1 / 12

Report From Berkeley

Report From Berkeley. March 9, 2012 Carl Haber. Outline. Progress on shield-less stavelet Measurements of co-cured thermo-mech stave LOI backup document New HSIO boards Plans for SLAC AUW. Shield-less Stavelet. Idea is to co-cure cable with no Al shield inside a 0-90-0 facing

ermin
Télécharger la présentation

Report From Berkeley

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Report From Berkeley March 9, 2012 Carl Haber

  2. Outline • Progress on shield-less stavelet • Measurements of co-cured thermo-mech stave • LOI backup document • New HSIO boards • Plans for SLAC AUW

  3. Shield-less Stavelet • Idea is to co-cure cable with no Al shield inside a 0-90-0 facing • Assemble core from these facings at BNL/Yale • One side will be serial powered • One side will be DC-DC • Electrical issue from Oxford meeting: no Al to use as a local ground reference between hybrids within a module

  4. Added large copper ground references on one side. Will these suffice? • Added pads for discrete inductors on serial links • Issue also of inductive current return • 3 week fabrication cycle expected

  5. DC-DC side shield • Unlike 1st DC-DC stave, this will use a BNL/Yale core and therefore the converter support must mate with the cylindrical closeout power Al block

  6. Assembly and Components • 3 modules built and in test (Sergio) • New assembly tools are in design, to place modules on this stavelet - these will be conceptually simple “static” fixtures for “good enough” positioning. • Cable to be fabricated • Co-cure at LBNL as before

  7. Results on Co-Cure TM Stave • Two co-cured 0-90-0 facings, laminated at BNL/Yale • Length changes between co-cure and lamination – minimal • Thickness – see slide • Flatness – measured on CMM, results are inconsistent and need to be repeated, stave is now in BNL and will next be measured there • We see bowing of 0.3-0.5 mm but the data don’t make sense front to back

  8. Stave Thickness Mainly parallel with a bulge seen at the far right end Maximum variance is 0.1900 to 0.1955 inches (~125 microns) Should have measured the co-cured facings first

  9. Difference in length, microns per 98 mm segment, before/after lamination

  10. R&D Backup Document • Stave Core Fabrication: Tim Jones and David Lynn • Petal Core Fabrication: Carlos Lacasta • Mechanical Bus Co-Cure: Georg Viehhauser and Carl Haber • Supermodule Mechanics: Frank Cadoux DECLINED • P-type Sensor Development: NobuUnno, HartmutSadrozinski • Cooling Studies: Georg Viehhauser • Development of the ABC-next 130 nm Chip: Francis Anghinolfi • Development of the Hybrid Controller Chip: Mitch Newcomer DONE • Development of the SPP Serial Powering Chip: Mitch Newcomer • Development of the DC-DC Conversion ASIC and PCB Package: Georges Blanchot • Hybrid: Ashley Greenall • Module: Tony Affolder • Stavelet Test Program: Peter Phillips • Petal Electrical Program: Ingrid Gregor • Supermodule Electrical Test Program: Didier Ferrere DECLINED • Digital Data Transmission on the Stave and the BCC Chip: Carl Haber DONE • Power Protection and Serial Powering: David Lynn and Mitch Newcomer DONE • Cabling and Services Survey and Analysis: Sergio Diez Cornell • Hybrid Assembly Process: Ashley Greenall • Module Assembly Process: Tony Affolder • Stave Mounting Process: Martin Gibson DONE • Low Mass Tape Development: Tony Weidberg DONE • HSIO Data Acquisition System: David Nelson and Carl Haber • Alignment R&D: Richard Nickerson • Level-1 Track Trigger R&D ROI based: NEED Author • Level-1 Track Trigger R&D Self Seeded: Maurice Garcia-Sciveres

  11. New HSIO • A number of new HSIO and interface boards are under test at SLAC and LBNL • Thanks to Dave Nelson and Sergio Diez-Cornell • Need an accounting of who and where these go please.

  12. SLAC AUW: 3.5 h on Tue 27-Mar PM • Red would be suggested for combined electrical/mechanical “stave” session, black for modules, but still need to hear from other groups (mechanical, petals,…) • Time for ~10, 20min talks • List from Tony • 250 nm stave module + program plans for staves, new DC-DC converter • 130 nm hybrid/module plans • Irradiation at b’ham-10 min • B180 infrastructure • B180 DC-DC stavelet status • SP stavelet update • 250 nm petalet • 130 nm EOS • 130 nm bus cables • Report back from ASIC CDR w/open questions • Plans for powering 130 nm • Within module • SPP and DC-DC converters • 130 nm bonding trials • LOI backup document status in both sessions • List from Didier • KEK module production status (Nobu) • Super-module with multi-module readout - Status and plan (Yosuke or Allan) • Proposal for future design with ABCN130 - focus on service bus and hybrid (Allan)

More Related