This document outlines the integration and end-to-end testing procedures for the SXC Instrument Simulator and Structural Thermal Model. It includes the necessary requirements for functional testing, test plans, and specifications for specialized facilities such as the EGSE and MGSE. The testing will involve collaboration with operators and instrument specialists under horizontal position conditions without energy calibration or field of view alignment. The final deliverables will support the integration and testing efforts of the SXC consortium and ensure proper operation of the telescope detector system.
E N D
SXC integration and test Instrument simulator Structural Thermal Model Instrument end-to-end test
SXC end-to-end test Telescope Detector Ground segment Integration Deliver of FM subsystems to SXC consortium El. continuity Functional test • Required for end-to-end • SXC end-to-end test plan • Test facility • EGSE • MGSE ( mechanical support, hoisting, container etc) • SCOE ( feedthrough, bus-extenders etc.) • Operators and other instrument specialists • Horizontal position No energy calibration No FOV alignment End-to-end No SXC – EMC test alignment Deliver to IKI SXC system Integration and test