1 / 7

Levan Babukhadia

Collaboration Meeting , September 13, 2001, Fermilab. L1CTT/PS Firmware Status. Levan Babukhadia. SUNY at Stony Brook. http://www-d0.fnal.gov/~blevan/upgrade.html. After the October shutdown we must have all DFE hardware and all download infrastructure

floria
Télécharger la présentation

Levan Babukhadia

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Collaboration Meeting, September 13, 2001, Fermilab L1CTT/PS Firmware Status Levan Babukhadia SUNY at Stony Brook http://www-d0.fnal.gov/~blevan/upgrade.html

  2. After the October shutdown we must have • all DFE hardware and • all download infrastructure • in place; Otherwise we will NOT have the track/preshower trigger for some long time to come! • The Firmware group continues to concentrate on developing the VHDL code beyond the Occupancy Level only trigger firmware • I will concentrate on the CFT/CPSax firmware

  3. DFEA (80) : Jamieson • Occupancy Level firmware operational, tested with DataPump and AFEs • Track firmware done (4 FPGAs), MAX Pt design extensively tested with DataPump • New protocols nearly done • Develop a software TestBench • The L1 pipeline and the L2 output • Backend (5-th) FPGA: • Rewrite the L1MUON track sorter with FIFOs instead of LIFOs • Add track isolation support • Modify track/cluster matching engine for single threshold CPS clusters • Improve cluster finding (-bias)

  4. L1 CTOC (8) : Brian/Ricardo • Software TestBench in place • Occupancy Level firmware operational, extensively tested with TestBench and DataPump • Full CTOC firmware also in place, well tested with TestBench and DataPump except for the M/P and Cluster Counts. • New protocols done • Synch studies with TestBench • Add synchronization and L3 Sender via L1FE and repeat TestBench and DataPump tests • Treatment of isolations, tau triggers, etc.

  5. CTTT (1) : Levan • Software TestBench in place • Occupancy Level firmware with THT(3) neoterms done and extensively tested with TestBench, including chaining CTTT with CTOC • Synchronization and L3 Sending implemented and tested in TestBench • New protocols done • Add TTK(8)/TEL(4) neoterms next, quadrant terms not very useful yet • More extensive tests of synch and L3 Sending in TestBench • Test & certify with DataPump • Understand and test details of commu-nications with TM • Add the remaining neoterms

  6. L2 CTOC CFT (8) : Carsten • Software TestBench now in place, needs modifications for the L2 • Started to test the design with limited number of TestVectors • Several modifications/improvements to VHDL code • New protocols done • More extensive studies with TestBench are needed • Majority vote on turn/crossing number (a la L1FE?); and event counter (?) • Add L2 synchronization (hopefully not very different from L1FE) • Implement L2  L3 Sender • Detecting a missing link (a la CTQD) • L2 CTOC CPS: code exists and is tested, will have to be revisited

  7. L2 CTQD CFT/CPS (4) : Steve • Both CFT and CPS designs are finished • Software TestBench in place, needs modifications for the L2 • Designs tested in TestBench • CFT design tested in DataPump with limited number of TestVectors • Detection of missing link implemented • More extensive tests with TestBench and DataPump are needed • Review the L2 synchronization used • Can not accept another event until processing of a given event is done, and this should be Ok • Because of variable number of tracks, the L2 CTQD CPS data are by definition skewed by a lot as are the L2 CTOC CPS data; need to understand how to best deal with this issue…

More Related