1 / 16

P AUL P ISANO R OAD W EATHER M ANAGEMENT C OORDINATOR F EDERAL H IGHWAY A DMINISTRATION

T HE FHWA P ROGRAM FOR P ROTOTYPING A DVANCED D ECISION S UPPORT FOR W INTER R OAD M AINTENANCE. P AUL P ISANO R OAD W EATHER M ANAGEMENT C OORDINATOR F EDERAL H IGHWAY A DMINISTRATION. Presentation Overview.

finian
Télécharger la présentation

P AUL P ISANO R OAD W EATHER M ANAGEMENT C OORDINATOR F EDERAL H IGHWAY A DMINISTRATION

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. THE FHWA PROGRAMFOR PROTOTYPING ADVANCED DECISION SUPPORT FOR WINTER ROAD MAINTENANCE PAUL PISANO ROAD WEATHER MANAGEMENT COORDINATOR FEDERAL HIGHWAY ADMINISTRATION

  2. Presentation Overview • Summarize Surface Transportation Weather Decision Support Requirements (STWDSR) effort • Highlight STWDSR findings • Review Maintenance Decision Support System (MDSS) project

  3. The STWDSR Process Goals The Highway System Decision Support System Safety Mobility Productivity Environment National Security (Outcomes) STWDSRNeeds, Requirements, Outcomes Performance Requirements on DSS Operational Techniques (Output) User Needs for Information System Resources (Information)

  4. Progress to Date FHWA Weather Team STWDSR V2.0 Road Weather Mgmt. Prog. Operational Concept Description White Paper MDSS Prototype & Ops. Test 00-03 STWDSR Needs (V1.0) Preliminary Interface Reqs. Met. Comm. Stakeholders: State DOTs, National Labs (6), Value Added Meteorological Services (VAMS) STWDSR Project (Mitretek) 1997 2000

  5. Decision Support Needs (V1.0) • Defined “needs” as “decisions” • Covered all surface transportation decision makers • Defined 426 needs • Across 44 decision maker categories • Across 3 scales: planning, operational, and warning

  6. Examples of Needs

  7. Operational Concept Description (V2.0) • Analyzed winter road maintenance decisions • Originally 10 operational scale decisions • Expanded to 53 • Organized into 16 clusters • Defined essential functions (i.e., system requirements) for the Weather Information for Surface Transportation – Decision Support System (WIST-DSS)

  8. Needs: Timing and Confidence 14, 75% 0, 96% 2.H Act. Staff 2.K Prime Disp. 2.G Prep Equip. 41, 40% 14, 56% 2.B Prepare 2.D Prep. Exp. 33, 60% 9, 77% 2.F Asgn. Crews 2.I Init. Dispatch 2.E Select Strat. 2.C Get Ready 16, 72% 49, 46% 29 3.8, 95% 2.A Aware Monitor Detect 100 30 10 3 0 -3 Time Before Event (Hrs., pseudo logarithmic)

  9. Preliminary Interface Requirements (V2.0) • Defines the information resources needed from external sources for decision support. • Synthesizes the Information Taxonomy • 212 items necessary to support winter road maintenance decisions • Three categories: environmental information, transportation state information, and the treatment asset information.

  10. Formation of the MDSS Environmental Threat 212 Data Objects Transportation State Treatment Assets

  11. Prototype DevelopmentThe MDSS Project • Puts STWDSR effort into practice for one user group (winter maintenance managers) • Based on design elements captured in the OCD and information interfaces in the PIR

  12. response_decision situation_selector decision_file query_decision scenario_selector Present Decision time_local decision_selector Update Clock decision_situation Generate Scenario Monitor Conditions decision_criteria time_universal conditions_scenario decision_operational response_scenario query_scenario input_user Update Context context_selector context_update presentation_user context_operational context_planning Make Decision context_parameters Select Context Primary Information Interfaces (to all processes) Computer-Human Interface Logical Functions Defined by OCD for MDSS

  13. MDSS Approach • Employ National Labs to develop prototype modules • Iterative development with users and system deployers • Based on open systems principles • Field test

  14. MDSS Prototype Developers

  15. Development Schedule Labs, DOTs, VAMS OCD & PIR Prototype Development Field Test & Evaluation Deployment 9/00 9/01 7/03

  16. References & Contacts • All documents are posted on the Electronic Document Library www.its.dot.gov/welcome.htm • To participate in MDSS contact • Rudy Persaud – 202-493-3391 rudy.persaud@fhwa.dot.gov • Gary Nelson – 202-488-5718 gnelson@mitretek.org

More Related