An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Welcome to Public Workshop IIIRoute 55 : Lauer Road – T.S.P.

  2. Meeting Agenda • Summery of Public Workshops I & II • Citizen Advisory Committee (C.A.C.) • Preferred Design Alternative • Community feedback

  3. Project Objectives • Improve Traffic Operations • Reduce Accidents • Reduce Delay • Support Future Needs of the Community and Corridor

  4. Project Focus • Improve Intersection Operations • Address Heavy Traffic on Route 55 • Improve Business Access • Improve Bike/Pedestrian Access and Safety

  5. Citizens Advisory Committee • Committee Make-up • 17 members • Diverse representation • Community voice • Focus • Community Priorities • Schedule • Six Monthly Meetings

  6. 5 Conceptual Layouts2 Preliminary Alternatives1 Preferred Alternative

  7. Stringham Road Realignment • Relocate Road to align with Arlington High School (AHS) Main Entrance • Eliminate existing “T” Intersection • Construct new sidewalk • Provide 4’ Shoulder • Accommodate Endangered and Threatened Species

  8. AHS/ Stringham/ Route 55 Intersection • Modern Roundabout • Yield Approach • No Turn Lanes • Rights in/out • Raised Median • Permitted Pedestrian • Sidewalk

  9. Route 55/Freedom Road Intersection • Modern Roundabout • Yield Approach • No Turn Lanes • Rights in/out • Raised Median • Permitted Pedestrian • Sidewalk

  10. Intersection - Business Centers

  11. Dr. Fink Connector • 2-Way Operation • Maintain Access to Business • Provide Access to School • Create Additional Pedestrian Connection • Right’s In / Right’s Out • Increase Circulation

  12. Roadway Cross Sections

  13. Safety Considerations 8 Vehicle to Vehicle Conflict Points 32 Vehicle to Vehicle Conflict Points 24 Ped. to Vehicle Conflict Points 8 Ped. to Vehicle Conflict Points

  14. Insurance Institute for Highway Safety • The Institute examined 24 intersections in eight states that were converted from stop signs or traffic signals between 1992 and 1997. • Vehicular accidents overall declined 39 percent. • Accidents resulting in injuries fell 76 percent. • Accidents resulting in death or incapacitating injury plunged 90 percent.

  15. Next Steps • Progress Preferred Alternative to Design Approval (Feb. 2012) • Begin Detailed Design Process (Spring 2012) • Initiate Permit Process • Initiate Property Acquisition Process • Public Update Meeting prior to Construction Commencement (March 2013) • Construction Begins – (May 2013)