API 17N Subsea Production System Reliability and Technical Risk Management

API 17N Subsea Production System Reliability and Technical Risk Management. Don Wells Hess Corporation. History / Status. Document released in 2009 Specificatio n contains: Life Cycle Process ( LCP ) Define, Plan, Implement, Feedback ( DPIF ) Loop 12 Key Practices ( KP )

elata
Télécharger la présentation

API 17N Subsea Production System Reliability and Technical Risk Management

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. API 17NSubsea Production System Reliability and Technical Risk Management Don Wells Hess Corporation

  2. History / Status • Document released in 2009 • Specification contains: • Life Cycle Process (LCP) • Define, Plan, Implement, Feedback (DPIF) Loop • 12 Key Practices (KP) • Technology Qualification Process • Technology Readiness Level

  3. Why Change? • BSEE Wants: • Prevent Prescriptive Standards • Self-regulation by the Industry • Issues with 17N: • Operational Goals & Requirements • Unbalanced Life Cycle Processes • Technology Readiness Level Use & Implementation

  4. Plan / Path Forward • Process • Split into 5 subgroups • Industry Leaders • Common Template • Introduce IM into the scope of 17N: • Define IM • Expand the Life Cycle Processes • Reassessment through remediation • Define TRL progression

  5. Detail • Expand the LCP • Provides balance and depth to the document • Communication of goals & requirements

  6. Detail • Change to a Dual-DPIF Loop • Define – Plan – Implement - Feedback • Add Remediation cycle • Facilitates Integrity Management

  7. Detail

  8. Detail

  9. Detail • Change to a Dual-DPIF loop • Add Remediation cycle • Facilitates Integrity Management

  10. Next • Remaining challenges: • Incorporating Human Factors • Decommissioning (Well Abandonment) • Document Matrix • Technology Qualification Appendix • 17N is currently in first edition drafting • Final Draft Review late-Q2 2013 • Peer & Industry Review Q3 2013 • Submittal Planned Q4 2013