The East Area in autumn ‘98

East Beam Control Room EBCR. EP_T11. EP_T10. T11. The East Area in autumn ‘98. EP_T9a. EP_T9b. ALICE. ATLAS/CMS. DIRAC. Irradiation Area 1. EP_IR1. EP_T7. LHC_B. EP_T8a. Irradiation Area 2. EP_T8b. Not yet installed. EP_IR2. Secondary Beams Start-up. T11+ Irrad1. T10. T9.

feivel
Télécharger la présentation

The East Area in autumn ‘98

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. East Beam Control RoomEBCR EP_T11 EP_T10 T11 The East Area in autumn ‘98 EP_T9a EP_T9b ALICE ATLAS/CMS DIRAC Irradiation Area 1 EP_IR1 EP_T7 LHC_B EP_T8a Irradiation Area 2 EP_T8b Not yet installed EP_IR2

  2. Secondary BeamsStart-up T11+ Irrad1 T10 T9 13/07 03/08 East Area Physics Starts 01/09 01/07 We arehere T7 T8 East Area Stop 28/09 26/10 07/12

  3. Update: 26/03/1998 ( ) ( ) ( ) * * * Date Time 18/06 08h00 01/07 14h00 13/07 14h00 31/07 09h00 01/08 08h00 03/08 14h00 05/08 08h00 19/09 24h00 28/09 09h00 26/10 09h00 03/11 06h/14h 16/11 09h00 27/11 09h00 Tech. Stop Cycles East Area Beam Commissioning Shut-Down 2N1 or 2N0 or 2S7 or 2S7i or 2NS7 or 2NS7i or S7, N1 (PPM) or S7i, N1 NS7, S8 or NS7, NS8 Day S7i, N1 2NS7i 2NS7 NS7, S8 Same as with 7 7i Same as NS7, 2S8 or 2NS7, S8 Night Same as during the day 3S7i 3NS7i 3NS7 3NS7 New Requests We arehere Users Irrad1 T7 T8 T9 T10 T11 Primary Beams Setting-up PPM MDs 24/06 08h0016h00 08/07 08h0016h00 19/08 08h0016h00 31/08 06h00 21h00 16/09 08h00 16h00 07/10 08h00 16h00 21/10 08h00 16h00 11/11 08h00 16h00 18/11 08h00 16h00 Key Stop 07/12 08h00 Commissioning & Setting-up Physics PPM required for East Hall Operation East Cycles 2N1 or 2S7 or 2NS7 : 2 cycles, each one with beam destination DN1 or DS7 or DNS7 East Cycles 2S7i or 2NS7i : 2 cycles, each one with beam destination DS7 or DNS7, Beam to Irradiation1 East Cycles S7, N1 : PPM between 1 cycle with beam destination DS7 and another one with beam dest DN1 S05

  4. Status of EHNL • Beam provided to scheduled Users • T7 (Irradiation1) and T11 running • T10 commissionned up to 7 GeV/c • Hardware, Software • Power supplies : OK • Controls (Partial PPM, New Working Sets, ...) : OK • Instrumentation (SECs, Telescopes, MWPCs) : OK • Image Digitiser : eagerly waiting for operational device • Problems still pending in the area • T10 radiation shielding • Flanges to be mounted in T9 and T7 • Cerenkovs counters to be installed in T10 and T7 • Remaining problems with the beam • Strong low frequency ripple in the spill • Improve beam quality for DIRAC D. Gueugnon PS/OP; J.-P. Riunaud PS/CA