1 / 4

Conclusions and Recommendations from Session 2

Conclusions and Recommendations from Session 2. “ Accelerator Hardware and Controls” Conveners: S. Deghaye, Th. Zickler. Conclusions and Recommendations from Session 2. Status and prospects of PS magnet consolidation program ( D. Tommasini)

ewan
Télécharger la présentation

Conclusions and Recommendations from Session 2

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Conclusions and Recommendations from Session 2 “Accelerator Hardware and Controls”Conveners: S. Deghaye, Th. Zickler

  2. Conclusions and Recommendations from Session 2 • Status and prospects of PS magnet consolidation program (D. Tommasini) • Phase 1 of the PS main magnet consolidation program completed • launch the manufacture of 50 new sets of PFW (~ 3 MCHF, 2 years) • Investigate the spare situation for bus bars and the impact in case of failure (water leak)? • Machine study should be continued to find out how many PFW can fail before the PS has to be stopped • spare situation for Booster TL, Linac 3, Ion Beam TL, LEIR needs to be improved • In view of the presented workload a priority list with schedule should be prepared • Extend the investigation on spare situation to all machines and experimental areas • Status and prospects of SPS magnet consolidation program (J. Bauche) • 255 Installed MBB magnets and all spares refurbished • Refurbishment of all spare SPS main magnets • Prepare at least one fully operational spare magnet of each magnet type • prepare consolidation of pole shims, coil retainers, and quadrupole manifolds • Prepare replacement campaign of the rubber water hoses in the whole SPS complex • A mitigation strategy for corrosion problem on Splitter in North area should be urgently studied ATOP days 2009 - Summary Session 2 (Th. Zickler)

  3. Conclusions and Recommendations from Session 2 (cont’) • Beam instrumentation throughout the accelerator complex (J. J. Gras) • Good progress - Many instrumentation related issues already solved • dedicated beam time needed to commission all new items • Review of test Procedure needed to assure proper functioning for PS Booster BLMs • PS Booster Fast wire scanners: Follow up remaining OP requirements • Review mechanical design of ISOLDE needle scanners needed • New PS Orbit System: Remaining CODD issues (triggering) to be checked • 6 turn transformer renovation (PS): OP needs provide dedicated OP GUI • PUs in TT2 to be made available for PS (timing) • SPS BSW 517 hardware problem to be investigated. • Ring BPMs offset problem: full renovation or additional attenuators needed • An Early involvement of OP and CO in the design phase would be desirable (e.g: watchdog, wire scanner electronics) ATOP days 2009 - Summary Session 2 (Th. Zickler)

  4. Conclusions and Recommendations from Session 2 (cont’) • Accelerator Controls Renovation Project (M. Vanden Eynden) • ACCOR Organization almost in place • Budget aspects to be finalized • The new PS MPS Regulation System (Q. King) • The new system is showing promising results • Few minor outstanding issues to be solved ATOP days 2009 - Summary Session 2 (Th. Zickler)

More Related