1 / 70

HCAL RBX for HB, HE, and HO Status and Planning

HCAL RBX for HB, HE, and HO Status and Planning. R. Ruchti Department of Physics University of Notre Dame Notre Dame, IN 46556 USA. RBX Working Group. Notre Dame

elsa
Télécharger la présentation

HCAL RBX for HB, HE, and HO Status and Planning

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. HCAL RBX for HB, HE, and HO Status and Planning R. Ruchti Department of Physics University of Notre Dame Notre Dame, IN 46556 USA

  2. RBX Working Group • Notre Dame • B. Baumbaugh, B. Beiersdorf, L. Castle, T. Loughran, D. Karmgard, J. Marchant, M. McKenna, R. Ruchti, D. Wiand • Fermilab • A. Baumbaugh, J. Elias, J. Freeman, R. Foltz, S. Los, C. Rivetta, A. Ronzhin, T. Shaw, J. Whitmore • Florida State • V. Hagopian, K. Johnson • UI Chicago • D. Dwyer, M. Adams • Iowa • Y. Onel • Minnesota • A. Heering • Mississippi • M. Booke, M. Reep, J. Reidy PRR for HCAL RBX 1-March 2001 R.Ruchti

  3. HCAL Subsystem Locations PRR for HCAL RBX 1-March 2001 R.Ruchti

  4. Overview of RBX Placement PRR for HCAL RBX 1-March 2001 R.Ruchti

  5. RBX contents for all subsystems • All components reside in an enclosure/shell which acts as mechanical enclosure and distribution point for services. • All components are modular – and can be inserted and removed as units. • RM-19 (HB, HE, and HO subsystems) • RM-73 (HB and HE only) • Calibration Module • CCM (Clock and Control Module) • HV/BV termination • LV termination • Water cooling • Gas manifold for nitrogen inerting of ODU/RM PRR for HCAL RBX 1-March 2001 R.Ruchti

  6. Assembly of HB- in Spain PRR for HCAL RBX 1-March 2001 R.Ruchti

  7. HB- Wedge being loaded on cradle PRR for HCAL RBX 1-March 2001 R.Ruchti

  8. HB RBX mounting on Wedge PRR for HCAL RBX 1-March 2001 R.Ruchti

  9. HB RBX (rf,z) viewand (rf,r) view PRR for HCAL RBX 1-March 2001 R.Ruchti

  10. HB RBX Front Face PRR for HCAL RBX 1-March 2001 R.Ruchti

  11. Topics • Overview of RBX Design and Placement • HB RBX • HE RBX • HO RBX • Services and Access • Planning and Schedule PRR for HCAL RBX 1-March 2001 R.Ruchti

  12. Cooling Routing on RBX enclosure outer surface PRR for HCAL RBX 1-March 2001 R.Ruchti

  13. HB RBX Issues • Design: compact and limited space • Status: advanced, ready for production • Integration: careful interaction with Tracker and ECAL services and panels required. • Challenge: accessibility of modules, particularly the RM-73. • Schedule: Testing of Megatiles in Building 186, May 2001. Mounting of RBX onHB- wedges Summer 2001 in building 186. PRR for HCAL RBX 1-March 2001 R.Ruchti

  14. HB RBX Assembly Full RBX with 19 ch RMs RBX Interior -- HV distributor and backplane PRR for HCAL RBX 1-March 2001 R.Ruchti

  15. HB RBX Module Routing Channels PRR for HCAL RBX 1-March 2001 R.Ruchti

  16. RM-19 QIE Top View PRR for HCAL RBX 1-March 2001 R.Ruchti

  17. RM-19 QIE Front Face PRR for HCAL RBX 1-March 2001 R.Ruchti

  18. Readout Module for 19-channel HPD RM19 PRR for HCAL RBX 1-March 2001 R.Ruchti

  19. RM19 Sidewall removed PRR for HCAL RBX 1-March 2001 R.Ruchti

  20. HB RBX Electrical PRR for HCAL RBX 1-March 2001 R.Ruchti

  21. RM19 Rear and Front Views PRR for HCAL RBX 1-March 2001 R.Ruchti

  22. ODU showing patch panel, cookie support plate, HPD, ZIF socket and interface card PRR for HCAL RBX 1-March 2001 R.Ruchti

  23. Module Extractor (CHUNC) PRR for HCAL RBX 1-March 2001 R.Ruchti

  24. RM-73 PRR for HCAL RBX 1-March 2001 R.Ruchti

  25. RM-73 Front Face PRR for HCAL RBX 1-March 2001 R.Ruchti

  26. RM-73 Rear View PRR for HCAL RBX 1-March 2001 R.Ruchti

  27. HB Mapping ExampleQIE Cards to Megatiles PRR for HCAL RBX 1-March 2001 R.Ruchti

  28. RBX Services • Water for cooling in/out • Nitrogen gas for ODU/RM inerting in only • HV/BV + termination • LV • Optical signals QIE out • CCM and slow controls • Laser calibration signals PRR for HCAL RBX 1-March 2001 R.Ruchti

  29. HV/BV Cable Termination PRR for HCAL RBX 1-March 2001 R.Ruchti

  30. HV/BV Distributor PRR for HCAL RBX 1-March 2001 R.Ruchti

  31. Calibration Module PRR for HCAL RBX 1-March 2001 R.Ruchti

  32. General Comment about RBX and Components • The structures are modular. This allows us to gain in the schedule, as assembly, Q/C and testing can be “factorized”. • RBX enclosures can be built, tested and mounted, independent of components which can be added later. • RM can be fabricated mechanically. ODU can be fabricated. Electronics and HPDs can be incorporated when available. PRR for HCAL RBX 1-March 2001 R.Ruchti

  33. Additionals • Copper fittings and jumper between roof and floor water cooling pipes • Gas manifold • LV module • CCM • CHUNC • RM pinning • Front protection cover Status of Costing Status of Costing panels • RM-19 (QIE) and RM-73 • Retrofit of holes in RBX flooring for mounts PRR for HCAL RBX 1-March 2001 R.Ruchti

  34. HB RBX Production Status • HB PPP-1 • At CERN in mockup at Prevessin Site. • HB PPP-2 • At Fermilab for electrical integration and 186 testing • HB PPP-3 • At Notre Dame for thermal tests and 186 testing • HB PPP-4 • Under fabrication at an outside vendor and assembled at Mississippi. Production drawing test bed. • HB RBX production begins April 2001 PRR for HCAL RBX 1-March 2001 R.Ruchti

  35. HB access/serviceability issues • RM-19 • Removal of optical cable protective covers • Removal of optical cables, calibration cables • Removal of any blocking services/cables • Direct extraction using CHUNC • RM-73, CCM and Calibration Modules • Similar to above, except RM-19s must be removed first. • Removal of any blocking services/cables. • Extraction using CHUNC PRR for HCAL RBX 1-March 2001 R.Ruchti

  36. HB access/serviceability issues • HV/VB termination and LV termination • Removal of RM-19 • Extraction using CHUNC • Service in situ • HV/VB backplane, electrical backplane • Removal of all RM, CCM and Calib Module • Removal of HV/BV and LV terminations • Full extraction PRR for HCAL RBX 1-March 2001 R.Ruchti

  37. Service Paths + Panels PRR for HCAL RBX 1-March 2001 R.Ruchti

  38. Servicing View PRR for HCAL RBX 1-March 2001 R.Ruchti

  39. HB Mockup in Lab 5 at Fermilab 19.4 19.3 CCM Cal 73 19.2 19.1 19.4 19.4 PRR for HCAL RBX 1-March 2001 R.Ruchti

  40. Mockup at Fermilab PRR for HCAL RBX 1-March 2001 R.Ruchti

  41. PRR for HCAL RBX 1-March 2001 R.Ruchti

  42. HB RBXExtracting ODU 19.2 PRR for HCAL RBX 1-March 2001 R.Ruchti

  43. View of Mockup: edge of wedge PRR for HCAL RBX 1-March 2001 R.Ruchti

  44. View behind ECAL cooling conduits PRR for HCAL RBX 1-March 2001 R.Ruchti

  45. HB RBX environs(lateral shift of TK patch panel) PRR for HCAL RBX 1-March 2001 R.Ruchti

  46. HB RBXExtracting ODU 19.4 PRR for HCAL RBX 1-March 2001 R.Ruchti

  47. HB RBXExtracting ODU 19.2 PRR for HCAL RBX 1-March 2001 R.Ruchti

  48. HB RBX with TK patch panelno clearance for ODU-73 PRR for HCAL RBX 1-March 2001 R.Ruchti

  49. HB RBXExtracting ODU 19.1 PRR for HCAL RBX 1-March 2001 R.Ruchti

  50. HB RBXODU 73 clearance issues PRR for HCAL RBX 1-March 2001 R.Ruchti

More Related