The project focuses on addressing corrosion issues by replacing corroded chambers with new materials. It involves the renovation of vacuum equipment, installation of new gauges, valves, ion pumps. Budget allocation and waste management are key parts of the project.
E N D
TDC2 consolidation IVM Team
TDC2: VSC objectives • Corrosion problems. • Replacement of corroded chambers. Sectors 2006, 2007 and 2020
TDC2: VSC objectives • Corrosion problems. • Replacement of corroded chambers. Sectors 2006, 2007 and 2020
TDC2: VSC objectives Chamber production: March 2013 Other equipment affected
TDC2: VSC objectives • Vacuum equipment renovation • Replacement of old vacuum equipment with new or refurbished material • 7 gauges • 4 valves • 32 ion pumps • Installation of feedthrough heaters (avoid feedthrough corrosion) • Cost: • Chambers: 25kCHF • Valves: 135kCHF • Gauges: 18 kCHF
TDC2: VSC obejctives • Vacuum support: • Splitters • Collimator • BA1 consolidation -> collective dose • Waste produced: chambers(valves and ion pump) • TBIU/D maintenance (?)
TDC2: Robot intervention • Preparation of robot intervention (?) • Reduction of accumulated dose • Time consuming • Preparation • Possible activities • Removal • Leak detection • Impact on planning
TDC2 consolidation S. Evrard IEFC, October19th, 2012 - EDMS 1246683