1 / 1
ESA Documentation Timeline For Construction Projects
10 likes | 145 Vues
ESA Documentation Timeline For Construction Projects. Project Footprint. Advanced Plans (90 %). Plans, Specification and Estimate (PS&E). Preliminary Plans (30 %). Bid Let. 10 mo. 9 8 7 6 5 4 3 2 1.
Télécharger la présentation
ESA Documentation Timeline For Construction Projects
An Image/Link below is provided (as is) to download presentation
Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.
Content is provided to you AS IS for your information and personal use only.
Download presentation by click this link.
While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.
During download, if you can't get a presentation, the file might be deleted by the publisher.
E N D
Presentation Transcript
ESA Documentation Timeline For Construction Projects Project Footprint Advanced Plans (90 %) Plans, Specification and Estimate (PS&E) Preliminary Plans (30 %) Bid Let 10 mo. 9 8 7 6 5 4 3 2 1 Submit Formal BA (LAA) Receive Biological Opinion/Take Statement (LAA) or Letter of Concurrence (NLAA) Submit In-Formal BA (NLAA) Pre-consultation 1
More Related