Chamber Production at CERN 904

Chamber Production at CERN 904. Department of Physics, Sungkyunkwan - university, Korea Dong- hyun kim. Contents. Introduction RPC Production Process RPC Production State PLAN. 1. Introduction. Resistive Plate Chamber(RPC) is Muon detector

donoma
Télécharger la présentation

Chamber Production at CERN 904

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Chamber Production at CERN 904 Department of Physics, Sungkyunkwan-university, Korea Dong-hyunkim

  2. Contents • Introduction • RPC Production Process • RPC Production State • PLAN

  3. 1. Introduction • Resistive Plate Chamber(RPC) is Muon detector • CMS RPC Upgrade project : Build a 4 layer(Front & End cap) • Total construction Chambers : 144 (RE4/3 – 72, RE4/2 – 72) New Build Part

  4. 2. RPC Production Process • Mechanical Part • Gap Part

  5. 2. RPC Production Process • Mechanical Part • Gap Part

  6. 2. RPC Production Process • Mechanical Part • Gap Part

  7. 2. RPC Production Process • Mechanical Part • Gap Part

  8. 2. RPC Production Process • Cooling & Electronic Part • Cooling • Electronic

  9. 2. RPC Production Process - COMPLETION -

  10. 2. RPC Production Process • Chamber Cosmic Test

  11. 3. RPC Production State • CERN – 904 site state( Built by Dong-Hyun Kim ) • Dong-Hyun Kim Job list * At 28.Aug.2013

  12. 3. RPC Production State • CERN – 904 site state( Built by Dong-Hyun Kim )

  13. 4. PLAN • Construction RE4/2 & RE4/3 Chambers • Study for a Cosmic test logic • Study about the Cosmic test • Study to Analysis CMS data

  14. Ref. Visual Test < Visual Testing > < Visual Test sheet >

  15. Ref. Leak Test < Leak Station > < Gas Pressure Sensor >

  16. Ref. Spacer Test Spacer Map Spacer

  17. Ref. HV Connector < Jupiter Type > < Tripolar Type >

  18. Ref. Dark Current Test < Test Result graph >

  19. CERN-904 Photo

  20. - THANKS -