2 nd Mini-For um for Central-Southern European Region. EuroPEX Discussion Points Milan, 17 th of Ju ly 2006. Transparency – The Goals.
E N D
2nd Mini-Forum for Central-Southern European Region EuroPEX Discussion Points Milan, 17th of July 2006
Transparency – The Goals • Provide transparency on fundamentals that have a “noticeable impact on prices” in order to create a more level playing field and thus enhance market trust by reducing the risk of insider trading, and abuse of dominant position • Facilitating monitoring of market developments for both regulators and other stakeholders • Promoting market participation resulting in increased competition and liquidity of the markets • Reducing the risk that the data available provides a distorted picture of the markets and their openness to manipulation • Levellingplaying field for the different trading arrangements (PX-based and OTC) in similar products
Transparency – Consistency and Adequacy of Information Disclosure • Minimum standards to be applied EU-wide • coverage – minimum set of information disclosed • level of detail – compatible for the minimum set of information • definition – compatible to allow effective use of information • time resolution and updating frequency – harmonised • format – ready to use by IT systems • Public disclosure of ring-fencing and “firewalls” methods applied (and approved by the regulator) between the grid operation branches and the rest of vertically integrated companies in order to raise trust in the markets • Information is to be published rather than provided on request
Transparency – PXs asCommon Information Publishers • Improving effectiveness of information publishing and transparency • single point of reference for market data in a jurisdiction • timely and logically consistent disclosure of all relevant information in a jurisdiction (or more of them) • PXs have no direct interest in the markets and can gain no advantage from withholding information • independence from market participants • non-discriminatory access to information disclosed • proven capability to manage commercially-sensitive information • technical competence and established information systems already in place • PXs can facilitate cross-border access to information as their membership is already multinational
Market Coupling - Market design elements • Implicit auctions complemented by hedging instruments represent the most efficient solution to congestion management • implicit auctions are the most efficient short-term method for congestion management • financial Transmission Rights (FTRs) and, where sufficiently liquid compared to cross-border volumes, electricity derivatives are preferred hedging instruments • physical Transmission Rights (PTRs) with UIOSI are possible interim solution • Price difference bids (or ‘capacity bids’, but for firm flow obligations) if desired and beneficial to the market • Implicit intra-day cross-border markets: continuous matching, or intraday market coupling, or both
Market Coupling - Governance of Market Coupling • Recognised as a critical issue • PXs have a critical role in market coupling: provide orders, enable firm positions, clear and settle • Governance needs to reflect roles and responsibilities of TSOs and PXs • TSOs: capacity allocation according to regulation • PXs: price formation, fair and orderly market, may be regulated • Market coupling should be supported by a Central Coupling Office (CCO) – possibly jointly owned • contractual interface to TSOs and PXs • possible role of CCO in price formation • limit regulation to existing scope, and may vary locally
Market Coupling - Way Forward • EuroPEX should play an active role on two aspects: • need to define a longer-term model • need to define a strategy for transition towards the longer-term model – how build on existing/planned arrangements? • Institutional and governance issues are crucial in progressing towards a common approach to congestion management • EuroPEX can facilitate consultation process across markets