The Electronics Group in 2012 accomplished significant milestones with a dedicated team of engineers and assistants. Key projects included the ATLAS and IBL upgrades, advancements in neutrino research, and the MICE experiment. Notable achievements involved the qualification of hardware against electromagnetic interference, development of PCB and flex savers, and the design and testing of various electronic components for the LOFT and POLAR projects. The team's efforts also emphasized collaboration and innovation, paving the way for future experiments in high-energy physics.
E N D
GrElec in 2012 • 3+1 ElectronicsEngineers • Daniel La Marra • Stéphane Débieux • Yannick Favre • Alessandro La Rosa • IBL • 2 Technical Assistants • Gabriel Pelleriti • Javier Mesa 2012 ElectronicHighlights
Projects Highlight • ATLAS (LHC) • IBL (upgrade phase0 2013-2014) • ABCn130 (upgrade phase2 2022) • Neutrinos • MICE (production) • Astrophysique • LOFT • POLAR 2012 Electronic Highlights
IBL : Local support - stave 2012 Electronic Highlights
IBL :Dressed module withflex 2012 Electronic Highlights
IBL - Loadingprocedure 2012 Electronic Highlights
IBL : Test bench for PCB/Flex Saver production • Purpose : Full production test : ~80 PCB savers, 500 Flex savers • Details : • 320 signals / PCB saver : automatic test for short & open circuit on each signal • FPGA firmware development for signals stimulus & PC communication (Yannick) • PC software development for checking & reporting (Yannick) • Test execution (Gaby) PCB saver Flexsavers Xilinx Stimulus Board PC interface Saverunder test Checked OK for ID=1 2012 Electronic Highlights HW interface
IBL : IST & beam pipe EMI qualification • Purpose : Screening qualification against ElectroMagnetic Interference • Measurement : Transfer impedance + Screening attenuation vs frequency : • Tube under test inserted into a copper tube for environment insensitivity • IBL Support Tube (IST) qualification (carbon fiber + Ag glue + end rings) • Beam pipe shielding methods investigation & qualification • Hardware : Vector Network Analyzer [100KHz-4GHz] Tubes under test IST Beam Pipe VNA Bad shielding Copper tube enclosure 2012 Electronic Highlights Good shielding
ABCn-130 :Main improvements 2012 2012 Electronic Highlights
ABCn-130 : Layout (not final) Submission Scenarios • Independent of HCC • Regular MOSIS MPW on 4th February 2013 (reachable for ABC130, not for HCC) • Shared Engineering run with the NA62/TDCpixsubmission (forecast 1Q 2013, may be very close to the MOSIS MPW date, but with some flex.) • With HCC : • Engineering Run, attached to HCC schedule Preferred scenario Chip size7900 um x 6700 um 2012 Electronic Highlights
DBB : Digitizer & Buffer Board • Context : • MICE experiment (RAL/UK) • Electron Muon Ranger detector (EMR) • Part of a collaborative team with the Front End Board • Board & FPGA design + test : StéphaneDébieux Mice experiment EMR 2012 Electronic Highlights
DBB : Overview DIP switch for Board ID AlteraStratixII FPGA Power Supply : 3 DC/DC Connector for FPGA programming 2 Gigabit transceivers LVDS Connections to FEB DAQ SMA Connectors Connectors for DBBs daisy-chain 2012 Electronic Highlights
DBB : Current status • Further tests in the lab qualified the DBB for production • 54 boards to be produced identically to the first 6 prototypes • 2 to 3 months delay expected for the production, delivery in March/April 2013 2012 Electronic Highlights
LOFT : Large Observatory For x-ray Timing • Context : • Matter in neutrons Stars & close to black hole event horizon • ESA program, launch 2020-22 • Wide Field Monitor : high resolution • Large Area Detector : 10m² of detector 2-30keV : • 6 panels • 7x3 modules/panel • 4x4 Front End Electonics/modules => 2016 FEE overall : DPNC/ISDC design responsibility Panel • FEE : • ~130x70mm • Very low noise • Silicon Drift Detector technology (used in ALICE) • 14 ASICs per FEE, 16 channels/ASIC • Chip On Board technology, very small pads (39µ) • Bonding: ASIC to SDD (17µ),Through PCB Bonds, ASIC to PCB • PCB: Flex-Rigid technology Module Back End Electronics FEE 2012 Electronic Highlights SDD (bottom)
LOFT : Large Observatory For x-ray Timing • FEE Prototype 2012 : • Large PCB for measurements access, Small SDDetector Proto, EMC & HV constraints • Components: 4 ASICs, linear regulators, digital interfaces, HV/MV filters • Labview interface • Board Design Schematics + Layout: Yannick • Components & ASIC mounting/bonding: Gaby, Maarten • Tests : in progress at BOLOGNA 75um PCB trace width Trough PCB hole for bonding ASIC SDD location 39um square pads 2012 Electronic Highlights
POLAR : An instrument to measureGamma Ray Burstspolarization • 2 layers flex with stiffener: • Design made by PSI • Schematics and Layout was imported into our Cadence tools • Modification with close relationship with the mechanics group • Added a rigid part (stiffener) • Length changed 2012 Electronic Highlights
POLAR : An instrument to measureGamma Ray Burstspolarization • News in this design: • Very small via between 2 layers • Hole: 0.09mm • Pad: 0.15mm 2012 Electronic Highlights
This year was going on with some works initiated last year or even before: IBL ABCn130 MICE There was also new works for several different projects like: LOFT POLAR But we also started some studies for new projects like: NA61 (neutrinos) DAMPE (astrophysics) JEM-EUSO (astrophysics) Conclusion 2012 Electronic Highlights