610 likes | 974 Vues
BizTalk Server 2009 Overview, Roadmap & Future. Roberto Poppi Technology Solution Professional Process Platform and SOA Microsoft Schweiz GmbH. Topics. Why? - Challenges What? - BizTalk Server, Capabilities and Benefits What’s New? - BizTalk Server 2009 and Beyond
E N D
BizTalk Server 2009Overview, Roadmap & Future Roberto Poppi Technology Solution Professional Process Platform and SOA Microsoft Schweiz GmbH
Topics • Why? - Challenges • What? - BizTalk Server, Capabilities and Benefits • What’s New? - BizTalk Server 2009 and Beyond • What else? Trip from Dublin to Oslo over the Clouds • Why Now? - Summary
Challenges Facing Businesses • Maximize value from existing investments • New investments must bring tangible returns and save money … in short: do more with less!
Key Customer Pain Points • Disparate systems • Inconsistent information • Insufficient supply chain collaboration • Frequent business changes • Inefficient manual processes • Hard to manage complex business rules • Lack of visibility of assets and processes
IT Business Challenges • Gain critical insights on business processes and performance • Empower Customers and Employees with Unified View of Informationand Processes • Respond Rapidly to Market and Competitive threats Connect Change Control
Topics • Why? - Challenges • What? - BizTalk Server, Capabilities and Benefits • What’s New? - BizTalk Server 2009 and Beyond • What else? Trip from Dublin to Oslo over the Clouds • Why Now? - Summary
HR CRM ERP E-Commerce Managed Service Mediation • Use existing applications and technologies • Loosely coupled message integration • Centralized conversion and transformation logic • Traceable message flows • Reliable delivery • Secure Messaging BizTalk
Simplify Interoperability “Pluggable Adapters In the Box” MQ MSMQ WSE HTTP SMTP File FTP POP3 SOAP SWIFT HL7 RosettaNet HIPAA SQL WCF Adapter SharePoint • PeopleSoft • JD Edwards • OneWorld XE • JD Edwards • Enterprise1 • Oracle ODBC • Siebel • TIBCO Rendezvous • TIBCO EMS • SAP • EDI/AS2 • X12 and EDIFACT support • Drummond Interoperability Certification • Host Applications • IBM mainframe zSeries(CICS and IMS) • Midrange iSeries(AS/400) • IBM DB2 • Mainframe DB2for z/OS • Midrange DB2/400 • DB2 Universal Database for open platforms (AIX, Linux, Solaris, and Windows) • Host Files
HR CRM ERP E-Commerce Rich Service Composition • Model driven visual logic • Technology Agnostic • Flexible transaction and exception handling • Reusable design patterns BizTalk
Abstracting Rules • Streamline and speed up processes • Make decision makers more productive • Empower non-developers to automate rules • Adjust business strategy on-the-fly
BizTalk Server BAM BizTalk Server Visibility Into DistributedProcesses With BAM Business WF BAM Interceptor WCF BAM Interceptor Reporting Services
BAM Through Office BI Articulate goalsCentralized authoring and access right management of scorecardsand KPIs Analyze issues Contextualized analysis of scorecards, KPIs, reports and unstructured data Collaborate and actStrong integration with Portal and Office system Manage your businessData-driven e-mail notifications for scorecard and KPIs
Tools • Graphical • Model Driven
BizTalk Runtime Architecture • Message • Host • Host • Host • Send Port • Receive Port Adapter Adapter • Orchestration • BTS • Msg • Receive • Pipeline • Send Pipeline • BTS • Msg • BTS • Msg Message Box Map Map • Message • BTS • Msg • BTS • Msg • BTS • Msg
BizTalk RFID – Value Proposition Rich Integration Capability Mobility Enterprise Manageability Rich Development Platform • .NET Based SDK • Extend Platform Capabilities • Build Rich RFID Enabled Applications • Store & Forward • Windows Mobile & Windows CE • “Plug & Play” • Manage and Monitor Devices • UHF, HF, LF, Active, RTLS, NFC and Sensor Devices • Real Time Failover • Integrates System Center Operations Manager • Out of Box Event Handlers SQL, BRE, Web Services • Integrates with BizTalk® Server to Leverage • 40+ Adapters • BPM, EDI, EAI Capability • SOA Platform • .NET Based SDK • Extendible Driver(DSPI) Model to Support Varied Devices • Extend Platform Capabilities • Build Rich RFID Enabled Applications Developers Mobile Workers IT Operations Managers Architects
BizTalk Server VersionsContinuous innovation: Release about every 2 years V6BizTalk Server 2009 V5BizTalk Server 2006 R2 V4BizTalk Server 2006 V3BizTalk Server 2004 ALM Support ESB(2.0) BPM Extend B2B BAM+ RFID Mobile and Std Pack New Adapters Update Swift V2BizTalk Server 2002 V1BizTalk Server 2000 SOA/ESB BPM Extend B2B (+EDI/AS2) RFID SOA/ESB Adaptersin Box HostIntegration BPM Partner Adapters EAI (partner adapters) Vertical B2B XML B2B 7,000Customers 8000Customers 500Customers 2,000Customers 4,000Customers
The Tale of Two WorkflowsUsing BizTalk 2009 & SharePoint 2007 Workflows Together PurchaseRequestProcess InvoiceProcess
Topics • Why? - Challenges • What? - BizTalk Server, Capabilities and Benefits • What’s New? - BizTalk Server 2009 and Beyond • What else? Trip from Dublin to Oslo over the Clouds • Why Now? - Summary
BizTalk Server 2009 Business to Business Integration Developer & Team Productivity Updated Platform Support SOA and Web Services • Support for .NET Framework 3.5 SP1 and Visual Studio 2008 SP1 • Take advantages of the latest developer tools • Support for Windows Server 2008and SQL Server 2008 • Hyper-V support • Increased performance & scale New UDDI v3 Web Services Registry New and enhanced LOB adapters (Oracle EBS, SQL) Enhanced host systems integration (MQ, CICS, IMS) Enhanced BAM support ESB Guidance 2.0 delivers updated prescriptive guidance New Mobile RFID Platform New RFID device management and industry standards support Enhanced Support for EDI and AS2 Protocols and Drummond certification Updated SWIFT Support and SWIFTReady Financial EAI Gold certification • New Application Lifecycle Management (ALM) support • Support for TFS - integrated source control, bug tracking, MSBuild automation • Enhanced Developer Productivity • Visual Studio project system updates
BizTalk Server 2009 Business to Business Integration Developer & Team Productivity Updated Platform Support SOA and Web Services • Support for .NET Framework 3.5 SP1 and Visual Studio 2008 SP1 • Take advantages of the latest developer tools • Support for Windows Server 2008and SQL Server 2008 • Hyper-V support • Increased performance & scale New UDDI v3 Web Services Registry New and enhanced LOB adapters (Oracle EBS, SQL) Enhanced host systems integration (MQ, CICS, IMS) Enhanced BAM support ESB Guidance 2.0 delivers updated prescriptive guidance New Mobile RFID Platform New RFID device management and industry standards support Enhanced Support for EDI and AS2 Protocols and Drummond certification Updated SWIFT Support and SWIFTReady Financial EAI Gold certification • New Application Lifecycle Management (ALM) support • Support for TFS - integrated source control, bug tracking, MSBuild automation • Enhanced Developer Productivity • Visual Studio project system updates
BizTalk Server 2009 Business to Business Integration Developer & Team Productivity Updated Platform Support SOA and Web Services • Support for .NET Framework 3.5 SP1 and Visual Studio 2008 SP1 • Take advantages of the latest developer tools • Support for Windows Server 2008and SQL Server 2008 • Hyper-V support • Increased performance & scale New UDDI v3 Web Services Registry New and enhanced LOB adapters (Oracle EBS, SQL) Enhanced host systems integration (MQ, CICS, IMS) Enhanced BAM support ESB Guidance 2.0 delivers updated prescriptive guidance New Mobile RFID Platform New RFID device management and industry standards support Enhanced Support for EDI and AS2 Protocols and Drummond certification Updated SWIFT Support and SWIFTReady Financial EAI Gold certification • New Application Lifecycle Management (ALM) support • Support for TFS - integrated source control, bug tracking, MSBuild automation • Enhanced Developer Productivity • Visual Studio project system updates
BizTalk Enterprise Service Bus Guidance v2 • Why you want it… • Higher levels of reuse • Lower operational costs • Dynamic business changes • Collection point for business, service and exception metrics • What it gives you… • Loosely-coupled messaging environment • Registry-driven message routing • Service Discoverability • Itinerary-based routing • Logically-centralized messaging fabric
ESB v2 Reference Architecture Microsoft BizTalk Server Off-ramps ESB Core On-ramps Core Engine Services Generic SOAP Send Route Service Enrich Service Pipeline Generic SOAP Receive Pipeline Generic WCF Send Custom Service Transform Service Generic Pipeline Generic WCF Receive Pipeline Generic JMS Send Generic JMS Receive Pipeline JMSPipeline Resolver-Adapter Framework Resolvers (…) Adapter Providers(…) Custom Send Generic Custom Receive Custom Pipeline Custom Pipeline Custom Resolver Custom Adapter Provider ESB Management Portal Provisioning Framework Exception Management Exception Handler or Custom Application Reports Exception Logger Fault Processor Alerts ESB Services Resolver Web Service Itinerary Configuration Store Transformation Web Service Exception Management Store UDDI Service Operations Service Exception Web Service
BizTalk Server 2009 Business to Business Integration Developer & Team Productivity Updated Platform Support SOA and Web Services • Support for .NET Framework 3.5 SP1 and Visual Studio 2008 SP1 • Take advantages of the latest developer tools • Support for Windows Server 2008and SQL Server 2008 • Hyper-V support • Increased performance & scale New UDDI v3 Web Services Registry New and enhanced LOB adapters (Oracle EBS, SQL) Enhanced host systems integration (MQ, CICS, IMS) Enhanced BAM support ESB Guidance 2.0 delivers updated prescriptive guidance New Mobile RFID Platform New RFID device management and industry standards support Enhanced Support for EDI and AS2 Protocols and Drummond certification Updated SWIFT Support and SWIFTReady Financial EAI Gold certification • New Application Lifecycle Management (ALM) support • Support for TFS - integrated source control, bug tracking, MSBuild automation • Enhanced Developer Productivity • Visual Studio project system updates
Logical Overview Business Applications Connect to Multiple LOB Apps Orchestrate Business Process Apply Business Logic Business Intelligence BAM for Process BI SQL/SQL BI forData Analytics RFID and Sensor Services Manage Devices at the Edge Add Context and Turn Raw Events intoBusiness-Process–Relevant Information Interpret Events at the Edge ThroughFilters, Rules a Alerts Distributed ’Edge’ Sites Running BizTalk®RFID Device Layer RFID Fixed andMobile Readers Barcode Scanners PLCs, etc. Physical Layer RFID tags, barcodes Biometric systems Environmental sensors, etc.
BizTalk Server 2009 Business to Business Integration Developer & Team Productivity Updated Platform Support SOA and Web Services • Support for .NET Framework 3.5 SP1 and Visual Studio 2008 SP1 • Take advantages of the latest developer tools • Support for Windows Server 2008and SQL Server 2008 • Hyper-V support • Increased performance & scale New UDDI v3 Web Services Registry New and enhanced LOB adapters (Oracle EBS, SQL) Enhanced host systems integration (MQ, CICS, IMS) Enhanced BAM support ESB Guidance 2.0 delivers updated prescriptive guidance New Mobile RFID Platform New RFID device management and industry standards support Enhanced Support for EDI and AS2 Protocols and Drummond certification Updated SWIFT Support and SWIFTReady Financial EAI Gold certification • New Application Lifecycle Management (ALM) support • Support for TFS - integrated source control, bug tracking, MSBuild automation • Enhanced Developer Productivity • Visual Studio project system updates
Bugs Non FunctionalRequirements Dev Team Tasks Use Case Business Analyst Project Manager Change Requests Test Production Errors Operations Application Life Cycle Management with TFS & VSTS Integration • Support for team development • MS Project Server integration • Consistent automated build • Integrated source control • Bug tracking system
Full integration into Microsoft Project & Excel for a real-time view of work items Project Planning
Customizable SharePoint portal for team collaboration Team Project Portal
BizTalk Project System • BTS Project - Flavored version of baseline C# Project from Visual Studio 2008 • Core Features from Baseline project • Project and Item Templates • Integrated designer and debugging experience • Command, Context, and toolbar options • Build and Validate Error Navigation • Source Control and TFS Integration • Project Assembly properties • Flavoring adds custom features to the baseline project
BizTalk Team Test Functionality • Create unit tests for Maps, Schemas, Pipelines • Enable Unit testing by setting property on Deployment tab for a BizTalk project
Debugging Support • Debug Map Feature – XSLT • Inline XSLT Debugger • Debugging Orchestrations and Pipelines • BizTalk Trace Functionality – private variables are now visible in the trace • We can now capture trace for off-line debugging – you can tell between engine code and custom code • We can now enable tracing at every level
Build Automation • Automate your BizTalk builds… including scheduled or on demand • Refined control over your process • Moving assemblies • Building Applications • Generating .msi files • Options • Scripts (.vbs, .bat, PowerShell, etc.) • Nant • MSBuild
Developing Enhancement • BizTalk Server 2009 provides an integrated development platform within Visual Studio • Deep integration is enabled by flavoring existing C# project system and additional customizations • New ALM experience includes Source Control, TFS integration, Unit Testing, MSBuild and Deployment • More Productive and Efficient BizTalk developer experience
Topics • Why? - Challenges • What? - BizTalk Server, Capabilities and Benefits • What’s New? - BizTalk Server 2009 and Beyond • What else? Trip from Dublin to Oslo over the Clouds • Why Now? - Summary
Whatis "Oslo"? THE PLATFORM FOR MODEL-DRIVEN APPLICATIONS “M” The language for authoring models & DSLs “Quadrant” The tool for interacting with models & DSLs Repository The database for storing & sharing models
Delivering the "Oslo" Vision Modeling Language An approachable, mainstream, textual modeling language for describing both data (e.g. requirements) and behavior (e.g.workflow) Process Server A full featured execution environment for workflow, rules, and any .NET service. Repository Database to store and share models Modeling Tools Create, edit, and browse models Cloud Services A set of Microsoft hosted services including a service bus and a process server Bus Analyst Arch Dev IT Pro Service Bus Allows services to discover and communicate with each other Modeling Tools Modeling Language Model Repository Process Server Service Bus Cloud Services
On-Premises + Cloud Services Visual Studio & .NET “Oslo” - Modeling Partners
Architecture of “Dublin”A Windows Application Server Extensions • Evolution of WAS/IIS and Windows App Server role to run and manage WF and WCF services • Initial release is a web download • Ships soon after VS10 Visual Studio Oslo Windows Server “Dublin” Administration Tools System Center WF and WCF services .NET Framework IIS/WAS
BizTalk Server & “Dublin” ESB Guidance RFID HL7 BizTalk Server Integration Server SWIFT EDI Windows Server + “Dublin” Application Server SAP, Oracle, PeopleSoft Dynamics CRM Main Frame
Topics • Why? - Challenges • What? - BizTalk Server, Capabilities and Benefits • What’s New? - BizTalk Server 2009 and Beyond • What else? Trip from Dublin to Oslo over the Clouds • Why Now? - Summary
Cut Costs With BizTalk ServerExtract More Value from Investments • Avoid rip-and-replace by connecting to legacy systems • Safely eliminate high-cost B2B/EDI infrastructure • Use virtualization to reduce the cost of infrastructure
Cut Costs With BizTalk ServerBoost Business Agility • Respond to business requests faster • Composite applications • Industry accelerators • Integrate newly acquired systems • Take advantage of existing IT skills