UKNF WP1: Conceptual Design. Status Report, Jan 2006 C.R. Prior. Work Progress. Proton Driver Work on pulse structure 10 GeV FFAG driver (GHR) Pion decay/Muon capture Continued optimisation (SJB) Muon cooling Development of tracking techniques and absorber models (SJB) Acceleration

edna
Télécharger la présentation

UKNF WP1: Conceptual Design

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. UKNF WP1: Conceptual Design Status Report, Jan 2006 C.R. Prior

  2. Work Progress • Proton Driver • Work on pulse structure • 10 GeV FFAG driver (GHR) • Pion decay/Muon capture • Continued optimisation (SJB) • Muon cooling • Development of tracking techniques and absorber models (SJB) • Acceleration • New FFAG modelling code (SM) • Muon Storage Ring • Isosceles triangle design • Detectors • Geometric ring layouts

  3. Non-isochronous FFAG 4 MW Proton Driver • RAL design • 5 bunches per pulse • 50 Hz repetition rate • 10 GeV • Isochronous FFAG with insertions

  4. ≥ 22.43° Neutrinos Neutrinos ± injections End bend Collimation, rf and tune change Muon Storage Ring Designs for 20 and 50 GeV to fit in same tunnel

  5. Triangle Ring Details • Isosceles triangle ring, designed for MW intensities • Includes a beam loss collection system for muons. • Combined (not separated) function magnets in arcs. • Solenoid focusing in the two production straights. • Use bend units at the ends of the production straights. • Matching section bends to suppress dispersion • Lattice is modified when upgrading from 20 to 50 GeV. • Change some magnets • re-align ring.

  6. Muon Beam Loss Collection • Owing to the e±losses after ±decays, the warm bores of S/C arc magnets have to be cooled & clad with Pb. • cladding absorbs > 80% of the e±beam power • Direct ± wall loss also leads to magnet heating • To minimise this, use a ± loss collection system • Primary and secondary collimators in 4 FODO cells at the centre of the short straight section of the ring • Primary collimators are set for: βγA = 30 ( mm r). • Ring acceptances are: βγA = 30 (1.5)2 ( mm r).

  7. Production Straight Focusing • A figure of merit for the focusing in a lattice is: 1 / (γβmax ) • For equal γ (beam angles), a solenoid system has a 50% lower value for βmax. • Design uses eight 4m solenoids in 300.8 m straights: • At 20 GeV, βmax ≈ 97 m for solenoids with 4.3T • At 50 GeV, βmax ≈ 162 m for solenoids with 6. 4T

  8. 20 GeV Lattice Functions (Excluding Production Straights)

  9. Storage Ring Parameters

  10. Injection of n Trains of 80 ±Bunches Long neutrino production straight section . Solenoid 1 Solenoid 2 Solenoid 3 Injection septum Train of 80,  or  bunches Fast kicker magnets, K Superconduc-ting solenoids Stored energy/power of kicker magnets is large owing to the big acceptance and the ~370ns rise and fall times for the 1170.8 m circumference ring, which has n (= 5) injected bunch trains per 50 Hz cycle. Induction kickers may be needed for the upgrade to 50 GeV.

  11. Design Summary • An outline design has been made for two isosceles triangle, 20 (potentially 50) GeV, ±storage rings. • Angles of the triangle depend on ring and target sites. • The MW rings have large βγA, at 30 (1.5)2 ( mm r). • Smallest circumference C = 1170.8 m (straights = 300.8 m). • CERN equilateral ∆, C = 2074.8 m & US1, C =1752.8 m. • Production straight solenoids give lower beam sizes. • Uncooled (45  mm r) ±beams appear impractical. • Dynamic aperture tracking is to being carried out by F. Meot.

  12. Alignment and Orientation of Muon Ring • 6 possible NF sites • RAL, CERN, JPARC, BNL, FNAL, ORNL • 17 possible detector sites • Ascertain which NF site might be suitable for an isosceles ring that directs  to two detectors • Identify possible green field site for second detector, having chosen a first. • What base lines are required? • 700/3000/7500 km?