fabian
Uploaded by
49 SLIDES
843 VUES
520LIKES

Vegetation Classification & Mapping

DESCRIPTION

Vegetation Classification & Mapping. Jeanne Taylor, MOJN Vegetation Mapping Coordinator. Rationale. Vegetation maps are one of the12-baseline inventories Classification - To inventory and describe the plant communities within network parks

1 / 49

Télécharger la présentation

Vegetation Classification & Mapping

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript

Playing audio...

  1. Vegetation Classification & Mapping Jeanne Taylor, MOJN Vegetation Mapping Coordinator

  2. Rationale • Vegetation maps are one of the12-baseline inventories • Classification - To inventory and describe the plant communities within network parks • Mapping – To accurately document these plant communities in a GIS layer

  3. Veg. Classification & Mapping Major Phases • Project Planning • Classification • Preliminary classification created from legacy data • Field data collection • Final Vegetation Classification • Mapping • Imagery acquisition and mapping • Map Accuracy Assessment • Final Reports and Deliverables

  4. Project Timeline

  5. Project Status - JOTR • Phase = Final Reports and Deliverables • Final project report and products scheduled for completion by December 2010.

  6. Project Status - PARA • Phase = Classification and Mapping • Classification: • Mojave Desert portion complete • Shivwits Plateau portion in-progress • Mapping: • June 2011 – June 2012

  7. Project Status - MANZ • Phase – Final Deliverables • Final draft of project report and products scheduled for completion by November 2010. • Submit completed products to NVIP Feb 2011.

  8. Project Status - GRBA • Phase - Mapping • Classification completed May 2010 • Mapping begun May 2010 • Map validation trip planned for October 2010

  9. GRBA - Classification Results • Complete dataset = 439 plots/obs • Classified to: 14 Macrogroups 30 Groups 57 Alliances ⇒ ⇒ ⇒ 42 Proposed Map Classes 126 Associations

  10. National Vegetation Classification 2008 Hierarchy • Upper: Physiognomy plays a predominant role • L1 – Formation Class • L2 – Formation Subclass • L3 – Formation • Middle: Both floristics and physiognomy play a significant role • L4 – Division • L5 – Macrogroup • L6 – Group • Lower: Floristics plays a predominant role L7 – Alliance ⇚ ⇚ ⇛ ⇛ Target mapping class level L8 - Association

  11. Results – Classified Veg Type to Map Class

  12. Project status – LAKE, MOJA, DEVA • Phase = Classification • Preliminary classification of legacy data completed Feb 2009 • Field data collection at LAKE and DEVA, Feb – July 2009 • Second year of field data collection begins Sep 29, 2010.

  13. LAKE – VMap Sampling Approach • Created Biophysical Units (BPUs) using • Soils layer • Climate grids (Temperature min Jan, max July, Precipitation, winter and summer) • Resulted in 50 unique BPUs • Randomly selected 100 BPUs to sample, two per unique BPU. -------------------------------------- • Additional samples collected through directed and opportunistic searches

  14. LAKE – VMap Biophysical Units, 2010 Plots/Obs. Locations

  15. LAKE – Vmap Sampling Approach • Fields crews provided with • A list of vegetation types likely to occur within LAKE. • A target number of plot and observation points per vegetation type. • Mininum number of classification plots per vegetation type: 5

  16. Classification field data collection

  17. Results LAKE, First field season • Classification plots = 157 • Observation points = 237 Total = 394 (Target No. : ~ 400) • No. of alliances with > 5 plot/obs: 19 • No. of alliances with 1-4 plot/obs: 45 • No. of plots marked permanently: 37

  18. LAKE Plot and Obs Point Locations, 2010

  19. LAKE – Crew at work LAKE_vmap_0104a_N_20100224.JPG

  20. Results – LAKE, First Field Season

  21. Results – LAKE, 2010 Field Season

  22. DEVA and MOJA

  23. DEVA and MOJA - Central Mojave Vegetation Map • Field data collection conducted in 1997-1998 • Vegetation Map and Technical Report completed in 2004 • Minimum mapping unit (MMU): 5 hectares • NVIP MMU: 0.5 hectares • Special features map is a starting place for future mapping at a finer resolution

  24. Objectives of field data collection at MOJA, DEVA • Fill in gaps in the current classification • Sample in areas where there is no existing data • Collect additional samples in rare, localized vegetation types (e.g. White Fir at MOJA)

  25. Target number of plot and obs. points at DEVA and MOJA • DEVA • Classification plots: 191 (Legacy data: 827) • Observation points: 420 • MOJA • Classification plots: 203 (Legacy data: 200) • Observation points: 430

  26. DEVA – Vmap Sampling Approach • Park divided into 17 work zones representing major landforms (ranges, dunes, valleys, playas) • 1st Field Season - stratified random sampling points by vegetation type within each work zone • 2nd Field season – to stratify sampling points by vegetation type and elevation within each work zone

  27. DEVA Vmap Work Zones

  28. Results DEVA, First field season • Classification plots = 38 • Observation points = 186 Total = 224 • No. of alliances with > 5 plot/obs: 24 • No. of alliances with 1-4 plot/obs: 32 • No. of plots marked permanently: none

  29. Results – DEVA, First Field Season

  30. Results, DEVA, First Field Season

  31. DEVA – Vmap Plot and Obs. Points, 2010

  32. DEVA-Crew at work DEVA_vmap_0149_SE_20100619.JPG

  33. MOJA - Vmap Sampling Approach • Park divided into 32 works zones representing major landforms (ranges, dunes, valleys, playas) • Sampling points to be stratified by vegetation type and elevation within each work zone.

  34. MOJA – Vmap Work Zones

  35. COMPLIANCE • LAKE, MOJA, DEVA - Park permits have been applied for and received for collecting plants for plant identification purposes.

  36. Data Management/Data Quality

  37. Data Management • Data delivery schedule • 1st season, data deliverables were due at the conclusion of the season • 2nd season, data deliverables due: • November 5 • January 7 • March 11th • June 10th • Thirty days from receipt by Project Lead to Data Manager

  38. QA/QC • Quality Assurance • Pre-season field crew training insuring instruction is clear, concepts are understood • Calibrate ocular estimation among all crew members pre-season and mid-season. • Project Lead periodically works with each field crew member to insure that data is being collected correctly

  39. QA/QC • Quality control • Data entry personnel are responsible for a 100% check of all records entered. • Project Lead works with Data Manager to develop database field controls (i.e. values out of range). • Project Lead responsible for at minimum a 10% check of all records entered.

  40. Future Personnel Needs • [Project Management – • Current Veg. Mapping Coordinator position ends Dec. 2011. • In 2011, MOJN will have to decide how project management will be handled beginning in 2012.] • Field personnel • Once maps are completed, field crews will be needed to complete AA field work. • Earliest needed will be 2014 for LAKE vegetation map.

  41. Veg. Mapping - Project Team Members

  42. Members of UNLV Field Crew, 2010 • Kate Prengaman, Crew Leader • Teague Embrey, Field Lead • Sarah Schimd, Field Lead • Karin Edwards, Crew member • Carl Howard, Crew member • Julia Howard, Crew member • Project P.I.: Scott Abella

  43. LAKE – Crew at work LAKE_vmap_CREW_CHoward_20100419_0277_01.JPG

  44. NATIONAL VEGETATION INVENTORY PROGRAM (NVIP)CONTACT LIST

  45. LAKE, MOJA and DEVA VEGETATION CLASSIFICATION and MAPPING PROJECT - CONTACT LIST

  46. GREAT BASIN NATIONAL PARK CLASSIFICATION and MAPPING PROJECT - CONTACT LIST

  47. MANZANAR NATIONAL HISTORIC SITE VEGETATION CLASSIFICATION and MAPPING PROJECT - CONTACT LIST

  48. JOSHUA TREE NATIONAL PARK VEGETATION CLASSIFICATION and MAPPING PROJECT - CONTACT LIST

  49. GRAND CANYON PARASHANT NATIONAL MONUMENT(Mapped as part of the Grand Canyon/Lake Mead Classification and Mapping Project) – Contact List

More Related