Wind power project in Ukraine of 56 MW

Wind power project in Ukraine of 56 MW. A potential investor is offered to acquire a partly permitted project - « Kamyanska Wind Farm» in high wind area with nearly highest feed-in tariff in Europe. Project description:

dhamby
Télécharger la présentation

Wind power project in Ukraine of 56 MW

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Wind power project in Ukraine of 56 MW A potential investor is offered to acquire a partly permitted project - «Kamyanska Wind Farm»in high wind area with nearly highest feed-in tariff in Europe. Project description: - 56MW wind farm with a transformer substation and a 2-storey administrative building; - Planned installation of 15 wind turbines; - Certified wind measurement is carried out over a period of 13 months by the German company “Deutsche Wind Guard Consulting GmbH”. (To date, there are indicators and analysis of 13 months of measurements); - Land lease for sitetransformer substation; - Land lease of 17 sites (15 planned by the project +2 reserve) for wind turbines, at the final stage; - A grid connection contract at the final stage. Market: -Wind feed-in tariff set at the level of 0,09 EUR / kWh for electricity produced from wind in 2020. - In order to receive the current tariff, the construction should be completed by the end of 2020. - Relatively mature renewable energy market: 1.1 GW installed with 440 MW of wind power. - EBRD, IFC and European Export Banks financed half of the projects in Ukraine. OPIC re-stared providing insurance in Ukraine.

  2. Land with a total capacity of 56 MW Site map

  3. FINANCIAL MODEL

  4. RESULTS OF VOLUME SPEED BY MONTHS (from 01.2018 to 02.2018 and from 06.2018 to 04.2019 inclusive)

  5. Wind turbine construction site plan Windmeasurements: Land: Construction permit, project design: Connection: View 120m