1 / 3

BOSS BI B eamline O perational S pares S trategy Meeting Wrap-up 27 th May 2014 Rhodri Jones

BOSS BI B eamline O perational S pares S trategy Meeting Wrap-up 27 th May 2014 Rhodri Jones. Wrap-up (I/II). Today’s Objectives Identify the critical instruments for beam operation Present current understanding of BI beamline equipment & spares inventory

egil
Télécharger la présentation

BOSS BI B eamline O perational S pares S trategy Meeting Wrap-up 27 th May 2014 Rhodri Jones

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. BOSSBIBeamline Operational SparesStrategy MeetingWrap-up27th May 2014Rhodri Jones

  2. Wrap-up (I/II) • Today’s Objectives • Identify the critical instruments for beam operation • Present current understanding of BI beamlineequipment & spares inventory Very useful information provided by all • Next Steps – short term • Finalise the inventory of BI beamline components in the injectors • Look in detail with OP into the criticality of all components • This has already started with your classification today – Thank-you • Use risk analysis to prioritise equipment for further scrutiny • Ensure that manufacturing & assembly drawings exist • Identify any missing spare components • Produce a planning for spares production • Using results of risk analysis to prioritise • Conforming to budgetary & manpower constraints • EDMS approval BOSS Meeting - 27/5/2014

  3. Wrap-up (II/II) • Next Steps – longer term • Ensure the BI inventory is fully integrated in the CERN computerised maintenance management system • Beamline equipment • Spare components and assemblies • Put in place tools & procedures to keep BI asset management up to date • Extend to other machines • LEIR, AD, ISOLDE • To be addressed • OP to log use of equipment during re-start to confirm importance • Proposal for end of run “BI check-out” for rarely used instruments • Would highlight any issues early & ensure better availability for next start-up • Tighter vacuum specifications • Recent examples of “old” spares not conforming to new standards • E.g. SPS-BPCR & PS-SEM52) • Post LS1 follow-up with VSC foreseen to address this point A Big Thank-You to all Speakers for their Participation BOSS Meeting - 27/5/2014