SESAR. The Technological Pillar of the Single European Sky. European Challenges: Traffic forecast to double by 2025 Growth must come with significant performance sustainability Issues: ATC pushed to its limits; obsolescent technologies; airspace fragmentation Less environmental impact.
E N D
SESAR The Technological Pillar of the Single European Sky
European Challenges: • Traffic forecast to double by 2025 • Growth must come with significant performance sustainability • Issues: ATC pushed to its limits; obsolescent technologies; airspace fragmentation • Less environmental impact SESAR Technical/operational change, supported by Single European Sky legislation Direct involvement of aviation industry in all phases Address European needs and Global interoperability Needs: Turn off fragmented approach Accelerate evolution in response to challenges Synchronise plans and actions from research to operations airborne and grounddeployments SESAR:Technological Pillar of SES A new ATM System is required
SESAR Technological Pillar of SES • Technology – developed and deployed • SESAR – ‘Single European Sky ATM Research’ Concentrates all European R&D efforts in a single programme • SESAR Joint Undertaking will drive technological improvements in line with the ATM Master Plan • SESAR to ensure sustainable air transport development in Europe through a performance driven approach • SESAR Operational Deployment • Evolutionary approach: phased delivery according to operation/business need and maturity level • SES Interoperability Regulation will support SESAR with Implementing Rules • SES Performance Regulation will support SESAR with incentives through targets at Community level to move service providers to a more business-oriented approach • Not just in Europe. . . . . . . . . • European Legislation affects everyone at a global level and will drive innovation, development and deployment of technological change
SESAR – International Cooperation • Air transport is a ‘business’ on a global scale • The need for change is increasing • Many of the same operations, performance and technology issues already occur, or will shortly occur outside of the Single European Skies area • Modernisation is therefore a world-wide issue • While regional problems need to be solved, • account also needs to be taken of the global impact • Today’s Regional problems become tomorrows Global issues and must be solved only once • We need to look outside our regions to avoid the local-only solutions, and see the global context
SESAR – Technology Strategy for ATM • Aircraft systems will play an increasingly significant role in the future ATM operating concept • Technology-centric methods of operation, both on board aircraft and on the ground • Essential to reach interoperability agreements outside of our own regions on areas including trajectory management • We are entering a more ‘Information Centric’ world • We need the right information in the right places, with the right people and at the right times to ensure that decisions are taken that deliver the optimum solution at that time • Realisation of an ‘ATM Intranet’ – the ‘system of systems’ • We are far from having this capability across the ATM network today, so many operational, environmental and business inefficiencies still exist
SESAR – Action Now And Vision For Tomorrow • Meeting the demands for change depends on a pragmatic approach using proven solutions developed in partnership • We use operational trials to build trust, understanding and confidence in the solution, thus accelerating the pace of change • Actions today includes; DataLink, airspace management and capacity planning tools, Flight data processing, controller tools, and Atlantic Interoperability Initiative to Reduce Emissions (AIRE)
SESAR – Delivering Through Partnership • Europe needs solutions suitable for our different airspace types and operational traffic densities • Many of these airspace types exist elsewhere in the world • We are already looking at how SESAR aligns with NextGen • European Union legislation will drive regulation and standardisation • In order that change occurs for all participating countries at the same time • Specifications (as a means of compliance) will be developed with our key partners and stakeholders, including EUROCAE • SESAR Joint Undertaking, along with its partners is committed to looking for solutions under Single European Skies that are also suitable for use outside of Europe
SESAR – An International Programme • We will be working to align and maintain our goals and strategies internationally whilst delivering concrete results every 1-2 years, many of these being deployed into operation • We are committed to ensure that true interoperability is really delivered • International cooperation is one of our highest priorities • The SESAR Joint Undertaking is committed to apply all our efforts to make it a success through our partnerships and communication initiatives • SESAR Joint Undertaking is open to membership by non-EU organisations • Other regions and countries need to tackle many of the same ATM issues sooner or later • SESAR is meeting with other organisations, countries/regions on membership or agreements leading to specific areas of technical cooperation • We can work together either via our partners or directly if appropriate
SESAR – Building Global Partnerships • Partnerships needed to accelerate the implementation of SESAR solutions • Pragmatic approach focused on gathering experience from live trials • Hasten the implementation of solutions locally, as well as from a pan-European and global perspective • Building on existing initiatives such as AIRE, SESAR will establish a series of gateway airports and associated air navigation service providers, airspace users and the supply industry to pioneer the implementation of SESAR Asia/Pacific North/Central America Within Europe Latin America Middle-East Africa Illustrative
SESAR – In Partnership With ICAO • Many operational and technological changes need to be agreed at an international level, for example: • Definition and exchange format of the 4-D trajectory (Network Operations Plan, Flight Plan, time synchronisation), System-Wide Information Management, Collaborative Decision Making, Information Definitions and Security, Airspace Management, Capacity Planning, etc • ICAO to facilitate the coordination of these international activities, meeting the schedule needs of SESAR • Forum SESAR-NextGen, 8-10 September 2008
ICAO Conformance • The SESAR ConOps follows ICAO Global ATM Operational Concept Document • In line with ICAO Global Air Navigation Plan • ICAO Performance Manual with the 11 Key Performance Areas
SESAR – Overall Structure • SESAR is organised in three phases: • The definition phase (2006-2008), co-funded by the EC and EUROCONTROL and under the responsibility of the Agency • Resulted in the European ATM Master Plan • The development phase (2008-2016), under the management of the SESAR Joint Undertaking • Based on the Master Plan, will result in new common standards, new operational procedures, new technologies and components • The deployment phase (2015-2025) • Will implement the results of the development phase, delivering the performance increase foreseen in the ATM Master Plan
SESAR Stepwise Implementation 2005 2010 2015 2020 SESAR Phases Definition Development Deployment European ATM Master Plan Implementation Development work Planning work Current work 2005 2010 2015 2020
The SESAR Joint Undertaking • Created by the European Union Council Reg. N°219/2007 • Responsible for the execution of the ATM Master Plan, and in particular the managementof the SESAR Development phase • Two founding members: the EC and EUROCONTROL • Public-private partnership: industry & other States • Management under a single structure of public and private sector funding • Ensures the involvement of all stakeholders of ATM sector • €2,100 million over 8 years
ATM Master Plan: Why? Collaborative application of the operational concept and enablers ATM Master Plan = focused commitment • Shorter term: synchronised implementation actions • Longer term: common research and validation programme Network Performance
2006 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 Operational or technical changes R&D Implementation Available for Operations The Master Plan • One plan for all • Performance Objectives • Operational Evolutions Roadmaps • Supporting Changes • Stakeholder Roadmaps • Benefits and Financing • Risks • Planning Information for Deployment and R&D • Not a one-off systematic Master Planning process • For execution and maintenance in SESAR Development Phase
European ATM Master Plan www.atmmasterplan.eu .
MP Updates MP Updates MP Updates R&D Validation R&D Validation R&D Validation SESAR Work Flows ATM Master Plan (endorsed by EU Ministers, adopted by SJU Admin Board) ATM Master Plan (endorsed by EU Ministers, adopted by SJU Admin Board) ATM Master Plan (endorsed by EU Ministers, adopted by SJU Admin Board) SJU SES Eurocontrol Regulation Standardisation Implementation
The SESAR Partnership (1) • The founding members: • European Community: funding and implementing rules under SES legislative framework • EUROCONTROL: funding (also apportion in kind) and alignment of Agency’s relevant activities under SESAR • An initial group of candidate members: • Air Navigation Services Providers • Airport Operators • Manufacturing industry
The SESAR Partnership (2) • Preselected Candidates • Aeropuertos Españoles y Navigación Aérea • INDRA Sistemas S.A.. • Airbus S.A.S. • Luftfartverket Group • Alenia Aeronautica S.p.A. • North European ATM Industry Group • Deutsche Flugsicherung GmbH NATS Ltd • Direction des Services de la Navigation Aérienne • SESAR European Airports Consortium • ENAV S.p.A. • Selex Sistemi Integrati S.P.A. • Frequentis AG • Thales Group • Honeywell International Inc.
The SESAR Partnership (3) • Funding scheme: 1/3-1/3-1/3 • Founding members provide cash and in kind (EUROCONTROL own resources) • Other members: cash and mainly in kind • Initial first round to be finished by end of 2008 • Second round of membership / associate membership in 2009-2010
The Partnership in practice SJU SJU ATM Network R&D Programme ATM Network R&D Programme WP Management WP Management Target concept & Architecture DFS Master Plan Maintenance EUROCONTROL Master Plan Maintenance LT & Innovative Research EUROCONTROL LT & Innovative Research Transversal Areas Transversal Areas R&D Overall Consistency R&D Overall Consistency Validation Infrastructure ENAV Validation Infrastructure Network EUROCONTROL Network Operations TMA Operations NATS TMA Operations Information Management LFV Information Management Airport IN/SEL Airport SWIM SEL/TH SWIM ATC TH/IN ATC Aircraft AIRBUS NIMS EUROCONTROL Grd CNS TH/SEL En Route Operations DSNA En Route Operations Airport Operations AENA Airport Operations AOC AOC NIMS
SESAR deliverables All Work Packages are expected to deliver concrete results every 1-2 years • All results will be assessed according to: • The benefits they generate • Their alignment to Master Plan performance objectives • A Performance Partnership scheme will be formed in order to: • Assess the contribution of the technical programme to the overall system performance • Make recommendations for changes/updates in the ATM Master Plan
SESAR benefits KEY PERFORMANCE TARGETS • Three-fold increase in capacity • Improving safety by a factor of 10 • Reducing by 10% the environmental impact per flight • Cutting ATM costs by 50%
SESAR is an open programme • Stakeholders (airspace users, staff, military, supervisory authorities) participation in the technical work is being organised now • Non EU organisations can become a member of the SESAR Joint Undertaking: • The country must have signed at least one aviation agreement with the EU • The organisation must send an official request to the SESAR Joint Undertaking • After Board approval, the SJU will start accession negotiations
Conclusions • Air Traffic Management is a global activity, with regional specificities • SESAR is the European programme for ATM systems modernization. It is a single programme, managed by a single entity: the SESAR JU • International Cooperation is one of the top priorities for SESAR, and the SESAR JU is committed to do all efforts to make it a success and to develop solutions that are suitable for use outside of Europe • SESAR is an open programme to the world • SESAR will bring in important improvements/benefits in 4 main Key Performance Areas and ensure worldwide interoperability www.sesarju.eu SESAR Joint Undertaking Rue du Luxembourg 3 Brussels Tel: +32 2 5078000