Autonomous Tracking Unit

DESCRIPTION

Autonomous Tracking Unit. Autonomous Tracking Unit. CPSC 483 - Spring 1999. CPSC 483 - Spring 1999. Autonomous Tracking Unit. John Berglund Randy Cuaycong Wesley Day Andrew Fikes Kamran Shah Professor: Dr. Rabi Mahapatra. Autonomous Tracking Unit. Autonomous Tracking Unit.

1 / 23

Download Presentation
Télécharger la présentation

Autonomous Tracking Unit

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Autonomous Tracking Unit Autonomous Tracking Unit CPSC 483 - Spring 1999 CPSC 483 - Spring 1999 Autonomous Tracking Unit John Berglund Randy Cuaycong Wesley Day Andrew Fikes Kamran Shah Professor: Dr. Rabi Mahapatra

  2. Autonomous Tracking Unit Autonomous Tracking Unit CPSC 483 - Spring 1999 CPSC 483 - Spring 1999 Project Status • Objective • Develop an autonomous camera that can identify and track an object in motion • Project Goals • Develop a 2-dimensional servo control system • Develop a camera platform • Implement an FPGA to camera interface • Develop a memory and camera control system • Develop a motion tracking algorithm • Implement the algorithm in hardware • Integrate components • Graduate ?

  3. Autonomous Tracking Unit Autonomous Tracking Unit SRAM Camera Memory & Camera Control Camera Interface CPSC 483 - Spring 1999 CPSC 483 - Spring 1999 Algorithm Servos Servo Control System Diagram

  4. Autonomous Tracking Unit Autonomous Tracking Unit 17-20ms 0º 160º 1.75ms 1.25ms CPSC 483 - Spring 1999 CPSC 483 - Spring 1999 Servos: Pulse Width Modulation

  5. Autonomous Tracking Unit Autonomous Tracking Unit Bit 7 6 5 4 3 2 1 0 If (bit 7 == 0) { :0] == angle) { If (bit[6 Minimum pulse not reached Minimum+angle pulse length generated. } else { Pulse = 0; Minimum pulse reached Pulse = 1; Test for angle } } CPSC 483 - Spring 1999 CPSC 483 - Spring 1999 Servos: Final Design • 8-bit input angle with 9-bit internal counter • Test the MSB for minimum pulse length • Minimum pulse length => 1|0000|0000b - minimum number of pulses

  6. Autonomous Tracking Unit Autonomous Tracking Unit CPSC 483 - Spring 1999 CPSC 483 - Spring 1999 Servo Control Components

  7. Autonomous Tracking Unit Autonomous Tracking Unit CPSC 483 - Spring 1999 CPSC 483 - Spring 1999 Command Command (8) Memory and Camera Control Camera Interface Module QuickCam Start Reset Hold PCAck Nibble (4) CamRdy Data (8) Send Valid Camera Interface II Goals: • Remove asynchronous data exchange • Reduce complexity of controlling logic • Provide a configurable initialization sequence

  8. Autonomous Tracking Unit Autonomous Tracking Unit CPSC 483 - Spring 1999 CPSC 483 - Spring 1999 Camera Interface II Components

  9. Autonomous Tracking Unit Autonomous Tracking Unit CPSC 483 - Spring 1999 CPSC 483 - Spring 1999 Camera Interface II Success! • Testing Issues • BSII cannot trigger on an edge of a signal • Camera’s CCD decays at a rapid rate • Performance Measurements • Store a 128x120 image in 32 ms (31 fps) • Future Improvements • Implement the byte mode transfer • Implement memory storage logic inside the interface

  10. Autonomous Tracking Unit CPSC 483 - Spring 1999 Memory & Camera Control (MCC) “Memory System: This will involve implementing an SRAM interface that will store image representations and allow for them to be accessed by other system components.” • Isolates the Algorithm from the details of memory access and camera control • This module went through several design changes

  11. Autonomous Tracking Unit Autonomous Tracking Unit CPSC 483 - Spring 1999 CPSC 483 - Spring 1999 Original MCC Design • Asynchronous communications with the Algorithm and the Camera Control Module • 256x243 pictures and 6-bit pixels • Expected to use 256K of memory to store 3 frames • Did not unpack the pixels • Complex initialization sequence • Tested in simulation

  12. Autonomous Tracking Unit Autonomous Tracking Unit CPSC 483 - Spring 1999 CPSC 483 - Spring 1999 Frame (3 bit) Vertical Offset (7 bits) Horizontal Offset (6 bits) MCC Final Design • Fifth and final design • One bit Command • Streams data from the camera synchronously • Camera Control module writes directly to memory • 64K of addressable memory, 8K needed • Reduced frame size to 128x120 Final Memory Addressing Scheme

  13. Autonomous Tracking Unit Autonomous Tracking Unit CPSC 483 - Spring 1999 CPSC 483 - Spring 1999 MCC Final Design (Continued) • Tested with BS2 and Camera Control module • Observed inconsistent results • We made a separate project to unit test the MCC • Worked almost perfectly in testing • Needed to the camera’s cord! jiggle

  14. Autonomous Tracking Unit Autonomous Tracking Unit CPSC 483 - Spring 1999 CPSC 483 - Spring 1999 MCC Final Block Diagram

  15. Autonomous Tracking Unit Autonomous Tracking Unit CPSC 483 - Spring 1999 CPSC 483 - Spring 1999 Our “Simple” Environment • Single rigid object • Object is darker than its background • Object is smaller than its background • Object is travelling at a reasonable pace

  16. Autonomous Tracking Unit Autonomous Tracking Unit CPSC 483 - Spring 1999 CPSC 483 - Spring 1999 Algorithm Test & Development • Goal was to develop and test several algorithms • Use software to help us visually compare solutions • Tests were used to compare performance in different scenarios

  17. Autonomous Tracking Unit Autonomous Tracking Unit CPSC 483 - Spring 1999 CPSC 483 - Spring 1999 Algorithm • Step 1: Create a histogram of the object • Step 2: Locate edges by subtracting • Step 3: Calculate the center of the object • Step 4: Adjust camera

  18. Autonomous Tracking Unit Autonomous Tracking Unit CPSC 483 - Spring 1999 CPSC 483 - Spring 1999 Algorithm Issues • Problems: • No object in frame • Partial object in frame • Handshaking timing issues • Solutions: • No object: Use buffers to filter out non-significant deltas • Partial object: Make frame extremes default boundaries of the object • Timing issues: Add more states to ensure correct propagation

  19. Autonomous Tracking Unit Autonomous Tracking Unit CPSC 483 - Spring 1999 CPSC 483 - Spring 1999 System Integration • Phase 1: Integrate Camera Interface Module and Memory & Camera Control Module • Simulated in Xilinx • BSII used to simulate algorithm module • Capture data with PC serial port • Phase 2: Algorithm Module Revision • Image simulated with a Xilinx stub module • Unit integrated with one dimensional movement • Two dimensional movement implemented after testing horizontal and vertical tracking individually

  20. Autonomous Tracking Unit Autonomous Tracking Unit CPSC 483 - Spring 1999 CPSC 483 - Spring 1999 System Integration • Phase 3: Performance Improvement. • Initial unit integration with the Algorithm Module on a 500kHz clock • Increasing Algorithm Module clock resulted in choppy movement, due to Servo operation • Frame clock used to synchronize Servo operation • Decreasing the frame clock period from 20.2ms to 17.0ms increased the image processing rate

  21. Autonomous Tracking Unit Autonomous Tracking Unit CPSC 483 - Spring 1999 CPSC 483 - Spring 1999 Performance(Frame Clock = 20.2 ms) 16.6 images per second

  22. Autonomous Tracking Unit Autonomous Tracking Unit CPSC 483 - Spring 1999 CPSC 483 - Spring 1999 Performance Improvement(Frame Clock = 17 ms) 19.7 images per second 18.7% improvement

  23. Autonomous Tracking Unit Autonomous Tracking Unit CPSC 483 - Spring 1999 CPSC 483 - Spring 1999 Possible Improvements • Use 2 SRAM chips simultaneously • Image is retrieved and processed from one chip while the next image is being stored • Pin limitations • Implement entire unit in Xilinx • Use internal RAM to store histogram information • 130 11-bit storage locations required • 45 CLBs required to store histogram information

More Related
SlideServe
Audio
Live Player
Audio Wave
Play slide audio to activate visualizer