Understanding and Managing Project Costs Session 8
260 likes | 427 Vues
Understanding and Managing Project Costs Session 8. Review of Session 7. Subcontractor performance can impact cost by: adding labor costs due to delay not accomplishing work anticipated requiring additional work by your crews defaulting or refusing to do work. Review of Session 7.
Understanding and Managing Project Costs Session 8
E N D
Presentation Transcript
Review of Session 7 • Subcontractor performance can impact cost by: • adding labor costs due to delay • not accomplishing work anticipated • requiring additional work by your crews • defaulting or refusing to do work An AGC Construction Learning Tool
Review of Session 7 • Management can reduce cost impact by subcontractors • during the bid period • during the buyout of subcontracts • before subcontract work begins • while the subcontractor is on the job • before the subcontractor leaves the job An AGC Construction Learning Tool
Unanticipated Costs and Their Impact • Costs not anticipated in estimate • From a variety of sources, but can be reduced by positive jobsite management • Knowledge of regulations • Plans to avoid accidents and occurrences • These costs come directly from anticipated profit An AGC Construction Learning Tool
Safety-related Losses • Direct Costs: • Lost time for employees injured • Lost crew time due to disruptions • Damaged equipment, material, in-place construction • Investigation costs An AGC Construction Learning Tool
Safety-related Losses • Indirect Costs • Low productivity • Higher workers comp rates • Higher EMR, resulting in higher rates, and indication of safety program An AGC Construction Learning Tool
Example Costs • Workers Comp • Medical costs $ 10,550.00 • Wages costs $ 6,440.00 • Direct Costs: • Crew lost time 512.00 • OSHA fine $ 5,000.00 • Superintendent time $ 1,600.00 • Additional safety training $ 1,280.00 • Total Costs $ 25,342.00 An AGC Construction Learning Tool
Example Costs • Crew produces $30.96 profit per day • Cost of accident comes from profit • $25,342.00/30.96 = 818 days • Crew needs to work 818 days or 3 years and 3 months to recover accident costs! An AGC Construction Learning Tool
The EMR Advantage • EMR = Experience Modification Rate; factor based on accident claims • Average EMR = 1.0 • Good safety performance: less than 1.0 • Poor safety performance: more than 1.0 • EMR affects Workers Comp rates: • Example: EMR 1.0 has rate of $1.50/hr. • EMR of .6 has rate of $.90/hr • EMR of 1.5 has rate of $2.25/hr An AGC Construction Learning Tool
Example Comparison(Total based on 15,000 labor hours) An AGC Construction Learning Tool
Top 10 Cited Violations • Guardrails not provided at open-sided floors or platforms • No head protection (hard hats) • Ground fault protection not provided • Electrical path to ground missing (ground plug cut off) • Protective systems not provided at excavation and trenching An AGC Construction Learning Tool
Top 10 Cited Violations • Scaffold toe boards/guardrails not installed • Personal protective equipment not used (respirators, etc.) • Stair rails not installed (4+ risers) • Approved containers for flammable liquids not used • Poor housekeeping An AGC Construction Learning Tool
Safety Inspectors Look For: • Safety plan for entire site • Presence of a competent person in charge of jobsite safety program • MSDS available on site • Special current emphasis areas, such as ergonomic work habits, scaffolding, trench safety, fall protection. An AGC Construction Learning Tool
Safety Inspectors Examine: • Conditions that produce 90% of construction fatalities and accidents: • Falls from roofs and elevated platforms • “Struck by” incidents • “Caught in/between” accidents • Electrical accidents An AGC Construction Learning Tool
Superintendent’s Safety Responsibilities • Use a jobsite-specific safety plan • Provide proper protective equipment • Require all subcontractors to submit plans and comply with the jobsite plan • Be sure all workers are oriented to the safety plan and rules • Provide weekly jobsite safety meetings An AGC Construction Learning Tool
Superintendent’s Safety Responsibilities • Maintain a chemical safety program, with plan and MSDS • Provide regular jobsite safety inspections • Provide documentation of all accidents • Maintain communication with employees on safety • Use available resources to help An AGC Construction Learning Tool
Safety Analysis Activity An AGC Construction Learning Tool
Weather Precautions • Securely cover partial construction • Cover concrete with insulating blankets • Install temporary bracing on walls • Install clips and fasteners as systems are installed • Provide temporary heat as necessary An AGC Construction Learning Tool
Environmental Liability Areas • Dust generated by construction • Pollution (other than dust) • Noise and vibration • Storm water generated on the site • Site access • Disposal of construction waste An AGC Construction Learning Tool
Stormwater Plan Activity • Areas to examine: • Construction access • Truck wash-down areas/Concrete truck wash-out • Schedule for site work • Sediment ponds and traps • Filtering of storm water • Soil stabilization • Slope protection • Temporary drainage channels and piping • Pollutant control • Protection of nearby stream An AGC Construction Learning Tool
“Hot” Personnel Policies • Sexual discrimination and harassment • American with Disabilities Act (ADA) • Requires that accommodation be provided to disabled employees • Alcohol and drug policies and programs An AGC Construction Learning Tool
Tool Loss Program • Administer tool inventory program: • Record all tools received by and shipped from jobsite • Implement tool checkout procedure • Monitor tools out for repair • Remove tools from inventory when taking them out of service • Prohibit any tools from leaving the jobsite An AGC Construction Learning Tool
Theft/Vandalism Program • Necessary site fencing • Guards/night watchman • Guard dogs • Security lighting • Alarm systems An AGC Construction Learning Tool
Using on the Job What You Learned Today • Jobsite assignment: Examine your project for areas where these losses can occur: • Safety • Environmental areas • Personnel management • Criminal activity An AGC Construction Learning Tool
Using on the Job What You Learned Today • To get ready for Session 9: • Read Session 9, Cost Control Strategies • Be sure you understand these concepts: • Identifying trends for cost overruns • Strategies for optimizing project profitability • The use of changes for appropriate cost increases • Backcharging subcontractors for appropriate affected costs An AGC Construction Learning Tool