An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Golden Mile Transport Meeting22 April 2010

  2. The next evolutionary step for greentomato The greentomato group provides a variety of goods and services with the aim of assisting its clients to reduce their carbon footprints without a dramatic change in lifestyle

  3. The energy problem • The UK has an uncertain energy future given • the slowing production of oil and gas in the UK which leads to increasing reliance on overseas sources • low carbon emission targets which need to be met by 2050 • the level of capital required - we are required to double our rate of electricity asset investments to replace systems which are nearing the end of their lifetime % Based on CBI estimates

  4. Small-scale electricity generation • FIT returns • Utility savings • Predictability of utility costs • CRC points • Marketing benefits

  5. The FIT or ‘Clean Energy Cashback Scheme’ A similar system for the generation of heat, the renewable heat incentive, is set to come into force in April 2011 • Launched on 1 April 2010 • Payments for generating electricity from eligible small scale low carbon energy sources • solar photovoltaic • wind • hydro • anaerobic digestion • micro -CHP • Payable to individuals, households, communities and businesses • Two levels of tariff • generation tariff , payable per kWh generated, regardless of whether it is used or sold • export tariff, guaranteed minimum price payable per kWh that is not used and is sold back to the electricity grid • Tariff is index linked • Tax free for domestic only • Attaches to a system for a guaranteed period of time depending on the technology

  6. Case study Large commercial building in North London Pitched roof South-West facing No significant installation issues Available space of 350m 1 2 Size of installation 39.5 kWp Annual output 30,233 kWh Installation cost £135,000 FIT 31.4p/kWh CO saving 17,173kg Size of array 288m 2 Returns for the first 10 years 2 3 2 Year 1 Based on SAP 45 deg from South, 0.8 performance factor 2 Assuming that the installation is carried out by March 2012 3 Based on 0.568kg co2 per kWh

  7. Kaohsiung stadium in Taiwan Largest solar powered stadium in the world 50,000 capacity stadium Array is made up of 8,844 solar panels and is 4,552m Generates 1.14 million kWh per annum preventing the release of 660t of CO per year When the stadium is not being used, it provides 80% of the power for the local area 2 2

  8. Transport Electrification of the transport network Solar powered car parks Opportunities for completely zero emission fleets

  9. Executing a potential project Analyse space greentomatoenergy is unique in that it offers a full suite of services across all technologies so that we are able to offer a solution that is most suited to your business Design Finance Install Maintain

  10. Disclaimer The purpose of this document is to provide information solely to the addressee. By accepting this document the recipient agrees to keep confidential at all times information contained in it or made available in connection with this or any further investigation. This document is for the exclusive use of the persons to whom it is addressed and their advisers and shall not be copied, reproduced or distributed (in whole or in part) or disclosed by recipients to any other person nor should any other person act on it. The information in this document has not been independently verified by Green Tomato Energy Limited (“greentomatoenergy”). Except in the case of fraudulent misrepresentation, no responsibility or liability is accepted by greentomatoenergy or by any of its officers, employees or agents as to or in relation to the accuracy or sufficiency of this document or any other written or oral information made available to any interested party or its advisers and any such liability is expressly disclaimed. By accepting this document the recipient agrees to be bound by the foregoing limitations. GREEN TOMATO ENERGY LIMITEDSERENDIB HOUSE67A BOSTON MANOR ROADMIDDEXTW8 9JQ