1 / 4

SCT DAQ Upgrade for High- m The discussion Wednesday, 16 May 2012 from 14:00 to 18:00

SCT DAQ Upgrade for High- m The discussion Wednesday, 16 May 2012 from 14:00 to 18:00. Steve McMahon RAL. Thanks!.

faxon
Télécharger la présentation

SCT DAQ Upgrade for High- m The discussion Wednesday, 16 May 2012 from 14:00 to 18:00

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SCT DAQ Upgrade for High-mThe discussionWednesday, 16 May 2012 from 14:00 to 18:00 Steve McMahon RAL

  2. Thanks! A big thank you to everybody for preparing the material for this meeting. This is especially true of the non-SCT folks, some of whom have come a long way, or interrupted their vacation to attend.

  3. Aims • We need to be able to deliver an SCT DAQ system that will deliver good SCT (closer to error and dead-time free) data at 3x1034cm-2s-1 • In effect (unless we do something drastic) this means being able to drive the ROD-ROS link at close to the limit imposed by the ABCD-ROD. • The timescale for the upgrade is during the first long shutdown (2013-2014). • The solution should have certain, rather obvious, features: • It should be fit for purpose and it should meet the technical requirements imposed by the not replaceable hardware. • It should make optimal use of the existing manpower resources. • The individuals and participating groups need to “buy into” the solution. • We need to understand clearly where the boundaries of the solution are in terms of what is delivered (especially of that solution has its origins “outside” the SCT) • The costing should be clearly understood and a cost effective solution adopted. If necessary the cost can be spread over several years. I assume all of the cost will be picked up in SCT-M&O-B costs. • The timescale must be clearly defined and the solution realizable with clear margins for safety. • The number of open ended ventures should be minimized. • Remember also that the SCT will not be available for long periods in LS1. • I do not know how much of the DAQ infrastructure will be available for a lot of LS1

  4. The choice of solution • The choice is an SCT one. It will be taken between the SCT-PL and the SCT-DAQ group. • We want to get to this choice fairly quickly (hopefully a few days if not a couple of weeks) and I hope that at the end of this meeting we will have all of the information we need or know how to get it quickly.

More Related