An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript

Playing audio...

  1. The CMU Reconfigurable Computing Project April 9, 1999 Mihai Budiu mihaib@cs.cmu.edu CMU Reconfigurable Computing

  2. Current Project Members ECE Department Herman Schmit Srihari Cadambi Matt Moe Robert Taylor Ronald Laufer CS Department Seth Copen Goldstein Mihai Budiu CMU Reconfigurable Computing

  3. Why Study Reconfigurable Hardware? It is a nice computation paradigm (wire your own computer) CMU Reconfigurable Computing

  4. Why Study Reconfigurable Hardware CMU Reconfigurable Computing

  5. Commercial Players Source: In-stat April 1998  *Does not include software, hardwire or support EPROMs CMU Reconfigurable Computing

  6. What Is “Reconfigurable Hardware?” Interconnection network Universal gates and/or storage elements Switches CMU Reconfigurable Computing

  7. 0 0 0 1 a0 data a0 a1 & a2 a1 a1 Universal gate = RAM Basic Ingredient:RAM cell CMU Reconfigurable Computing

  8. Basic Ingredients (ctd) 0 1 1 1 A switch is controlled by a 1-bit RAM cell CMU Reconfigurable Computing

  9. Outline • What is reconfigurable hardware • RH vs other computation paradigms • Challenges in RH research • PipeRench: the CMU project: • the hardware • the software • Conclusions CMU Reconfigurable Computing

  10. RH vs ASICs • Generally Application-Specific Integrated Circuits will be faster than RH: • RH wires are slow & big • RH bit-slices are costly to interconnect • RH devices must store configuration on the chip but • RH can be reprogrammed • new algorithms • to fix bugs • RH cheaper in small production • RH tolerates faults better • RH sometimes faster with staged computation CMU Reconfigurable Computing

  11. RH vs Microprocessors • RH less flexible (like a VLIW with fixed instructions) but • RH provides more (customized) computation elements • RH can decrease memory traffic • RH can be tailored for specific algorithms and data types RH will not replace mP, but complement them CMU Reconfigurable Computing

  12. Types of RH • FPGAs: bit-level logic functionality (the basic processing elements compute on 1 bit) • word-based architectures: PipeRench (CMU) (basic PE operates on 8 bits) (basic PE is a small ALU) • coarse architectures: RAW (MIT) (basic PE is a MIPS 2000 core) CMU Reconfigurable Computing

  13. RH In A System CMU Reconfigurable Computing

  14. Challenges In RC • Software tools: • Programming RC like software development • Automatic compilation from HLL • Automatic program partitioning • Mapping efficiently algorithms (no ISA) • System issues • interfaces • find “ideal” RC fabric CMU Reconfigurable Computing

  15. The CMU Reconfigurable Computing Project CMU Reconfigurable Computing

  16. Hardware Goals • To build a complete reconfigurable hardware device • To build the system integration hardware • To host the device in a PC CMU Reconfigurable Computing

  17. Our Device: • Word processing elements • Pipelined architecture • Virtualized hardware • Local interconnection network • Wide pipelined bus CMU Reconfigurable Computing

  18. Configuration memory Data & Config controller Stripes Processing elements CMU Reconfigurable Computing

  19. Hardware Virtualization Actual available hardware Instructions currently in hardware Program Instructions paged out CMU Reconfigurable Computing

  20. Hardware Virtualization (2) Page out compute compute Program in configuration memory compute configure Page in hardware Overlap configuration with computation. CMU Reconfigurable Computing

  21. Processing Elements a b Cin PE2 PE1 PE0 out • Look-up table • Any 3-to-1 function CMU Reconfigurable Computing

  22. P*B bits Word-level cross-bar 0 B bits PE PE 1 PE N Pass Registers P*B*N bits The Interconnection Network CMU Reconfigurable Computing

  23. The PCI Board CMU Reconfigurable Computing

  24. Software Goal To program reconfigurable devices using the standard software development processes: • Compile C or Java • Do it quickly Java Partitioner Data-flow Intermediate Language DIL Built Configuration CPU Reconfigurable HW CMU Reconfigurable Computing

  25. Building Circuits From DIL a = b+c*d; e = c - d; • variables wires • operators gates d c b * + - a e CMU Reconfigurable Computing

  26. Mapping Circuits To a b c a + b c c a b - + + - - c a b + - CMU Reconfigurable Computing

  27. The DIL Compiler Front-End Circuit Parser Evaluator Loader Dil input file Backend Loader component library Component circuits CMU Reconfigurable Computing

  28. The DIL Compiler Backend Circuit (expanded) Circuit (placed) Circuit Optimizer Placer- Router Front-end The whole compilation process is very fast (compared to classical CAD tools). We can compile two orders of magnitude faster. Code generator xfig C++ C++ Asm CMU Reconfigurable Computing

  29. Processing Element Size Tradeoffs CMU Reconfigurable Computing

  30. Stripe Width Tradeoffs CMU Reconfigurable Computing

  31. Bus Width Tradeoffs CMU Reconfigurable Computing

  32. Clock Speed Tradeoffs(run-time) 24 24 24 24 + + 8 8 24 + 8 + 24 CMU Reconfigurable Computing

  33. CMU Reconfigurable Computing

  34. CMU Reconfigurable Computing

  35. Project Status • Operational: • Behavioral and structural models of Piperench in Verilog • Assembler, simulator • Tools for visualization and debugging • One tile fabricated and tested • Very fast compiler from intermediate language • In work: • Prototype PipeRench to be taped this summer • PCI board to host PipeRench in a PC CMU Reconfigurable Computing

  36. Simulated Speed-up vs. UltraSparc @ 300Mhz CMU Reconfigurable Computing

  37. Future Work • Build the PCI board • Build the OS device drivers • Start investigating HLL issues: • automatic partitioning • translation to DIL • special code transformations CMU Reconfigurable Computing

  38. Conclusions • A set of important applications can benefit from RC devices • RC offer potential for substantial performance improvement at a low cost • RC devices will soon be mainstreamin the embedded computing world; perhaps in the future they will also permeate the desktop U V R Pentium V CMU Reconfigurable Computing