1 / 14

CHAMBER PRODUCTION AT CERN 904

CHAMBER PRODUCTION AT CERN 904. RPC upgrade-meeting, 08.jan.2014 Dong- hyun Kim on behalf of the cern-904 team Department of physics, sungkyunkwan university, korea. Content. Status of 904 site Data Analysis Plan. 1 . Status of 904 site. Visual test – 17 BO Gaps

whitley
Télécharger la présentation

CHAMBER PRODUCTION AT CERN 904

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CHAMBER PRODUCTION AT CERN 904 RPC upgrade-meeting, 08.jan.2014 Dong-hyun Kim on behalf of the cern-904 team Department of physics, sungkyunkwan university, korea

  2. Content • Status of 904 site • Data Analysis • Plan

  3. 1. Status of 904 site • Visual test – 17 BO Gaps • Made 3 HV-Connector • Still waiting a Gas back • New india-student coming

  4. 2. Data Analysis • Study for Muon Efficiency at = 8TeV(Full pile-up events) • MC : MC : /DYToMuMu_M-20_CT10_TuneZ2star_v2_8TeV-powheg-pythia6/Summer12_DR53X-PU_S10_START53_V7A-v1/AODSIM • RD : /SingleMu/Run2012A(B,C)-22Jan2013-v1/AOD • Json file : Cert_190456-208686_8TeV_22Jan2013ReReco_Collisions12_JSON.txt

  5. 2. Data Analysis • For IDIso - μ+

  6. 2. Data Analysis • For IDIso - μ+

  7. 2. Data Analysis • For IDIso -μ+

  8. 2. Data Analysis • For STA - μ+

  9. 2. Data Analysis • For STA - μ+

  10. 2. Data Analysis • For STA -μ+

  11. 2. Data Analysis • For Tracking - μ+

  12. 2. Data Analysis • For Tracking - μ+

  13. 2. Data Analysis • For Tracking -μ+

  14. 3. Plan • Calculate Trigger Muon Efficiency • Leak test for the BO Gaps • Dark-current test for the BO Gaps • Make the HV-Connetor

More Related