1 / 64

UIC Completion Reporting Guidance

UIC Completion Reporting Guidance. Jim Moore, Engineering Specialist II Injection-Storage Permits & Support. PRESENTATION OVERVIEW.

donagh
Télécharger la présentation

UIC Completion Reporting Guidance

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. UIC Completion Reporting Guidance Jim Moore, Engineering Specialist II Injection-Storage Permits & Support

  2. PRESENTATION OVERVIEW A few examples of RRC webpage research including UIC webpages then a step-by-step guidance for W-2/G-1 online completions for injection / disposal / storage / brine mining wells. Steps include log in, starting or updating a completion packet, entering data, additional forms, submitting, messaging, and problem resolution. Please ask questions during the presentation.

  3. RRC HOMEPAGE RRC Online Log In Oil & Gas link or pull-down menu Data – Online Research Queries

  4. RRC WEBPAGE Online Research Queries Injection/Disposal Permit Query Oil & Gas Completion Query Oil & Gas Imaged Records Menu

  5. RRC WEBPAGE Oil and Gas Imaged Records Query Menu Oil & Gas Well Records GAU Letters Disposal Permits (W-14) Injection/Disposal Permits (H-1/H-1A) These are links to Neubus

  6. OVERVIEW INJECTION PERMIT TYPES • H-1/H-1A • Enhanced Recovery • Oil and Gas Waste Disposal • W-14 • Oil and Gas Waste Disposal • H-2 • Brine Mining • H-4 • Underground Hydrocarbon Storage

  7. INJECTION/DISPOSAL PERMIT DETAIL • Base of Usable Quality Water • Casing Record • Injection Interval • Tubing/Packer Depth • Formation Name(s) • Permit Special Conditions

  8. UIC Permit IMPORTANT PERMIT DATA • Drilling Permit • Completion Report • Field Name & Field Number • Matches on Completion (Form W-2/G-1), Drilling Permit (Form W-1) • Well Number • Can be changed/updated with Completion • Injection Disposal Well

  9. COMPLETION OVERVIEW • Packet Data • Form W-2/G-1 Data • Complete Additional Forms • P-4, W-12, L-1 • Load Attachments • W-15, W-12, GAU Letter (formerly TCEQ ), Log Header, others e.g. SWR13 Exception Letter • Submit

  10. ONLINE SYSTEM Select Completions

  11. FILING OPTIONS & MESSAGES File a New Completion or Update Existing Completion Packet Check Messages for your User ID, or find all Messages for this Operator

  12. UPDATE EXISTING PACKET Packet Status: - Submitted Packet Status: - Work In Progress - Pending Operator Update - Hard Copy View By options

  13. FILE A NEW COMPLETION PACKET Enter Drilling Permit No. or API No. Click Search

  14. FILE A NEW COMPLETION PACKET • Multiple Field Names Allowed on Drilling Permit NewPacket

  15. CHOOSE THE CORRECT DRILLING PERMIT • Multiple Drilling Permits may be populated when searching with API • Drilling Permit’s can have multiple field names • Choosing the Correct Drilling Permit is very Important!

  16. PACKET DATA Recommended sequence Definitions for Purpose of Filing Purpose of Filing Type of Completion Well Type Wellbore Profile Packet Type

  17. PACKET DATA

  18. PACKET DATA

  19. PACKET DATA (For WSW, Water SupplyWells)

  20. PACKET DATA Wellbore Profile is auto-populated from Drilling Permit, Form W-1

  21. PACKET DATA

  22. PACKET DATA Tracking Number gets assigned 3 2 Click Create Packet tab Purpose of Filing Type of Completion Well Type Vertical Profile Packet Type 1 Done

  23. PACKET DATA Change Packet Description Save Fill in Well Data Recompletion/Reclass Table

  24. PACKET DATA New data fields 01/2014 Enter Permit No. & Date Search for Field & Reservoir Prior Service Type

  25. PACKET DATA Search for Field & Reservoir 1 result Select

  26. W-2/G-1 PAGE 1 Select W-2 to continue Save, Select Page # Page 1: Potential Test Data

  27. W-2/G-1 PAGE 2 System responds with red text warnings if critical data is missing on this page. Save Fill In Well Data

  28. W-2/G-1 PAGE 3 New data fields 01/2014

  29. W-2/G-1 PAGE 4 New data fields 01/2014 Type of Casing (pull-down) Conductor Surface Intermediate Conventional Production Tapered Production Other Top of Cement Determined By (pull-down) Calculation Temperature Survey Cement Evaluation Log Circulated

  30. W-2/G-1 PAGE 4 • Active UIC: • Tubing & Packer Set • Possible exceptions • Brine mining • Hydrocarbon storage • Permit exception

  31. Perforations and Packer Depth • Insure Packer, Perforations and Plug Back depth all agree Needs to be less than 100’ unless permitted packer depth allows it Permitted Interval Injection Interval

  32. Example Permit • Permitted Interval: 5577-6468’ • Actual Packer depth: 5800’

  33. Example of Inaccurate Reporting • If the permitted interval is reported instead of the completed interval, there is an obvious discrepancy 5577 5800 Actual Perforations: 6000-6150 6468

  34. W-2/G-1 PAGE 5 Can be “Yes” for Shut-In UIC Injection/Disposal Interval is within Permitted Interval This table is required for Well Type: Active UIC

  35. W-2/G-1 PAGE 5 New data fields 01/2014 List all Work Chronologically, attach Form W-15 for new CIBP, Cement Squeeze, Squeeze Perfs, etc. Process (pull-down) Acid Fracture Cement Squeeze Cast Iron Bridge Plug* Retainer Other

  36. W-2/G-1 PAGE 5 When to mark “Encountered”, “Isolated” New data fields 01/2014

  37. RRC WEBPAGE Quick recommendation!! Oil & Gas page Compliance & Enforcement Revised SWR 13 – Casing, Cementing, Drilling, Well Control, and Completion Requirements

  38. RRC WEBPAGE Compliance & Enforcement page Rule 13 – Geologic Formation Information

  39. EXAMPLE FORMATION TOPS

  40. W-2/G-1 PAGE 6 Red text warnings if critical data is missing on W-2/G-1. Certify (or Re-certify) Electronic Signature

  41. COMPLETE ADDITIONAL FORMS Determine All Required Forms Additional Forms Attachments Select P-4 Certificate of Compliance and Transportation Authority

  42. ADDITIONAL FORM: P-4 RRC Gas ID or Oil Lease No. is blank/zero Service Well, Yes Gatherers and/or Purchasers info left blank.* Certify (or Re-certify)

  43. ADDITIONAL FORM: P-4 Electronic Signature Certify (or Re-certify)

  44. ADDITIONAL FORM: W-12 Well Information Shot Point Information Certify (or Re-certify) Electronic Signature

  45. ADDITIONAL FORM: L-1 Basic Electric Log Run Option: Confidentiality Attach Log Header Option: Log Attached Mail Log to RRC Austin Attention: Proration or UIC Certify (or Re-certify) Electronic Signature

  46. LOAD ATTACHMENTS Determine All Required Forms Additional Forms Attachments Select W-15 Cementing Report

  47. LOAD ATTACHMENTS: W-15 Browse to file location such as your Desktop Formats: .pdf or .tif 2 1 3 Upload Current Attachments

  48. RRC WEBPAGE Quick recommendation!! Oil & Gas page Forms - Proposed Form Changes

  49. RRC WEBPAGE Proposed Form Changes W-15 Cementing Report

  50. LOAD ATTACHMENTS: W-12 Pick 1 of 2 ways to initiate the Upload Attachment step Current Attachments

More Related