1 / 11

FGCS Meeting Denver, Colorado June 13, 2007

FGCS Meeting Denver, Colorado June 13, 2007. Dave Zilkoski, Chair. Agenda: 9:00- 9:15 Welcome and Introductions 9:15-10:00 Accomplishments in FY07 10:00-10:15 Break 10:15-12:00 Discussion of Workgroup Charters and Action Plans 12:00- 1:00 Lunch

etenia
Télécharger la présentation

FGCS Meeting Denver, Colorado June 13, 2007

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. FGCS MeetingDenver, ColoradoJune 13, 2007 Dave Zilkoski, Chair

  2. Agenda: 9:00- 9:15 Welcome and Introductions 9:15-10:00 Accomplishments in FY07 10:00-10:15 Break 10:15-12:00 Discussion of Workgroup Charters and Action Plans 12:00- 1:00 Lunch 1:00- 2:00 Specific Topics of Interest 2:00- 2:15 Break 2:15- 4:15 Draft Subcommittee Action Plan for FY08 and Beyond 4:15- 4:30 Wrap-up

  3. Accomplishments in FY07: • Submitted FGCS FY07 Workplan to FGDC • Convened FGCS is Silver Spring Feb 07 • Reestablished Four Workgroups • Prepared Draft Workgroup Charters and Action Plans • Presented FGCS Report at February FGDC Meeting • Developed Training Materials for USACE to utilize a common daturm (NAVD88) on all 12,000 miles of levees

  4. Discussion of Work Group Charters and Action Plans Instruments: Scope of Work • Seek out sponsors for instrumentation loans • Develop Instrumentation testing procedures • Evaluate Instrumentation using standardized testing procedures • Deliver findings in the form of a report to the FGCS for review • Work with the Methodologies work group in development of guidelines.

  5. Discussion of Work Group Charters and Action Plans (cont.) Fixed Reference Stations: Activities • Federal, state, and local governmental agencies will be monitored to determine current and planned fixed GNSS station activities. • Procedures will be developed to assure all fixed sites operated by member agencies are tied to NSRS and provide NSRS positions. • Standards and specifications will be developed for fixed sites. • Common formats for data storage, distribution, and archiving will be developed and implemented through the National Geospatial Data Clearinghouse. • Studies will be undertaken to determine how to optimize a single CORS system including the National Differential Global Positioning Service (NDGPS) to meet a maximum number of Federal GNSS post-processing and real-time requirements.

  6. Discussion of Work Group Charters and Action Plans (cont.) Vertical Reference System: Activities • Collect information from users about their vertical reference system needs. • Consider and document the impact on users from changes in the vertical reference system. • Review existing vertical reference systems, including datum definition, data types, and estimates of precision and accuracy. • Develop improvements to strategies to incorporate modern technology information such as GPS into vertical reference systems. • Recommend the appropriate course of action for NGS and other Federal agencies to take with regard to vertical reference frames. • Document and report the findings of the Work Group to the Chairperson and Secretariat, FGCS, for distribution.

  7. Discussion of Work Group Charters and Action Plans (cont.) Methodology: Guidelines or "Best Practices Will be Drafted For • USCOE for Positioning Levees and Dams • Real-Time GPS Networks and Kinematic GPS • GPS Orthometric Heights (Draft released October 2005) • Connection Between Tidal and Geodetic Datums in Support of Coastal Communities

  8. Discussion of Work Group Charters and Action Plans (cont.) Spectrum: Should Workgroup continue? • Propose Larry Hothem as Chair • GNSS Spectrums • Other Spectrum issues

  9. Discussion of Topics of Interest • NDGPS • Requirements of FGCS Member Agencies • Kinematic GPS • Real-time Networks • Guidelines/Standards • GPS-Derived Orthometric Heights • Guidelines/Standards

  10. Draft Action Plan for FY08 • To Be Developed at this Meeting

  11. Wrap-up • Date and Location of Next Meeting • Summary of Action Items, With Due Date

More Related