Dresser-Rand is committed to enhancing operational efficiency within the oil, gas, chemical, and petrochemical industries. This project focuses on process improvement in the Compressor Assembly Area, aiming to reduce cycle times while ensuring safe and efficient workspace conditions. By applying lean manufacturing principles, we strive to improve workflow, eliminate bottlenecks, and create value with minimal resources. Participants will gain hands-on experience in a dynamic factory environment, collaborating with industry leaders and exploring opportunities for career advancement.

elke
Télécharger la présentation

Optimizing Compressor Assembly Through Lean Manufacturing Techniques

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. P10457: D-R Process ImprovementCompressor Assembly Area-----------Patrick Muldoon

  2. “Dresser-Rand is positioned to deliver a complete package of solutions, from initial concept to equipment retirement for the worldwide oil and gas, chemical, petrochemical, and process industries.” http://www.dresser-rand.com/default_p&s.asp http://www.dresser-rand.com/ Lean Manufacturing ~ More Value With Less Work

  3. Project Objective • Process Improvement on a critical assembly area within Dresser-Rand Corporation. • Goal: • Reduce cycle time of the Compressor Assembly Area. • Create safe & operational work areas. • Improve flow // Eliminate problem areas. Lean Manufacturing ~ More Value With Less Work http://www.dresser-rand.com/recip/eq/default.asp

  4. Connection to Past MSD Projects • P08455 – Value Engineering in a Manufacturing Facility • Compressor Final Internal Assembly Stand • P09457 – Process Improvement Project • Piping and Packaging Line From P08455 Final Drawing Package Photo taken by P09457 Lean Manufacturing ~ More Value With Less Work http://www.dresser-rand.com/recip/eq/default.asp

  5. Interest Areas • Lean Techniques • Simulation // Modeling • Custom Tooling • Plant Layout // Factory Analysis • Cost Reduction • Inventory Management Lean Manufacturing ~ More Value With Less Work http://www.dresser-rand.com/recip/eq/default.asp

  6. What to Expect • A stimulating 22 week project. • Hands-on work in a factory setting. • Direct interaction with customer. http://www.dresser-rand.com/insight/Summer08/Story_Proactive.html Lean Manufacturing ~ More Value With Less Work http://www.dresser-rand.com/oil&gas/pop_dr-7.htm

  7. Possible Opportunities & Outcomes • Work together with employees in a multi-billion dollar corporation. • Potential career opportunities. • First hand experience in the development of lean manufacturing. • Tooling design and execution. Lean Manufacturing ~ More Value With Less Work http://www.dresser-rand.com/steam/SST/RLHA.asp

  8. MSD - P10457 Enroll now! This offer won’t last long! www.dresser-rand.com Lean Manufacturing ~ More Value With Less Work