20 likes | 135 Vues
This detailed report provides a thorough analysis of the company’s background, mission, vision, and range of engineering consultancy services. It encompasses project objectives, feasibility studies, cost estimations, and detailed designs, including infrastructure and utilities. The document outlines methodologies for project management, health and safety standards, and offers recommendations for successful project execution. This report is essential for stakeholders involved in civil engineering projects, ensuring clarity and strategic planning.
E N D
CMID REPORT SEQUENCES This report is prepared along the following headings of: 1. 0 Background of Company • Cooperate Mission • Vision • Range of Engineering Consultancy • Range of Services • Bank Facilities (If any) • Asset and Machinery • Previous and on going project • Company membership (if Any) • Corporate Information (detail) • Organisation Chart • Personal Information staff 2.0 Background of Project • Introduction • Objective • Problem Statement • Project Particular • Scope of Project • Project Planning • The join venture company (if Any) • 3.0 Feasibilities Studies Report • 3.1 Site Preparation and Analysis • Strategy Located • Existing Condition • Site analysis (photograph, Map, etc) • Topography • Soil investigation data • Or Surveying data • Or water related data, etc • 3.2 Preliminary Studies • SWOT Analysis of Proposed Project • Advantage of The Project • 3.3 Project Development Cost • Introduction • Development Program • Assumption • Estimated Project Development Cost • Pre Development Cost • Construction Cost (building/road/water structure/infrastructure, etc) LINTON UNIVERSITY COLLEGE SCHOOL OF CIVIL ENGINEERING
4.0 Agreement with Specification • Procurement Methods • Contract Agreements • Contract Document • Condition • Form of Tender • Special of provision • Letter of Acceptance • Contract Drawing • Specification of infrastructure (building, road, etc) • 5.0 Detail Design Development + Drawing • Introduction • Plan and Elevation • Structural/Road/Water structure Design (using Staad pro/Mx Road/etc) • (3D)+crosss Section detail----- emphasize…!!!!! • Standard Code (BS. AASHTO, etc) • 6.0 Infrastructure and Utilities • Parking and road network • Electricity • Water Supply • Sewerage and Drainage system • Etc • 7.0 Project management Technique • Project Schedule and Planning • Work Breakdown Structures • Gantt Chart (use Microsoft Project) • Critical Path Methods (CPM) • 8.0 Health Safety Aspect and Construction methods • Introduction • Health and safety project • Safety Management • Regulation building/road/water treatment for health and safety • Procedures of Works • Quality Management (QA/QC) • Machinery and Material management • Procedures of works • Surveying work • Piling • RC • Or earthwork • Cut and fill • Retaining wall, etc • 9.0 Conclusion and Recommendation • References • Appendices LINTON UNIVERSITY COLLEGE SCHOOL OF CIVIL ENGINEERING