ChocoPlane Project

ChocoPlane Project. Software Engineering II Exercise I. Problem Statement. Goal: Construct an Airplane that carries a choco-kiss as far as possible without harming it. Chocoplane Requirements. Functional Requirements: The airplane has to fly The airplane carries a Cocoa-Kiss

duane
Télécharger la présentation

ChocoPlane Project

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ChocoPlane Project Software Engineering II Exercise I

  2. Problem Statement • Goal: Construct an Airplane that carries a choco-kiss as far as possible without harming it.

  3. Chocoplane Requirements • Functional Requirements: • The airplane has to fly • The airplane carries a Cocoa-Kiss • Nonfunctional Requirements • Takeoff is the porch area outside the seminar room. • The Cocoa-Kiss is not damaged at take-off

  4. Chocoplane Project Organization • 5 teams with 6 participants each • Each team builds its own solution • Resources: • Everything you can find at TUM or the Lidl-Supermarkt (shortly before Garching) can be used to build the plane

  5. Schedule • Project Duration: 15:00 - 16:40 • Development time: 15:00-15:45 • Integration testing: 15:45- 16:00 • Mile Stone: Client Acceptance Test: 16:15-16:30 • The teams perform their flights simultaneously • Determination of the winner: 16:30

  6. Acceptance Criteria • The plane must prominently display the name of the subsystem team • The plane must actually demonstrating flying behavior (throwing is not allowed) • The Cocoa-Kiss must be undamaged after landing • The client inspects the Cocoa-Kiss after the plane has come to complete standstill and determines its healthiness.

  7. Prize • The team whose plane actually flies, and covers the longest distance wins a prize • The distance is measured from the wall of the building to the first contact on the ground. • Metrics used by the client: • State of Cocoa-Kiss: damaged (0 points), undamaged (30 points) • Length of flight: 0 m: 0 points, 1-5 m: 30 points, 5-15 m: 40 points, 16-20 m: 50 points, 21 or more m: 60 points • Beauty of flight: Throwing: 0 points, Flying: 30 points

  8. The Crew of Cocoa-Airlines wishes you a good flight Have fun!

  9. Development Laboratories • Team 1: Seminar room • Team 2: Glas room • Team 3: Aquarium • Team 4: Terrarium • Team 5: Aurarium