An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Overview • Extraction tests: TT40 and TT60, week 21 • controls and data, interlocking, extraction, MKE6 transfer function and energy tracking, high intensity, injection sequencing • TL tests: TI2 and TI8 to downstream TEDs, weeks 23, 26 • instrumentation, controls and data, energy matching, trajectory, DFS, optics, aperture, multibunch • Injection tests: TI2 and TI8, injection regions to LHC collimators, weeks 36, 37 • instrumentation, controls and data, trajectory, DFS, optics, aperture, dispersion matching, coupling, kicker waveform

  2. TT40 to upstream TED – week 21

  3. TT60 to upstream TED – week 21

  4. TI8 to downstream TED – week 23 (w/e)

  5. TI2 to downstream TED – week 26 (w/e)

  6. TI8 to LHC IR7 – week 36 (w/e 29/30th aug?)

  7. TI2 to LHC IR3 – week 37 (w/e 5/6th sep?)

  8. General issues • TT40/60 • TT40 interference with CNGS in W21 – move TT40 date or block 4-8 hours from CNGS programme? • “high intensity” beams and full LHC cycle ready in SPS for SPS W21? • Special conditions for high intensity to upstream TEDs – e.g. limit on total p+? • All conditions available for testing filling patterns and injection sequencing? • TLs • Follow-up with LHC experiments, LHC access, LHC shutdown, etc. for TL tests… with OP - confirmed as Rossano? • Multibunch requirements for BI – 12 pilots OK? Experiments? • High(er) intensity beam to downstream TEDs? • Injection tests • Scope of injection tests – plan for beam 2 to IR6 with LBDS? • Second injection test presently scheduled w/e of W37 but Jeûne Genevois (again). Can we aim at for TI8 29/30th aug, TI2 5/6th sep?

  9. Other known issues