1 / 15

EVACUATION STRATEGIES FOR KARWAR ULTRA MEGA THERMAL POWER PROJECT

EVACUATION STRATEGIES FOR KARWAR ULTRA MEGA THERMAL POWER PROJECT. SOUTHERN REGIONAL LOAD DESPATCH CENTRE. ULTRA MEGA THERMAL POWER PROJECTS. GUJARAT MUNDRA PORT MADHYA PRADESH ASSAN CHATTISGARH AKALTARA KARNATAKA KARWAR MAHARASHTRA KONKAN COAST 4000 MW EACH

didina
Télécharger la présentation

EVACUATION STRATEGIES FOR KARWAR ULTRA MEGA THERMAL POWER PROJECT

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. EVACUATION STRATEGIES FOR KARWAR ULTRA MEGA THERMAL POWER PROJECT SOUTHERN REGIONAL LOAD DESPATCH CENTRE

  2. ULTRA MEGA THERMAL POWER PROJECTS • GUJARAT MUNDRA PORT • MADHYA PRADESH ASSAN • CHATTISGARH AKALTARA • KARNATAKA KARWAR • MAHARASHTRA KONKAN COAST • 4000 MW EACH • RS 15000 CRORES INVESTMENT FOR EACH PLANT

  3. 68 72 76 88 92 96 80 84 INDIA GEO POLITICAL J&K POWER REGIONS HP PUNJAB HARIANA NER N BHUTAN NEPAL SKM DELHI NG NE ASSAM RAJASTHAN UP ME BIHAR MNP B’ DESH- E TRP MIZ MP MYANMAR JKND WB GUJARAT W L CTGR ORISSA MAHARASHTRA DIU DAMAN S GOA AP PONDICHERY KARNATAKA A&N TAMIL NADU LAKSHADWEEP SRI LANKA PROPOSED 5 ULTRA MEGA POWER PROJECTS SASA MUDRAKOT TADIRI

  4. KARWAR ULTRA MEGA THERMAL POWER PROJECT EVACUATION CHALLENGES

  5. FOREST MAP OF KARNATAKA

  6. ENVIRONMENTAL ISSUES KARWAR IS IN COASTAL SURROUNDED BY DENSE FORESTS • FOREST CLEARANCE APPROVALS – LONGER LEAD TIMES • NECESSITATES QUICK FINANCIAL TIE-UPS AND STATUTORY APPROVALS • MAY REQUIRE USE OF MULTI CIRCUIT TOWERS TO CONSERVE ROW

  7. TECHNICAL ISSUES • LOAD-LOAD GROWTH IN NORTH COASTAL KARNATAKA NOT COMMENSURATE WITH THE GENERATION ADDITION. • LOAD CENTRES ARE TOWARDS SOUTH – BANGALORE-MYSORE-MANGALORE-HASSAN. • BANGALORE LOADS GROWING AT A PHENOMENAL RATE (15%).

  8. EVACUATION STRATEGIESCORE ISSUES • EVACUATION FOR A 4000 MW STATION NEEDS TO BE ROBUST • LOAD CENTRES ARE FAR AWAY NECESSIATING A NEED FOR LONG LINES • HOLISTIC PLANNING:-SHOULD BLEND IN WITH THE EXISTING SCHEME FOR ECONOMY AND BETTER CORRIDOR UTILIZATION • VOLTAGE LEVELS:- • 765 KV LINES • 400 KV D/C QUAD MOOSE • 400 KV D/C

  9. Suggested Evacuation Plan for KARWAR ULTRA MPP (4000MW): OPTION 1 AC Link or HVDC B2B at RAICHUR or PARLE TO PARLE (WR) MAPUSA (GOA) HVDC B2B@ MAPUSA NARENDRA HYD MUNIRABAD RAICHUR NSR KAIGA SSLM KURNOOL TORANGALLU KARWAR ULTRA MPP (4000 MW) GUTTUR GOOTY ANANTPUR (AP) D/C QUAD LINES HIRIYUR Lines considered in CEA NEP 2012 TALAGUPPA Lines in service by end Dec 06 DODBALLAPUR Suggested KARWAR Evacuation and NAGARJUNA Mangalore Project Evaluation HASSAN NELAMANGALA NAGARJUNA 1000 MW HOODY SMNHL TO KOLAR MYSORE Fixed Series Compensation BIDADI TO KOHZIKODE (KERALA)

  10. Suggested Evacuation LinesOPTION 1 • KARWAR-MAPUSA ( HVDC B2B LINK) • KARWAR-TALAGUPPA (400 KV DOUBLE CKT.) • KARWAR-HIRIYUR (400 KV DOUBLE CKT.) • HIRIYUR-HASSAN (400 KV DOUBLE CKT.) • NELAMANGA-TALAGUPPA BOTH 400 KV CKTS. LILO AT HASSAN • HIRIYUR-DODDABALLAPUR 400 KV S/C • HIRIYUR-ANATHPUR-DODDABALLAPUR 400 KV S/C • NAGARJUNA – HASSAN (400 KV DOUBLE CKT.) • HASSAN-MYSORE (400 KV DOUBLE CKT.) • MYSORE-NELAMANGALA ONE CKT. LILO AT BIDADI.

  11. OPTION 1: HIGHLIGHTS • THE EXISTING CORRIDOR OF TALAGUPPA NELAMANGALA LINE IS USED FOR ENHANCING EVACUATION. • BY PROVIDING HVDC BACK-TO-BACK CONNECTION WITH GOA, FLEXIBLE AND GUARANTEED EXPORT TO GOA (WR) CAN BE ACHIEVED. • CREATION OF A NEW STATION (DODDABALLAPUR) NEAR BANGALORE HAS BEEN ENVISAGED FOR ADDED SECURITY AND RELIABILITY OF SUPPLY TO AND AROUND BANGALORE. • TOUCH POINT HAS BEEN PROVIDED AT ANANTHPUR IN AP – GROWING LOAD CENTRE. • MAY REQUIRE COMPENSATION OR STRENGTHENING OF TALGUPPA-HASSAN SECTIONS. • N-1 CRITERIA IS BARELY MET.

  12. Lines considered in CEA NEP 2012 Lines in service by end Dec 06 Suggested KARWAR Evacuation and NAGARJUNA Mangalore Project Evaluation Fixed Series Compensation Suggested Evacuation Plan for KARWAR ULTRA MPP (4000MW): OPTION 2 AC Link or HVDC B2B at RAICHUR or PARLE NARENDRA TO PARLE (WR) BB WADI KOLHAPUR (WR) HVDC B2B@ NARENDRA HYD RAICHUR NSR KAIGA SSLM MUNIRABAD KURNOOL KARWAR ULTRA MPP (4000 MW) TORANGALLU GUTTUR GOOTY ANANTPUR (AP) D/C QUAD LINES HIRIYUR TALAGUPPA DODBALLAPUR HASSAN NELAMANGALA NAGARJUNA 1000 MW HOODY MYSORE BIDADI SMNHL TO KOLAR TO KOHZIKODE (KERALA)

  13. OPTION -2 HIGHLIGHTS • NARENDRA-KOLHAPUR BACK-TO-BACK LINK INSTEAD OF KARWAR-MAPUSA. • ADDITIONAL D/C LINE TO BASAVANA BAGEWADI TO SERVE N.KARNATAKA AND ALSO CONNECTS TO TWO HVDC B2B EXPORT PATHS • NARENDRA- KOLHAPUR • RAICHUR-PARLE • ADEQUATE EVACUATION CAPACITY.

  14. Lines considered in CEA NEP 2012 Lines in service by end Dec 06 Suggested KARWAR Evacuation and NAGARJUNA Mangalore Project Evaluation Fixed Series Compensation Suggested Evacuation Plan for KARWAR ULTRA MPP (4000MW): OPTION 3 AC Link or HVDC B2B at RAICHUR or PARLE TO PARLE (WR) NARENDRA BB WADI KOLHAPUR (WR) HVDC B2B@ NARENDRA HYD RAICHUR NSR KAIGA MUNIRABAD SSLM KARWAR ULTRA MPP (4000 MW) KURNOOL TORANGALLU GUTTUR GOOTY ANANTPUR (AP) D/C QUAD LINES HIRIYUR TALAGUPPA Lines considered in CEA NEP 2012 SERIES CAPACITOR Lines in service by end Dec 06 MANGALORE POOLING POINT DODBALLAPUR Suggested KARWAR Evacuation and NAGARJUNA Mangalore Project Evaluation HASSAN NELAMANGALA NAGARJUNA 1000 MW HOODY SMNHL TO KOLAR MYSORE Fixed Series Compensation BIDADI TO KOHZIKODE (KERALA)

  15. OPTION -3 HIGHLIGHTS • ADDITIONAL LINE ALONG THE COAST TOWARDS MANGALORE POOLING POINT FOR NAGARJUNA AND KARWAR POWER • SERIES CAPACITOR ON THIS LINE MAY BE REQUIRED DUE TO ITS LARGER IMPEDANCE • TALGUPPA LINE CAN BE AVOIDED IF NEED BE • ADDITIONAL D/C LINE TO BASAVANA BAGEWADI TO SERVE N.KARNATAKA AND ALSO CONNECTS TO TWO HVDC B2B EXPORT PATHS • NARENDRA- KOLHAPUR • RAICHUR-PARLE • MANGALORE-POOLING POINT TO MYSORE ALSO CAN BE CONSIDERED • EVACUATION IS SAME AS THE COGENTRIX PROJECT WHICH WAS SHELVED • MAXIMUM RELIABILITY WITH MINIMUM FOREST CLEARANCE REQUIREMENT • ANOTHER STATION AT HAVERI CAN BE CONSIDERED FOR EVACUATION INSTEAD OF HIRIYUR • LILO OF NARENDRA GUTTUR AT HAVERI • KARWAR - HAVERI – HIRIYUR D/C QUAD • THIS WOULD REDUCE THE LINE LENGTHS • THIS WOULD FURTHER REDUCE FOREST CLEARANCE

More Related