1 / 31

M/G/1/MLPS Queue Mean Delay Analysis

This document explores the analysis of mean delay in M/G/1 queues, focusing on Multi-Level Processor Sharing (MLPS) and Decreasing Hazard Rate (DHR) service times. It discusses bandwidth sharing in IP networks, emphasizing the impact of flow characteristics, such as elastic flows in the context of TCP. The study compares various service disciplines, including Foreground-Background (FB) and Processor Sharing (PS), while examining their efficiency in minimizing mean delay and unfinished work among elastic flows. Current work aims to optimize flow management strategies to enhance network performance.

duante
Télécharger la présentation

M/G/1/MLPS Queue Mean Delay Analysis

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. M/G/1/MLPS QueueMean Delay Analysis Samuli Aalto (TKK) in cooperation with Urtzi Ayesta (LAAS-CNRS) and Eeva Nyberg-Oksanen

  2. Outline • Introduction • DHR service times • IMRL service times • Ongoing work

  3. Application: bandwidth sharing in IP networks • Consider a bottleneck link in an IP network • loaded with elastic flows, such as file transfers using TCP • if RTTs are of the same magnitude, then approximately fair bandwidth sharing among the flows • Intuition says that • favouring short flows reduces the total number of flows, and, thus, also the mean delay at flow level (that is, the average file transfer time) • How to service flows and how to analyse? • Guo and Matta (2002), Feng and Misra (2003), Avrachenkov et al. (2004), Aalto et al. (2004,2005,2006)

  4. Queueing model • Assume that • flows arrive according to a Poisson process with rate l • flow size distribution is ”heavier” than exponential, such as hyperexponential or Pareto • So, we have a M/G/1 queue at flow level • customers in this queue are flows (and not packets) • service time = the total number of packets to be sent • attained service = the number of packets already sent • remaining service = the number of packets still left

  5. Optimality results for M/G/1 • Schrage (1968) • If the remaining service times are known, then • SRPT is optimalminimizing the mean delay • Yashkov (1987) • If only the attained service times are known, then • DHR implies that FB is optimalminimizing the mean delay • Remark: We consider work-conserving (WC) and non-anticipating (NA) service disciplines p such as FB, MLPS, and PS (but not SRPT) for which only the attained service times are known

  6. Service disciplines at flow level • FB = Foreground-Background = LAS = Least Attained Service • Choose a packet from the flow with least packets sent • MLPS = Multi Level Processor Sharing • Choose a packet from a flow with less packets sent than a given threshold • PS = Processor Sharing • Without any specific scheduling policy at packet level, the elastic flows are assumed to divide the bottleneck link bandwidth evenly • Reference model: M/G/1/PS

  7. FCFS+PS(a) a MLPS disciplines • Definition: MLPS discipline, Kleinrock, vol. 2 (1976) • based on the attained service times Xi(t) • N+1levels defined by N thresholds a1< … <aN • between levels, a strict priority is applied • within a level, an internal discipline (FB, PS, or FCFS) is applied Xi(t) PS FCFS t

  8. Our objective • We compare MLPS disciplines in terms of the mean delay • MLPS vs PS • MLPS vs MLPS • We assume that service times are • DHR • IMRL • Note: • DHR Ì IMRL

  9. References • K. Avrachenkov, U. Ayesta, P. Brown and E. Nyberg (2004) • IEEE INFOCOM • S. Aalto, U. Ayesta and E. Nyberg-Oksanen (2004) • ACM SIGMETRICS – PERFORMANCE • S. Aalto, U. Ayesta and E. Nyberg-Oksanen (2005) • Operations Research Letters 33 • S. Aalto and U. Ayesta (2006a) • IEEE INFOCOM • S. Aalto and U. Ayesta (2006b) • to appear in Journal of Applied Probability • S. Aalto (2006) • to appear in Mathematical Methods of Operations Research

  10. Outline • Introduction • DHR service times • IMRL service times • Ongoing work

  11. DHR service times • Service time distribution: • Density function: • Hazard rate: • Definition: • Service time distribution belongs to class DHR (Decreasing Hazard Rate) if h(x) is decreasing • Examples: • Pareto (taking values from 0 on) and hyperexponential

  12. Unfinished truncated work Ux • Customers with attained service Xi(t) less than x: • Unfinished truncated work with truncation threshold x: • Unfinished work:

  13. Optimality of FB • Aalto et al. (2004): • FB minimizes the unfinished truncated work for any x and t in each sample path Xi(t) Ux(t) FCFS FB s s x x t t

  14. Idea of the mean delay comparison • Kleinrock (1976): • For all WC & NA service disciplines p • so that (by applying integration by parts) • Thus,

  15. MLPS vs PS • Aalto et al. (2004): • Two levels with FB and PS allowed as internal disciplines • Aalto et al. (2005): • Any number of levels with FB and PS allowed as internal disciplines FB FB/PS PS FB/PS FB/PS

  16. Mean unfinished truncated work bounded Pareto service time distribution

  17. MLPS vs MLPS: changing internal disciplines • Aalto and Ayesta (2006a): • Any number of levels with all internal disciplines allowed • MLPS derived from MLPS’ by changing an internal discipline from PS to FB (or from FCFS to PS) MLPS MLPS’ FB/PS PS/FCFS

  18. MLPS vs MLPS: splitting FCFS levels • Aalto and Ayesta (2006a): • Any number of levels with all internal disciplines allowed • MLPS derived from MLPS’ by splitting any FCFS level and copying the internal discipline MLPS MLPS’ FCFS FCFS FCFS

  19. MLPS vs MLPS: splitting PS levels • Aalto and Ayesta (2006a): • Any number of levels with all internal disciplines allowed • The internal discipline of the lowest level is PS • MLPS derived from MLPS’ by splitting the lowest level and copying the internal discipline • Splitting any higher PS level is still an open problem (contrary to what we thought in an earlier phase)! MLPS MLPS’ PS PS PS

  20. Outline • Introduction • DHR service times • IMRL service times • Ongoing work

  21. IMRL service times • Service time distribution: • H-function: • Mean residual lifetime: • Definition: • Service time distribution belongs to class IMRL (Increasing Mean Residual Lifetime) if H(x) is decreasing • Examples: • all DHR service time distributions, Exp+Pareto

  22. Level-x workload • Customers with attained service less than x: • Unfinished truncated work with truncation threshold x: • Level-x workload: • Workload = unfinished work:

  23. Non-optimality of FB • Aalto and Ayesta (2006b): • FB does not minimize the level-x workload Xi(t) Vx(t) FCFS FB not optimal FB s s x x t t

  24. Idea of the mean delay comparison • Righter et al. (1990): • For all WC & NA service disciplines p • so that (by applying integration by parts) • Thus,

  25. MLPS vs PS • Aalto (2006): • Any number of levels with FB and PS allowed as internal disciplines • Aalto and Ayesta (2006b): • Any number of levels with FB and PS allowed as internal disciplines FB/PS PS FB/PS FB/PS

  26. Mean level-x workload bounded Pareto service time distribution

  27. Non-optimality of FB • Aalto and Ayesta (2006b): • FB does not necessarily minimize the mean delay for IMRL service times • Counter-example: • Exp+Pareto belongs to IMRL but not DHR (for 1 < c < e): • There is e> 0such that FB FB FCFS

  28. Outline • Introduction • DHR service times • IMRL service times • Ongoing work

  29. Gittins index • Gittins (1989): • J-function • Gittins index for a customer with attained service a: • Gittins discipline serves the customer with highest index • Gittins discipline minimizes the mean delay in M/G/1 (among NA disciplines): • If DHR, then FB optimal • If NBUE, then FCFS optimal • If CHR+DHR, then FB, FCFS, or FCFS+FB optimal

  30. Bandwidth sharing networks • Bandwidth sharing network • multiple links shared by elastic flows with different routes • necessary stability conditions: for all links l, • Verloop et al. (2005): • global SRPT instable in the network case, that is necessary stability conditions are not sufficient • However, local SRPT (applied to each route separately) is stable and reduces the mean delay in an optimal way

  31. THE END

More Related