FIRESIDE CHAT February 27, 2012

FIRESIDE CHAT February 27, 2012. Pews. Ratigan-Schottler Pioneer Refinishing Delivered/Installed Solid Oak Pews Strip/refinish $42,200 597’ – 42 pews Replace kneelers $13,000 Total $57,392 $55,200 deduct (assist) ($1,319) Tax(6%) $ 3,364.38 $

elaine
Télécharger la présentation

FIRESIDE CHAT February 27, 2012

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. FIRESIDE CHATFebruary 27, 2012

  2. Pews Ratigan-Schottler Pioneer Refinishing Delivered/Installed Solid Oak Pews Strip/refinish $42,200 597’ – 42 pews Replace kneelers $13,000 Total $57,392 $55,200 deduct (assist) ($1,319) Tax(6%) $ 3,364.38 $ Pew sponsorship – $1,500 per pew (38)

  3. Gunder Church Furniture $53,256.36 Includes delivery, installation, & taxes Requires two people to assist installers

  4. CARPET Hanson Furniture Zem’s Furniture Carpet/glue $14,066.76 $10,830.07 (with $950 rebate) Installation/demolish $ 4,870.00 $ 3,820.50 Plus tax $ 1,193.21 $ 879.03 The sanctuary needs new underlayment Does not include to glue carpet direct, the altar may need removal. it also. The two long steps need repair.

  5. Conrad-Schmitt $150,000 - $206,000 (Mural in the of sanctuary and front wall, if done separately, will cost $94,380.) Decorate all plastered surfaces above the main floor of St. Lawrence to include sanctuary, nave, balcony, and narthax, not stairways or vestibules. 23kt gold leaf to be applied in different locations within the church. With mural of God the Father receiving His Son, the bid would be $178,380, which includes the fiberglass covering of the large cracks. Without the mural, deduct $10,000. Additional $28,310 to fiberglass all large flat wall and ceiling surfaces with an 18 mil thick polymer coat. All large cracks will be routed out, caulked and covered with fiberglass mesh. Large “living” cracks may reappear, but this is the best procedure to prevent any recurrence.

  6. RIEHLE $120,000 - $175,000 + taxes (Art work of sanctuary and front wall, if done separately, will cost $80,000.) Decorate all plastered surfaces above the main floor of St. Lawrence to include sanctuary, nave, balcony, narthax, and stairway. Install polymer system to all walls and ceilings. Furnish steel scaffold. Owner to unload and load scaffold. Custom made reredos