An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CPO 7 Traffic Control Changes: Updates and Explanations May 4, 2009 Washington County Land Use and Transportation Tom Tushner

  2. Traffic Section • Areas of Responsibility • Traffic Analysis • Traffic Design • Traffic Operations • Signals • Signing • Striping • Illumination Washington County Land Use and Transportation Tom Tushner

  3. Background - Budget • Budget • Funding Sources • Road Fund • MSTIP/MTIP/TIF - SB 994 • Private Development • ARRA (American Recovery and Reinvestment Act of 2009) Washington County Land Use and Transportation Tom Tushner

  4. ARRA Project Requirements • Economic Stimulus Parameters • “Shovel Ready” projects • Environmental Impacts • Project Size • Jobs Bill • Time Lines for Delivery Washington County Land Use and Transportation Tom Tushner

  5. Traffic Projects • Projects Moving Forward • School Zone Flashers • Flashing Yellow Arrow (FYA) • Interior Illuminated Signs • Traffic Signal Retiming • Transport Regional Arterial Improvement Project • ITS Corridors – Scholls Ferry Road, Cornell Road and 185th Avenue Washington County Land Use and Transportation Tom Tushner

  6. Traffic Projects • Back-Fill Projects • Emergency Vehicle Preemption • Pedestrian Count Down Head Replacement • Fail-Safe Project • Video Detection • Other Considered Projects • Recessed Pavement Marker • Retroreflective Sign Replacement Washington County Land Use and Transportation Tom Tushner

  7. School Zone Flashers • 15 locations being considered • Estimate - $250,000 • Solar Powered • Pager Activated • Environmental Concerns Washington County Land Use and Transportation Tom Tushner

  8. FYA/Interior Illuminated Signs • Combined Projects • 190 intersections retrofit with FYA • 240 interior illuminated signs • Estimate - $650,000 • Environmental Concern/Benefits, $20,000 annual savings Washington County Land Use and Transportation Tom Tushner

  9. Flashing Yellow Arrow Washington County Land Use and Transportation Tom Tushner

  10. Traffic Signal Retiming • Approximately 170 intersections • Focus on corridors • Estimate - $600,000 • Environmental Benefits • Minor CIP – Communications, wireless Washington County Land Use and Transportation Tom Tushner

  11. Transport Regional Arterial Improvement Project • ODOT/Metro • Coordination of six jurisdictions • Estimate - $4,288,000 • $475,000 for County owned system • $875,000 for ODOT and cities within County • Washington County • 3 corridors – Scholls Ferry, 185th and Cornell • Approximately 50 intersections on Washington County system, another 70 intersections within Washington County • Scope – Controllers, cabinets, communications, retiming Washington County Land Use and Transportation Tom Tushner

  12. Emergency Vehicle Preemption • Previous work • Completes County system • Impacts approximately 1/3 of the County signals, 66 intersections • Minor environmental benefit • Safety benefit • Estimate - $320,000 Washington County Land Use and Transportation Tom Tushner

  13. Pedestrian Count Down Head Replacement • Approximately 200 intersections, 1,500 pedestrian heads • Estimate - $740,000 • MUTCD requirement Washington County Land Use and Transportation Tom Tushner

  14. Video Detection • Fail-Safe • Flexible Size, fit to available funds • Current Program – 42 intersections • ITS relationship Washington County Land Use and Transportation Tom Tushner

  15. Recessed Pavement Markers • Estimate - $500,000 • Snowstorm damage/advantages • Environmental concerns Washington County Land Use and Transportation Tom Tushner

  16. Retroreflective Sign Replacement • 14,000 SF, 1,300 miles of road, 1,400 signs • MUTCD Requirement • Estimate - $246,000 Washington County Land Use and Transportation Tom Tushner

  17. Kaiser at Bethany/Kaiser at Laidlaw • TIF Projects • Signalization • FYA (N/S only at Laidlaw, Sight Distance issue) • Right Turn Overlaps • Ped Count Down Signals Washington County Land Use and Transportation Tom Tushner

  18. Questions Thank you Tom Tushner Principal Engineer Traffic Section (503)846-7950 tom_tushner@co.washington.or.us Washington County Land Use and Transportation Tom Tushner