An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NDIA ICPMProgram Assist Capabilities Update September 14, 2009 Jesse Stewart September 14, 2009

  2. Types of Program Assists & Tools • Initial enterprise focus will be on Program Advisory Teams (which could include mentoring and coaching) & Program Transition Workshops • Development of a Subject Matter Expert (SME) talent management and access process • Results of efforts will inform the development of targeted Team Training, Communities of Practice, Peer Reviews and other tools and assists Program Assists Executive Coaching Team Training SME Management & Access Program Transition Workshops Program Advisory Teams Mentoring Peer Reviews Communities of Practice Problem Solving Workshops 8/12/2009 2

  3. C A CDD CPD Lifecycle Opportunities for Program Assist • The Materiel Development Decision precedes entry into any phase of the acquisition management system • Entrance Criteria met before entering phase • Evolutionary Acquisition or Single Step to Full Capability User Needs Technology Opportunities & Resources B IOC FOC Materiel Solution Analysis Technology Development Engineering and Manufacturing Development Production & Deployment Operations & Support ICD Materiel Development Decision FRP Decision Review Post PDR Assessment Post CDR Assessment AoA PDR CDR Pre-Systems Acquisition Systems Acquisition Sustainment Initial Capabilities Document (ICD) Capability Development Document (CDD) Capability Production Document (CPD) PDR: Preliminary Design Review CDR: Critical Design Review FRP: Full Rate Production IOC: Initial Operational Capability FOC: Full Operational Capability Weapon Systems/IT Systems/Services

  4. Focus on Program Advisory Teams & Program Transition Workshops Program Transition Workshops Program Advisory Teams Helps focus government and industry teams at critical program inflection points • Program Initiation • Early Milestone transitions • Re baseline efforts • Post Nunn-McCurdy • Other Provides tailored assistance in typically difficult program areas • Acquisition Strategy • RFP Development • Cost/EVM Processes • Risk • Milestone Preparation • IMP/IMS, etc. • Major Reviews • Nunn-McCurdy Recovery 8/12/2009 4

  5. Status Discussed at senior service management level • Partnering with Components to leverage expertise • Necessary Cultural shift—accepting of assistance • Minimizing footprint of overhead • Program Advisory Teams (PAT) • Program Transition Workshops • SME identification and potential short term assignments • SME usage subject to internal service priorities Near Term Actions • Navy and Air Force working through internal processes • Army establishing SME policy and possible candidates as well as potential program assist candidates • Discussions with components and functional leads on CONOPS