorporate Member-Net, Data Portal, Tiger, and GEMC associations • First deployment to GEMC Technology Association is complete • Member IDs are being distributed

  8. Other Projects • ECOT – EMC Customer Outage Tracking Initiative • Automation of EMC reporting • GEMC information flow statewide • GSOC DOE requirement and need for increased operator situational awareness. • Substation log-in access – automate and simplify current ITS screen access • C & I Metering Support– EMC follow-up

  9. Compliance – Fundamental Change • The change in compliance environment is extraordinary. • Compliance enforcement has moved from voluntary compliance to potential fines of $1 million per day per violation. • FP&L was fined $25 million for violations that resulted in a major blackout. • TVA was brought before a congressional committee to explain its security vulnerabilities. • Number of requirements applicable to GSOC has increased from 274 to 540.

  10. Compliance – Fundamental Change (cont.) • Risks – New era of detailed mandatory NERC standards presents substantial risks to the corporation • Large fines • Adverse publicity • Increased long-term costs

  11. Compliance • December Critical Infrastructure Protection (CIP) audit results • Waiting for the final report from Southeastern Electric Reliability Corporation (SERC) • Already begun mitigation activities related to certain audit findings

  12. Strategic Focus 2012 • Reliability Legislation/Compliance • Infrastructure improvements and Smart Grid (ECS update) • Data Delivery Improvements • Telecommunications Initiative • Small Generator Guidelines • Workforce Strategy • EMC Focus Group Concept

  13. Thank You!Questions?