1 / 9

Geothermal: The environmental answer to non-intermittent generation?

Geothermal: The environmental answer to non-intermittent generation?. Istanbul, October 10 th 2013. Matthias Kliesch Region West. Short introduction into geothermal power generation hydrothermal System. Source: EnBW. Risk Analysis Risk Assessment Workshop.

dwayne
Télécharger la présentation

Geothermal: The environmental answer to non-intermittent generation?

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Geothermal: The environmental answer to non-intermittent generation? Istanbul, October 10th 2013 Matthias KlieschRegion West

  2. Short introduction into geothermal power generationhydrothermal System Source: EnBW

  3. Risk AnalysisRisk Assessment Workshop • Defining, identifying and quantifying (likelihood and magnitude) of risks in a structured procedure. • Determination of risk tolerance or capability of bearing risks on balance • Definition of risk • Structured identification and screening in sectors of • – operational, • – financial, • – strategic and • – political risks • Quantification of top risks • Management/Handling of risks, comments on insurability • => clear understanding of the major risks.

  4. Risk AnalysisRisk Assessment Workshop

  5. Loss HistoryAccumulated Indemnifications • Examples on drilling risk and Lost in Hole (LiH) losses • 1100 m 13 3/8“ Casing fallen 500-600 m deep into the well • Casing stuck when ran in hole • Casing collapse at injection test • Well instability => stuck drill pipe • Differential Sticking => stuck drill pipe • Memory Tool lost close to the well head • Losses often occur when well design is changed during the drilling phase! A diligentrisk evaluation is still required A: exploration risk B: drilling risk and LiH C: losses during operational phase

  6. Loss Historyamounts of losses • Examples on operational phase losses • Compensation tank collapsed while discharging • Leakages on shell type heat exchangers due to inappropriate seal material • Pump (ESP) motor burned • Pump (ESP) frequency converter failed • Pump (Lineshaft) corrosion at rising pipe • Pump (Lineshaft) broken lineshaft • Turbine, rotor failiure A: exploration risk B: drilling risk and LiH C: losses during operational phase

  7. Loss Historydistribution of magnitudes • Examples exploration risk losses • Total loss dry well • Stimulation measures to increase volume flow • Sidetrack/Multilaterals • Increase filter length • Increase diameter of filter length • Massive acidising under pressure • Importand: intense cleaning of the well after drilling especially injector

  8. Contakt Matthias Kliesch Key Client Executive Marsh GmbH Kasernenstr. 69 D-40213 Düsseldorf] Telefon +49 (0)211-8987-373 Telefax +49 (0)211-8987-621 Mobil +49 (0)1520-1624-373 Matthias.Kliesch@marsh.com www.marsh.de Marsh GmbHKasernenstraße 6940213 Düsseldorf Telefon: (02 11) 89 87-0 Telefax: (02 11) 89 87-369

  9. Sitz: Frankfurt am Main; Handelsregister: HRB 12141; Amtsgericht: Frankfurt am Main HSBC Trinkaus & Burkhardt (BLZ 300 308 80) 1260 014 Geschäftsführung: Siegmund Fahrig (Vors.), Dr. jur. Georg Bräuchle, Oliver Dobner, Dr. jur. Peter Hoechst, Jochen Körner, Erwin Lehmann, Thomas Müller Vorsitzender des Aufsichtsrates: Sven Alexander Kado

More Related