1 / 6

AMS-02 Rebaselining Outbrief UF-4.1 Flight and Manifest

AMS-02 Rebaselining Outbrief UF-4.1 Flight and Manifest. Payload Mission Integration & Planning/OZ2 7/15/04. Robert Miley/OZ2 281-226-4968. Purpose & Manifest Source. The purpose of this presentation is: Provide ISS Program overview of UF-4.1 flight and cargo manifest Manifest source:

eytan
Télécharger la présentation

AMS-02 Rebaselining Outbrief UF-4.1 Flight and Manifest

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. AMS-02 Rebaselining OutbriefUF-4.1 Flight and Manifest Payload Mission Integration & Planning/OZ2 7/15/04 Robert Miley/OZ2 281-226-4968

  2. Purpose & Manifest Source • The purpose of this presentation is: • Provide ISS Program overview of UF-4.1 flight and cargo manifest Manifest source: • POP 2004 Assembly Sequence • UF-4.1 cargo manifest is a totally unpressurized flight – launch 1/08 • Final ascent performance hits from return to flight requirements – TBD  AMS-02 up mass not affected • Primary payloads • AMS-02 • TBD - Cross Bay Carrier (Express Pallet-1 or ORUs) • Secondary payloads • ISS Sidewall Carriers (Port and Starboard)

  3. CAWG Flight Assessment Space Shuttle Consolidated Analysis Working Group (CAWG): • Shuttle CAWG AMS-02 assessment completed - no further planned work at this time • AMS-02 Orbiter payload bay loads capability assessment reported out Apr 2003 • Compatibility assessment for AMS-02 loads and ROEUs completed at keel trunnion locations - X0 1167.33 and X0 1175.20 • AMS-02 CDR baseline payload bay keel trunnion X0 1175.20 • AMS-02 longeron trunnion locations at X0 1163.40 and X0 1242.07 • Lockheed Martin re-assessed AMS-02 compatibility with Orbiter in May 2004 • Shuttle dynamic close clearance assessment – VLA template L-9 months • No known loads issues with AMS-02 keel located at X0 1175.20

  4. CAWG Flight Assessment • CAWG UF-4.1 Cargo Flight Assessment – 3/18/04

  5. PICB Agreements Program Integration Control Board (PICB): • Provided ISS Program awareness of the minimum clearance between AMS-02 and the static berthed payload envelope for the adjacent upper outboard S3 PAS site while berthing or removing AMS-02 from its S3 site • Clearance of 1.5-inches while berthing AMS-02 to static berthed payload envelope excessively small with worst case misalignments assessment • Requested PICB concurrence to constraint for the S3 upper outboard PAS location to remain vacant while AMS-02 occupies the S3 upper inboard PAS site • PICB accepted constraint to keep S3 zenith outboard PAS site empty during AMS-02 3-year on-orbit mission life • Proceed with a waiver for AMS-02, which is outside the static payload envelope, based on the Jun 2003 assessment • Original PICB Jun 2003 agreement based on an ISS assembly sequence and payload traffic model which have changed • Remaining compressed flight schedule and payload traffic model may require re-evaluation of the existing PICB agreements

  6. ISS Program Work • Clearance issue – MAGIK AI #1705 • Clearance of 1.5-inches while berthing AMS-02 to static berthed payload envelope excessively small with worst case misalignments assessment

More Related