1 / 3

MPP Main Ring Magnet Performance Panel Meeting

MPP Main Ring Magnet Performance Panel Meeting. Wednesday 16 January 2008 Agenda : General information & pending actions ElQA Issues by Stephan RUSSENSCHUCK Temperature interlock issues for the 120 A correctors by Markus ZERLAUTH MPP CCC rotation plan for beginning of 2008

gabby
Télécharger la présentation

MPP Main Ring Magnet Performance Panel Meeting

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MPPMain Ring Magnet Performance Panel Meeting Wednesday 16 January 2008 Agenda: General information & pending actions ElQA Issues by Stephan RUSSENSCHUCK Temperature interlock issues for the 120 A correctors by Markus ZERLAUTH MPP CCC rotation plan for beginning of 2008 Electrical safety of LHC quench heater circuits in case of faulty heaters by Reiner DENZ Problems of the level gauges in stand-alone magnets by Juan CASAS-CUBILLOS; Vittorio PARMA Protection of the wiggler circuit RU.R4 by Walter VENTURINI DELSOLARO; Remo MACCAFERRI A.O.B.

  2. General Information • News from Sector 4-5

  3. Cryo OK for 1.9K operation and 4.5K operation in the MS DFBA -LCM valves consolidation ELQA_TP4E/DOC Wk. 03 Q4- Q5- Q6- D2.L5 Level gauges Q6.R4 Level gauges QPS Connections AB/PO tests QPS ELQA – TP4E/DOC Connec PNO RB PIC1 + Connection Wk. 04 Connect CL on DFBL 60A 16 circ. QPS PCC PLI PNO 80/120A - 600A (*) PCC -PIC2 PNO D2 PLI - PNO of RQD - RQF 80-120A Corr. PNO Q4 Wk. 05 PNO Q5 AB/PO tests PNO Q7-Q8. R4 Powering several circuits PNO Q6 Wk. 06 Front2 Front1 (*) in the dead times of the Front1 Front3 Front3

More Related