1 / 10

TRD Chamber Status

TRD Chamber Status. News: New leak rate measurements Production is imminent Some material arrived Soldering machine arrived at Frankfurt X-Ray test stand is taking shape Bukarest joins Production Goal: get ready by end of this year. Leak rate. New Gas system from Rainer:

kemp
Télécharger la présentation

TRD Chamber Status

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TRD Chamber Status News: • New leak rate measurements • Production is imminent • Some material arrived • Soldering machine arrived at Frankfurt • X-Ray test stand is taking shape • Bukarest joins Production Goal: get ready by end of this year TRD Status meeting Alice week Hd Clemens Adler

  2. Leak rate New Gas system from Rainer: • ~0 intrinsic leak rate Leak Rate < 0.1 mbar* l/h (~precision limit) with greased gas connectors See how it develops with realistic configuration: 5 chambers in a row, some angular deviation... TRD Status meeting Alice week Hd Clemens Adler

  3. Soldering • Soldering machine arrived at IKF (mid August) • Where to put the solder still unresolved • Start tests as soon as possible (Monday) TRD Status meeting Alice week Hd Clemens Adler

  4. Requirements defined Mechanical impementation decided: needs engineering work: September Material ordering (Hd): September Delivery: Oktober Assembly/ TÜV: Okt./Nov. X-ray Test Stand TRD Status meeting Alice week Hd Clemens Adler

  5. Increase of HV ensures longer tube life Possible with planned Power supply X-ray test stand cont. TRD Status meeting Alice week Hd Clemens Adler

  6. New winding frame is sturdy enough, even in weight reduced version Meteor displays a loss of tension over first windings. Winding machine • Winding machine modification: scheduled beginning of Sept.  need to check TRD Status meeting Alice week Hd Clemens Adler

  7. New crane for the clean room is ordered: arrives 2nd Oct. Week Needed for moving of winding frames to tables Crane TRD Status meeting Alice week Hd Clemens Adler

  8. Arrived: Wacosit profile (frame) arrived: Side profiles warped, but OK after glueing to Al profiles Voltage divider PCBs arrived Signal cables arrived In Approach: Padplanes (slight delay, due to manufacturing confusion): finished end of next week Fischer panel: ~4 weeks from now To order: Vacuum tables Glueing tables Connectors (ROB): Minimum 15k pc. = 3930 € 60% TRD: 39k pc. = 10218 € Need add. Offers? Delay... Material Status TRD Status meeting Alice week Hd Clemens Adler

  9. Production steps were discussed with Optiprint to optimize mechanical precision where we need it. Result: Question from Optiprint 2 weeks ago: „do we need this precision?? Will bring up the price considerably.“ = some unfortunate mixup...  2 week delay Padplane TRD Status meeting Alice week Hd Clemens Adler

  10. Near Term Schedule TRD Status meeting Alice week Hd Clemens Adler

More Related