1 / 21

Cost Issues in International Settlements

Cost Issues in International Settlements. March 1998 DNTA David N. Townsend & Associates DNTA@dntownsend.com http://www.dntownsend.com/dnta/. Cost component definition: the ITU framework.

desma
Télécharger la présentation

Cost Issues in International Settlements

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Cost Issues inInternational Settlements March 1998 DNTADavid N. Townsend & Associates DNTA@dntownsend.comhttp://www.dntownsend.com/dnta/

  2. Cost component definition: the ITU framework ITU-T Recommendation D.140 defines three basic operational components (network elements) of international telephone termination service: 1. International transmission facilities 2. International switching facilities 3. National extension

  3. Cost component definition: the ITU framework 1. International transmission • Earth station • Submarine/terrestrial cable system • Cable landing station • International terrestrial radio links • National links between these facilities and the International Exchange

  4. Cost component definition: the ITU framework 2. International switching • International telecommunications maintenance and operations center • Telephone exchange • Associated transmission and signaling equipment

  5. Cost component definition: the ITU framework 3. National extension ITU definition: The national extension, used for international telephone traffic, consists of national exchanges, national transmission facilities and, if appropriate and identified under a bilateral or multilateral agreement, the local loop.

  6. Cost component definition: the ITU framework 3. National extension A. For combined international and national administrations: • Trunk switches/national exchanges • National transmission facilities • Local loop, “if appropriate and identified under bi-lateral/multilateral agreement”

  7. Cost component definition: the ITU framework 3. National extension B. For separate international and national administrations: Payment by international administration to national administration on the basis of: • Per minute • Annual lump sum • Revenue/Cost sharing (e.g. percentage of international collections), or • Combination of any of above three

  8. The FCC methodology: Tariffs as surrogate for costs Two basic components to the FCC’s “Benchmark Order” (Docket 97280) on international settlement rates to be paid by U.S. carriers: 1. Development of cost estimates using a “Tariffed Components Price” (TCP) methodology; and 2. Development of “benchmark” settlement rates, based upon worldwide averages of TCP costs.

  9. The FCC methodology: Tariffs as surrogate for costs 1. International transmission • The FCC uses tariff prices for international leased circuits. • Formula = price for 2.048 Mbps circuit  (120 lines x 8,000 mins per line) • Results range from 0.7¢ per minute (Mexico) to 25.5¢ per minute (Kenya), with most countries’ results falling below 10¢ per minute.

  10. The FCC methodology: Tariffs as surrogate for costs 2. International switching • The FCC utilizes the published switching component of TEUREM (European) country settlement charges. • Countries are divided according to three categories of economic development. • Results range from 1.9¢ to 4.8¢ per minute.

  11. The FCC methodology: Tariffs as surrogate for costs 3. National extension • The FCC uses a complicated formula of weighted averages of local and in-country long distance tariffs. • Based upon a sample of incoming traffic to each country from the U.S. • The results range from a high of $25.2¢ per minute to a low of zero, for three countries that don’t charge for domestic calls on a per-minute basis.

  12. Problems with the benchmark approach • The term “benchmarks” is meant to describe average or target cost or price levels for an entire industry. • Benchmark prices do not necessarily reflect the actual cost experience of any given operator. • The goal is to establish an approximate industry-average cost, as an objective for all operators to move toward.

  13. Problems with the benchmark approach • Benchmarks assume that costs are, or should be, the same across widely different countries and economies. This is clearly not true. • Under the FCC policy, countries with above average costs must lose money on international settlements, while countries below can make a profit.

  14. Problems with the benchmark approach Examples: Russia TCP = 35¢ per minute Thailand TCP = 17¢ per minute Benchmark for both = 19¢ per minute

  15. Problems with the FCC “TCP” for national extension costs • Improper use of non-discrimination principle • Below-cost national tariffs • Ignores fixed charges • Rebalancing effects

  16. Problems with the FCC “TCP” for national extension costs • No accounting for domestic access charges • Miscalculation of local tariffs • Incorrect assumptions about commercial costs • Rejecting Universal Service contributions

  17. Toward a theoretical basis for national extension costs Three components to economically “appropriate” national extension costs: 1. Incremental cost of national usage 2. Proportionate share of joint and common costs 3. Support for infrastructure development

  18. Toward a theoretical basis for national extension costs 1. Incremental national usage cost • National trunks • Tandem switches • Local switches Total recurring capital + operating costs, divided by combined total minutes of use in network.

  19. Toward a theoretical basis for national extension costs 2. Share of joint and common costs • Administration and commercial overhead expenses (excluding marketing costs) • Local loop recurring capital and operating costs (existing loops only) • Subtract monthly subscription revenues Divide result by total minutes of use in network.

  20. Toward a theoretical basis for national extension costs 3. Contribution to infrastructure (Universal Service) • Projected near-term annual network investment • Subtract projected annual connection charge revenues Divide result by total minutes of use in network. Yields an upper ceiling for contribution element.

More Related