1 / 6

Draft 2015 WECC Budget

Draft 2015 WECC Budget. Standing Committee Meetings March 25-27, 2014. 2015 Budget. Continues the level of product and service support to the Western Interconnection that was delivered during 2014 plus: Develops RAS modeling Returns WIT to WECC (from Peak) Funds TEPPC work

fawzi
Télécharger la présentation

Draft 2015 WECC Budget

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Draft 2015 WECC Budget Standing Committee Meetings March 25-27, 2014

  2. 2015 Budget • Continues the level of product and service support to the Western Interconnection that was delivered during 2014 plus: • Develops RAS modeling • Returns WIT to WECC (from Peak) • Funds TEPPC work • Overall budget is 4.88% increase over 2014

  3. Why WECC for RAS Development Simple RAS More Complex RAS • Data needed for simple and complex RAS • RAS information must be shared between software platforms • accurate study results • coordination of RAS

  4. WECC Interchange Tool • Moved to Peak RC in 2014 budget as part of bifurcation • Supports Interchange Authority registered function (Peak RC) • Proposed changes to INT standards remove IA applicability • WIT calculates NERC Inadvertent Interchange and Primary Inadvertent Interchange • WIT is single source for confirmed interchange • Budget is monthly operational cost of the tool

  5. Transmission Expansion Planning • Departmental budget down $3.0 million from 2014 • ARRA grant expires 12/31/14 as a funding source • 2015 budget 9% lower than forecast in 2009 when grant was issued • Core activities and deliverables continue

  6. Budget Process Timeline • March 6 – Reviewed with MAC subcommittee • March 12 – Presented to WECC FAC • May 2 – Posting for public comment • June 26 – WECC Board approval • July – submit to NERC • August – NERC Board approval • October/November – FERC approval

More Related