1 / 16

Lafarge Build Habitat for Humanity – Calgary October 2003

Lafarge Build Habitat for Humanity – Calgary October 2003. Mike O'Brien Hal Metheral Sean Spivey Alan Kreisberg Kristopher Noonan Karen Lenko Dave Wiebe Debra Brown . Habitat for Humanity Job Superintendent Technical Sales Rep, Plasti-Fab

devaki
Télécharger la présentation

Lafarge Build Habitat for Humanity – Calgary October 2003

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Lafarge Build Habitat for Humanity – Calgary October 2003

  2. Mike O'Brien Hal Metheral Sean Spivey Alan Kreisberg Kristopher Noonan Karen Lenko Dave Wiebe Debra Brown Habitat for Humanity Job Superintendent Technical Sales Rep, Plasti-Fab General Contractor: Sub-contracts for Lafarge President, Lafarge Cement Group Western Region HR Manager, Lafarge Construction Materials Western Canada Region HR Instructor, Lafarge Construction Materials Western Canada Region Sales Manager, Lafarge Construction Materials Greater Calgary Res/Comm Dispatcher, Lafarge Construction Materials Greater Calgary Ready Mix Volunteers – October 27/03

  3. Jobsite at 8:40 a.m. footings stripped and guide boards in place

  4. Job shack at 9:20 a.m. LtoR front row: Alan Kreisberg and Hal Metheral LtoR back row: Mike O'Brien, Sean Spivey, Kris Noonan

  5. ICF block arrives at jobsite for unloading

  6. ICF block arrives at jobsite for unloading

  7. ICF block arrives at jobsite for unloading

  8. Dave Wiebe bending rebar for block

  9. First course(bottom row) of ICF block is laid Sean Spivey, Debra Brown, Kris Noonan

  10. Starting second course of ICF block. Sean Spivey, Hal Metheral

  11. Working on second course of ICF block Mike O'Brien, Debra Brown, Dave Wiebe, Kris Noonan

  12. Preparing floor beams/joist for drilling and inserts. Karen Lenko, Kris Noonan

  13. Passing rest of floor beam/joists out of basement area Karen Lenko, Alan Kreisberg (Dave Wiebe, Hal Metheral in background)

  14. Carrying bloor beam/joists up ramp. Kris Noonan

  15. Preparing braces/scaffold for building walls higher Hal Metheral, Sean Spivey

  16. ICF block now 5 courses high. Group shot Debra Brown, Kris Noonan (forefront) Hal Metheral, Sean Spivey (background)

More Related