An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TDC2 consolidation IVM Team

  2. TDC2: VSC objectives • Corrosion problems. • Replacement of corroded chambers. Sectors 2006, 2007 and 2020

  3. TDC2: VSC objectives • Corrosion problems. • Replacement of corroded chambers. Sectors 2006, 2007 and 2020

  4. TDC2: VSC objectives Chamber production: March 2013 Other equipment affected

  5. TDC2: VSC objectives • Vacuum equipment renovation • Replacement of old vacuum equipment with new or refurbished material • 7 gauges • 4 valves • 32 ion pumps • Installation of feedthrough heaters (avoid feedthrough corrosion) • Cost: • Chambers: 25kCHF • Valves: 135kCHF • Gauges: 18 kCHF

  6. TDC2: VSC obejctives • Vacuum support: • Splitters • Collimator • BA1 consolidation -> collective dose • Waste produced: chambers(valves and ion pump) • TBIU/D maintenance (?)

  7. TDC2: Robot intervention • Preparation of robot intervention (?) • Reduction of accumulated dose • Time consuming • Preparation • Possible activities • Removal • Leak detection • Impact on planning

  8. TDC2 consolidation S. Evrard IEFC, October19th, 2012 - EDMS 1246683