170 likes | 352 Vues
Status of Chamber Construction QC at CIEMAT. B. de la Cruz CIEMAT (Madrid) CMS Week February 2003. Number of SL and Chambers produced up to now: 54 SL 28 SL 24 assembled chambers, 19 already sent to CERN.
E N D
Status of Chamber Construction QC at CIEMAT B. de la Cruz CIEMAT (Madrid) CMS Week February 2003
Number of SL and Chambers produced up to now: • 54 SL • 28 SL • 24 assembled chambers, 19 already sent to CERN. Next week, shipment of 5 more chambers. Summary showing continuous trend in construction items: • Wire positions and tensions • Corner Block positions • Chamber thickness & planarity Muons DT QC Meeting - February 2003 CMS Week B. de la Cruz CIEMAT (Madrid)
Wires Position & Tension SL at table 1 Layer 1Layer 2 Layer 3 Layer 4 Mean=6.4m = 46.0 m Mean=0.4mMean=-0.4 = 46.0 m = 38.2 m Mean=2.93 N = 0.10 N Muons DT QC Meeting - February 2003 CMS Week
Wires Position & Tension SL at table 1 Layer 1Layer 2 Layer 3 Layer 4 Muons DT QC Meeting - February 2003 CMS Week
Wires Position & Tension SL at table 2 Layer 1Layer 2 Layer 3 Layer 4 Mean = 4.6 m = 36.4 m Mean = -5.5 m = 45.3 m Mean = 3.09 N = 0.12 N Muons DT QC Meeting - February 2003 CMS Week
Wires Position & Tension SL at table 2 Layer 1Layer 2 Layer 3 Layer 4 Muons DT QC Meeting - February 2003 CMS Week
Wires Position & Tension Z SL at table 3 Layer 1Layer 2 Layer 3 Layer 4 Mean = 5.3m = 44.0 m Mean = -7.4m = 48.5 m Mean = 3.04 N = 0.09 N Muons DT QC Meeting - February 2003 CMS Week
Wires Position & Tension Z SL at table 3 Layer 1Layer 2 Layer 3 Layer 4 Muons DT QC Meeting - February 2003 CMS Week
Corner Blocks Positions (1 & 4) Change in positioning/measuring methods Rather uniform corner block position for the different SL at the different construction tables. Residuals (m) Residuals (m) B. de la Cruz CIEMAT (Madrid) Muons DT QC Meeting - February 2003 CMS Week
Corner Blocks Positions(2 & 3) Residuals (m) Residuals (m) B. de la Cruz CIEMAT (Madrid) Muons DT QC Meeting - February 2003 CMS Week
Chamber Thickness SL thickness measured when assembling chamber. Results on 23 chambers . SL (1, 2,Z) Thickness(mm) Chamber Thickness (mm) Mean value= 53.7 mm Mean value = 288.5 mm Width = 0.3 mm Width = 0.3 mm B. de la Cruz CIEMAT (Madrid) Muons DT QC Meeting - February 2003 CMS Week
Chamber Planarity (m) 2 Planarity 1 Planarity Muons DT QC Meeting - February 2003 CMS Week B. de la Cruz CIEMAT (Madrid)
Chamber Planarity (m) HCPlanarity ZPlanarity Muons DT QC Meeting - February 2003 CMS Week B. de la Cruz CIEMAT (Madrid)
SuperLayer Production Muons DT QC Meeting - February 2003 CMS Week B. de la Cruz CIEMAT (Madrid)
SuperLayer Production Muons DT QC Meeting - February 2003 CMS Week B. de la Cruz CIEMAT (Madrid)
Chamber Production Muons DT QC Meeting - February 2003 CMS Week B. de la Cruz CIEMAT (Madrid)
Public Info Public Information on chamber constructionand tests is available at http://wwwae.ciemat.es/cms/QC.html At the moment we are moving our information on DT construction into the Oracle DT Production Database at CERN, proposed by Pablo, see: http://oraweb03.cern.ch:9000/pls/cms_mb_prod/chambers.main Shortly this will beour unique reference database. Asccii files, if needed, will be automatically produced from it. Muons DT QC Meeting - February 2003 CMS Week B. de la Cruz CIEMAT (Madrid)