130 likes | 305 Vues
Y.MMCF progress in ITU-T NGN-WG. China Communications Standards Association. Table of Contents. Output from January 2009 meeting Progress of Interim meeting on March 2009 Inputs of the meeting Results of the meeting Next plan. Out put of Y.MMCF from January 2009 meeting.
E N D
Y.MMCF progress in ITU-TNGN-WG China Communications Standards Association
Table of Contents • Output from January 2009 meeting • Progress of Interim meeting on March 2009 • Inputs of the meeting • Results of the meeting • Next plan
Issues to be solved after January meeting • Functional Entities and interfaces are to be identified; • Interaction between NACF and MMCF is for further discussion • Interaction between MMCF and RACF needs the joint discussion with SG13Q4 experts and needs further contributions
Table of Contents • Output from January 2009 meeting • Progress of Interim meeting on March 2009 • Inputs of the meeting • Results of the meeting • Next plan
Contributions of Interim meeting • Seven contributions received and are basically accepted. • All contributions available at http://ifa.itu.int/t/2009/sg13/exchange/wp3/q5/2009-03/contributions/ • 0903-TD-3 Editorial comments on Y.MMCF • 0903-TD-4 Comments on clause 6.2.2 of Y.MMCF • 0903-TD-5 Comments on clause 6.3 of Y.MMCF • 0903-TD-6 Comments on clause 6.5 of Y.MMCF • 0903-TD-7 Proposal for the functional entities of Y.MMCF (revised after discussion) • 0903-TD-11 Proposed MLMF updates • 0903-TD-12 Proposed NIRF functions in Y.MMCF
Outcomes of Interim meeting • 0903-TD-3 Editorial comments on Y.MMCF • Minor editing – accepted • 0903-TD-4 Comments on clause 6.2.2 of Y.MMCF • Accepted with editorial revisions by France Telecom and two substantive comments by N-S Ko (ETRI) • 0903-TD-5 Comments on clause 6.3 of Y.MMCF • Minor editing – accepted • 0903-TD-6 Comments on clause 6.5 of Y.MMCF • Accepted with slight change in wording proposed by Didier Becam (France Telecom)
Outcomes of Interim meeting (continued) • 0903-TD-11 Proposed MLMF updates • 0903-TD-12 Proposed NIRF functions in Y.MMCF • Appear to be accepted with editorial revisions by France Telecom (needs formal confirmation)
Outcomes of Interim meeting (concluded) • 0903-TD-7 Proposal for the functional entities of Y.MMCF • Mobility Location Management Functional Entity (MLM-FE) agreed • Network Information Repository Functional Entity (NIR-FE) agreed • Continuing discussion (at time of writing) on how finely to divide the remaining functions of network information distribution, handover decision, and handover control. • Need a sufficiently refined model that mapping between it and 3GPP entities (e.g. ANDSF) is possible. • Basic underlying issue is what the linkages there are amongst the FEs and between them and the UE. Would like to limit the number of interfaces supported by the UE (e.g. to MLM-FE and one other FE).
Figures from the Interim meeting NACF MMCF RACF HGW-FE MLM-FE PD-FE TUP-FE TLM-FE HDC-FE TAA-FE NAC-FE NID-FE?? Whether there is a separate Network Information Distribution Functional Entity (NID-FE) is to be further discussed in May meeting as well as the interface between UE and NID-FE. TRC--FE ?? AM-FE NIR-FE UE Control plane Forwarding plane AR-FE EN-FE ABG-FE IBG-FE L2HEF AN-FE L3HEF L3HEF L3HEF L2 Transport Functions Packet Transport Functions Access Transport Core Transport
Table of Contents • Output from January 2009 meeting • Progress of Interim meeting on March 2009 • Inputs of the meeting • Results of the meeting • Next plan
Next plans • Y.MMCF is scheduled for approval in May meeting; • The mapping with 3GPP should be identified in the Y.MMCF document before approval.