220 likes | 401 Vues
A+. HILL COUNTRY FAMILY FITNESS CENTER PROPOSAL. A-001. ENGINEERING DESIGN. SITE LOCATION. U.S.281. Comal County. POND. RODEO DRIVE. A+. SPEAKER : AMANDA WATSON. A-002. ENGINEERING DESIGN. PROPOSED LAYOUT. PROPERTY LINES. RUNNING TRACK. PARKING. 34,000 SQ. FT. BUILDING. A+.
E N D
A+ HILL COUNTRY FAMILY FITNESS CENTER PROPOSAL A-001 ENGINEERING DESIGN
SITE LOCATION U.S.281 Comal County POND RODEO DRIVE A+ SPEAKER : AMANDA WATSON A-002 ENGINEERING DESIGN
PROPOSED LAYOUT PROPERTY LINES RUNNING TRACK PARKING 34,000 SQ. FT. BUILDING A+ SPEAKER : AMANDA WATSON A-003 ENGINEERING DESIGN
TASK 1 Amendment to Plat U.S.281 LOT 1 : 2.500 ACRES LOT 2 : 5.018 ACRES LOT 1 LOT 2 RODEO DRIVE A+ SPEAKER : AMANDA WATSON A-004 ENGINEERING DESIGN
TASK 2 Grading and Site Preparation • Topography Evaluation • Earthwork Volume sheet yielding • proper amounts of cut and fill to be performed • final elevation plans of finished grade • Design to be in accordance with County Building Codes and Texas Storm Water Pollution Prevention Plan (TPDES). • This task to be done in conjunction with and consideration of the drainage and environmental design task. - A+ SPEAKER : JOSH HERRINGTON A-005 ENGINEERING DESIGN
Parking Lot Design • All Design will be done in accordance with: • Permeability and runoff/ drainage concerns • State and Local building restrictions • ADA compliance and the State of Texas Architectural Barriers Act, Texas Accessibility Standards (TAS) • Fire Marshal’s restrictions A+ SPEAKER : JOSH HERRINGTON A-006 ENGINEERING DESIGN
Parking Lot Design • Design will include: • Type of paving method/materials to use • Maximum # of parking spaces combined with maximum traffic maneuverability • Proper site lighting • Appropriate signage and ground paint A+ SPEAKER : JOSH HERRINGTON A-007 ENGINEERING DESIGN
TASK 3 Transportation Analysis & Design Background Analysis Impact Analysis A+ SPEAKER : ARMANDO GOMEZ-FARIAS A-008 ENGINEERING DESIGN
Transportation Analysis & Design • Recommendations and Design • Drive Way (1 Lane Inbound / 1 Lane Outbound) • Access point from Rodeo Drive to Site • Acceleration / Deceleration Lanes • TxDOT Access Management • Modification to existing roadway • Sight Distance / Sight Triangle AASHTO • Traffic Signs • Permits HWY 281 RODEO DR. Access Point A+ SPEAKER : ARMANDO GOMEZ-FARIAS A-009 ENGINEERING DESIGN
DRAINAGE & ENVIRONMENTAL ANALYSIS TASK 4 SITE • CONTRIBUTING ZONE PLAN A+ EDWARDS AQUIFER VIEWER MAP SITE LOCATED WITHIN THE EDWARDS AQUIFER CONTRIBUTING ZONE CZP SUBMITTED TO TCEQ SPEAKER : AMANDA WATSON A-010 ENGINEERING DESIGN
DRAINAGE & ENVIRONMENTAL ANALYSIS • CONTRIBUTING ZONE PLAN • STORMWATER POLLUTION PREVENTION PLAN A+ FEMA FLOOD INSURANE MAP VIEWER SITE NOT WITHIN 100-YEAR FLOOD BOUNDARIES TEXAS POLLUTION DISCHARGE ELIMINATION SYSTEM SPEAKER : AMANDA WATSON A-011 ENGINEERING DESIGN
TASK 5 Utility Design & Coordination • ON-SITE SEWAGE FACILITY • WATER • ELECTRICITY A+ SPEAKER : AMANDA WATSON A-012 ENGINEERING DESIGN TCEQ CHAPTER 285 & COMAL COUNTY DESIGN REGULATIONS
Utility Design & Coordination POWER CONNECTION POWER LINE PROPOSED PARKING LOT IRRIGATION WATER MAIN POOL DOMESTIC FIRE LINE A+ WATER UTILITY Design water main extensions Hydrant connections Fire Service connections Irrigation and Domestic services POWER UTILITY UNDERGROUND SERVICE – Trench, backfill, concrete work Cooperative : Cost Estimate SPEAKER : KAREM ALFARO A-013 ENGINEERING DESIGN
TASK 6 Structural & Geotechnical • Design all structural components of the building. • According to the Architect’s Specifications • Design by Following Codes: • International Building Code (IBC) 2012 • American Society of Civil Engineers (ASCE) 7-10 • American Institute of Steel Construction Manual (AISC) 2012 • American Concrete Institute (ACI) 318-11 • Pre-Design Analysis • Determination of all Applicable Loads • Structural Analysis (SAP 2000) A+ SPEAKER : LIVIER CORONA A-014 ENGINEERING DESIGN
Structural & Geotechnical • Structural Design • Materials: Steel, Concrete or Both • Geotechnical Engineering Report • Subcontracted to a geotechnical firm • Results reviewed by our company • Foundation & Slab Design • Geotechnical Report and Analysis • Pre-Design Analysis • Concrete Foundation COMAL COUNTY SITE A+ SPEAKER : LIVIER CORONA A-015 ENGINEERING DESIGN
TASK 7 Green Design Structural and Architectural Features DUAL PIPING SYSTEM Steel Joists are 96% recycled; lowering energy use LED lights with motion detectors Energy efficient windows (triple pane fill with neon gas) Awnings, location of windows; taking advantages of light Supply Potable Water for human consumption Reclaimed water for toilettes flushing and water irrigation Lavender (light purple) Pipes A+ SPEAKER : ANGELA DE GREEF A-016 ENGINEERING DESIGN
Green Design PERVIOUS CONCRETE XERISCAPING Reduce or Eliminate the Need for Supplemental Water from Irrigation High porosity Reduced Runoff Parking areas, Areas with Light Traffic Protect Water Quality A+ SPEAKER : ANGELA DE GREEF A-017 ENGINEERING DESIGN
Green Design SOLAR PANELS Solar Pool Heaters to reduce Swimming Pool Heating Costs Self-sustaining gymnasium, combination of human power and solar energy Electric vehicle charger station A+ SPEAKER : ANGELA DE GREEF A-018 ENGINEERING DESIGN
Schedule of Services Meeting 1 Sept.09 Meeting 2 Sept.25 Meeting 3 Oct.17 START Sept.02 FINISH Nov.25 A+ SPEAKER : JOSH HERRINGTON A-019 ENGINEERING DESIGN
Cost of Services ADMINISTRATIVE TASKS $ 24,987 SITE GRADING AND PARKING LOT DESIGN $ 45,270 TRANSPORTATION ANALYSIS AND DESIGN $ 30,450 DRAINAGE AND ENVIRONMENTAL ANALYSIS $ 13,412 UTILITY DESIGN AND COORDINATION $ 42,250 STRUCTURAL ANALYSIS AND DESIGN $ 46,250 GREEN DESIGN $ 30,675 TOTAL COSTS $233,294 A+ SPEAKER : JOSH HERRINGTON A-020 ENGINEERING DESIGN
Conclusion • Total Cost : $233,294 • Design : Sept 02,2013 – November 25, 2013 • Require Signature as approval to proceed Thank you very much for your time and attention Questions? A+ SPEAKER : JOSH HERRINGTON A-021 ENGINEERING DESIGN