Offshore Artic Data Collaboration Project (OADC). Møte i Faglig forum for Barentshavet og områdene utenfor Lofoten, Polarmiljøsenteret, Tromsø, 31. januar 2007 Andreas Jordell Acona og Prosjektkoordinator OADC. OADC Formål.

1 / 8

Download Presentation
Télécharger la présentation

Offshore Artic Data Collaboration Project (OADC)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Offshore Artic Data Collaboration Project(OADC) Møte i Faglig forum for Barentshavet og områdene utenfor Lofoten, Polarmiljøsenteret, Tromsø, 31. januar 2007 Andreas Jordell Acona og Prosjektkoordinator OADC

  2. OADCFormål Tilgjengeliggjøring og tilrettelegging av miljødata og kunnskap omkring petroleumsvirksomhet i Arktis Altså: En web-portal

  3. OADCDatatyper Petroleumsindustrien er viktigste bidragsyter og legger derfor premissene for hva slags type data som ønskes • Data skal primært fungere som beslutningsstøtte for petroleumsindustrien og må derfor være tilpasset dennes behov. • Viktigste datatyper • Biologi • Batymetri • Is • Metrologi & Oseanografi (Metaocean) • Infrastruktur • Standarder og regelverk

  4. OADCBegrensninger og omfang • OADC skal ikke selv stå for innsamling av data men ønsker å integrere data fra eksisterende kilder inn i én felles portal • Operatører (5 sponsorer) • Offentlig innsamlet data (30 potensielle leverandører identifisert) • Eksisterende datainnsamlingsinitiativ (portaler) • Prosjektet skal stå for kvalitetssikring av data

  5. - AARI – Acrtic and Antarctic Research Institute (Russia) - Det Norske Veritas - Directorate of Fisheries - Directorate for Nature Management - DNMI – Norwegian Meteorological Institute - ICG - International Centre for Geohazards - IMR - Institute of Marine Research - IUA –Committee for Inter-Municipality Immediate Preparedness - MAREANO - Marine Area Database for the Norwegian Coast and Ocean Areas - Ministry of Petroleum and Energy - MRDB – Marine Resources Database - Nansen Institute - NCA - The Norwegian Coastal Administration - NDP – Norwegian Deepwater Programme - NGI - Norwegian Geotechnical Institute - NGU - Geological Survey of Norway - NINA - Norwegian Institute of Nature Research - NoBaLes / Barents Icewater Programme - NOFO - Norwegian Clean Seas Association for Operating Companies - NNEDB - Norwegian National Earthquake Data Base - NNEA - Norwegian National Earthquake Archive - NNSN - Norwegian National Seismic Network - NORSAR - Norwegian Maritime Directorate - Norwegian Mapping Authority / Norwegian Hydrographical Service - Norwegian Defence Research Establishment - NPD - Norwegian Petroleum Directorate - NP – Norwegian Polar Institute - NTNU - Norwegian University of Science and Technology - OKN – Committee of Operators in the North - PTIL – Petroleum Safety Authority Norway - Rogaland Research - SEA - Scandinavian Earthquake Archive - SINTEF - SFT - Norwegian Pollution Control Authority - Standards (ISO, IEC, NORSOK, www.standard.no) - UiO - University of Oslo - UiB - University of Bergen - UiT - University of Tromsø Identifiserte data leverandører

  6. OADCOrganisering Styringskomité Prosjektledelse Ekspertgruppe Ekspertgruppe IT-ressurs Data leverandør Data leverandør IT-leverandør

  7. OADCTidsplan (Fase II) • Norsk del av Barentshavet • 1. Milepæl (4Q 2007) • Data seleksjonsrapport • Anbefalt IT-løsning • Anbefalt framtidig organisasjons- og driftsmodell • 2. Milepæl: Pilotmodell (2Q 2008) • 3. Milepæl: Full implementering

  8. OADCHvorfor bidra? Incentiv for deltagere i OADC • Integrering i faglige forum • Økt tverrfaglig samarbeid • Økt toveis forståelse og synliggjøring Mål med møtet • Knytte kontakter med aktuelle samarbeidspartnere • Bli kjent med eksisterende initiativ (portaler) • Omfang og datatyper • IT-løsninger