1 / 42

Analysis of Cilk

This analysis delves into the formal model of Cilk, a framework for parallel computing. It defines threads, processes, and dependencies through a directed acyclic graph (DAG) structure. Key metrics like work (T1), critical-path length (T∞), and parallel time (TP) are explored, establishing performance bounds. The paper discusses greedy scheduling, work stealing, and the importance of managing critical paths. Cilk's guarantees and features such as inlets and memory models are examined for their implications on performance and correctness. Lastly, it raises open questions regarding future improvements.

gala
Télécharger la présentation

Analysis of Cilk

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Analysis of Cilk

  2. A Formal Model for Cilk • A thread: maximal sequence of instructions in a procedure instance (at runtime!) not containing spawn, sync, return • For a given computation, define a dag • Threads are vertices • Continuation edges within procedures • Spawn edges • Initial & final threads (in main)

  3. Work & Critical Path • Threads are sequential: work = running time • Define TP = running time on P processors • Then T1 = work in the computation • And T∞ = critical-path length, longest path in the dag

  4. Lower Bounds on TP • TP≥T1 / P (no miracles in the model, but they do happen occasionally) • TP≥T∞ (dependencies limit parallelism) • Speedup is T1 / TP • (Asymptotic) linear speedup means Θ(P) • Parallelism is T1 / T∞ (average work available at every step along critical path)

  5. Greedy Schedulers • Execute at most P threads in every step • Choice of threads is arbitrary (greedy) • At most T1 / P complete steps (everybody busy) • At most T∞ incomplete steps • All threads with in-degree = 0 are executed • Therefore, critical path length reduced by 1 • Theorem:TP≤T1 / P + T∞ • Linear speedup when P = O(T1 / T∞)

  6. Cilk Guarantees: • TP≤T1 / P + O(T∞) expected running time • Randomized greedy scheduler • The developers claim: TP≈T1 / P + T∞ in practice • This implies near-perfect speedupwhen P << T1 / T∞

  7. But Which Greedy Schedule to Choose? • Busy leaves property: some processor executes every leaf in the dag • Busy leaves controls space consumption;can show SP = O(P S1) • Without busy leaves, worst case is SP = Θ(T1), not hard to reach • A processor that spawns a procedure executes it immediately; but another processor may steal the caller & execute it

  8. Work Stealing • Idle processors search for work on other processors at random • When a busy victim is found, the theif steals the top activation frame on victim’s stack • (In practice, stack is maintained as a dequeue) • Why work stealing? • Almost no overhead when everybody busy • Most of the overhead incurred by theives • Work-first principle: little impact on T1 / P term

  9. Some Overhead Remains • To achieve portability, spawn stack is maintained as an explicit data structure • Theives steal from this dequeue • Could implement stealing directly from stack, more complex and nonportable • Main consequence: • Spawns are more expensive than function calls • Must do significant work at the bottom of recursions to hide this overhead • Same is true for normal function calls, but to a lesser extent

  10. More Cilk Features

  11. Inlets • x = spawn fib(n-1)is equivalent to: cilk int fib(int n) { int x = 0; inlet void summer(int result) { x += result; } if (n<2) return n; summer( spawn fib(n-1) ); summer( spawn fib(n-2) ); sync; return x;

  12. Inlet Semantics • Inlet: an inner function that is called when a child completes its execution • An inlet is a thread in a procedure (so spawn, sync are not allowed) • All the threads of a procedure instance are executed atomically with respect to one another (i.e., not concurrently) • Easy to reason about correctness • x += spawn fib(n-1)is an implicit inlet

  13. Aborting Work • An abort statement in an inlet aborts already-spawned children of a procedure • Useful for aborting speculative searches • Semantics: • Children may not abort instantly • Aborted children do not return values, so don’t use these values, as in x = spawn fib(n-1) • Does not prevent future spawns; be careful with sequences of spawns

  14. The SYNCHED Built-In Variable • True only if no children are currently executing • False if some children may be executing now • Useful for avoiding space and work overheads that reduce the critical path when there is no need to

  15. Cilk’s Memory Model • Memory operations of two threads are guaranteed to be ordered only if there is a dependence path between them (ancestor-descendant relationship) • Unordered threads may see inconsistent views of memory

  16. Locks • Mutual-exclusion variables • Memory operations that a thread performs before releasing a lock are seen by other threads after they acquire the lock • Using locks invalidates all the performance guarantees that Cilk provides • In short, Cilk supports locks but don’t use them unless you must

  17. Useful but Obsolete • Cilk as a library • Can call Cilk procedures from C, C++, Fortran • Necessary for building general-purpose C libraries • Cilk on clusters with distributed memory • Programmer sees the same shared-memory model • Used an interesting memory-consistency protocol to support shared-memory view • Was performance ever good enough?

  18. Some Open Problems Perhaps good enough for a thesis

  19. Open Issues in Cilk • Theoretical question about the distributed-memory version: is performance monotone in the size of local caches? • Cilk as a library: resurrect • Distributed-memory version: resurrect, is it fast enough? Can you make it faster?

  20. Parallel Merge Sortin Cilk

  21. Parallel Merge Sort merge_sort(A, n) if (n=1) return spawn merge_sort(A, n/2) spawn merge_sort(A+n/2, n-n/2) sync merge(A, n/2, n-n/2)

  22. Can’t Merge In Place! merge_sort(A, T, n, AorT) if (n=1) { T0=A0 ; return } spawn merge_sort(A, T, n/2, !TorA) spawn merge_sort(A+n/2, n-n/2, !TorA) sync if (TorA=A)merge(A, T, n/2, n-n/2) if (TorA=T)merge(T, A, n/2, n-n/2)

  23. Analysis • Merging uses two pointers, move the smaller into sorted array • T1(n) = 2T1(n/2) + Θ(n) • T1(n) = Θ(n log n) • We fill the output element by element • T∞(n) = T∞(n/2) + Θ(n) • T∞(n) = Θ(n) • Not very parallel . . .

  24. Parallel Merging p_merge(A,n,B,m,C) // C is the output swap A,B if A is smaller if (m+n = 1) { C0=A0 ; return } if (n = 1 /* implies m = 1 */) { merge ; return } locate An/2 between Bj and Bj+1 (binary search) spawn p_merge(A,n/2,B,j,C) spawn p_merge(A+n/2, n-n/2, B+ j, n-j, C+n/2+j) sync

  25. Analysis of Parallel Merging • When we merge n elements, both recursive calls merge at most 3n/4 elements • T∞(n) ≤T∞(3n/4) + Θ(log n) • T∞(n) = Θ(log2n) • Critical path is short! • But the analysis of work is more complex (extra work due to binary searches) • T1(n) = T1(αn) + T1((1-α)n) + Θ(log n), ¼ ≤ α ≤ ¾ • T1(n) = Θ(n) using substitution (nontrivial) • Critical path for parallel merge sort • T∞(n) = T∞(n/2) + Θ(log2n) = Θ(log3n)

  26. Analysis of ParallelMerge Sort • T∞(n) = T∞(n/2) + Θ(log2n) = Θ(log3n) • T1(n) = Θ(n) • Impact of extra work in practice? • Can find the median of 2 sorted arrays of total size n in Θ(log n) time, leads to parallel merging and merge-sorting with shorter critical paths

  27. Analysis of ParallelMerge Sort • T∞(n) = T∞(n/2) + Θ(log2n) = Θ(log3n) • T1(n) = Θ(n) • Impact of extra work in practice? • Can find the median of 2 sorted arrays of total size n in Θ(log n) time, leads to parallel merging and merge-sorting with shorter critical paths • Parallelizing an algorithm can be nontrivial!

  28. Cache-EfficientSorting

  29. Caches • Store recently-used data • Not really LRU • Usually 1, 2, or 4-way set associative • But up to 128-way set associative • Data transferred in blocks called cache lines • Write through or write back • Temporal locality: use same data again soon • Spatial locality: use nearby data soon

  30. Cache Misses inMerge Sort • Assume cache-line size = 1, LRU, write back • Assume cache holds M words • When n <= M/2, exactly n reads, write backs • When n > M, at least n cache misses (cover all cases in the proof!) • Therefore, number of cache misses is Θ(n log n/M) = Θ(n log n – log M) • We can do much better

  31. The Key Idea • Merge M/2 sorted runs into one, not 2 into 1 • Keep one element from each run in a heap, together with a run label • Extract the min, move to sorted run, insert another element from same run into heap • Reading from sorted runs & writing to sorted ouput removes elements of the heap, but this cost is O(n) cache misses • Θ(n logMn) = Θ(n log n / log M)

  32. This is Poly-Merge Sort • Optimal in terms of cache misses • Can adapt to long cache lines, sorting on disks, etc • Originally invented from sorting on tapes on a machine with several tape drives • Often, Θ(n log n / log M) is really Θ(n) in practice • Example: • 32 KB cache, 4+4 bytes elements • 4192-way merges • Can sort 64 MB of data in 1 merge, 256 GB in 2 merges • But more merges with long cache lines

  33. From Quick Sort To Sample Sort • Same number of cache misses with normal quick sort • Key idea • Choose a large random sample, Θ(M) elements • Sort the samples • Classify all the elements using binary searches • Determine size of intervals • Partition • Recursively sort the intervals • Cache miss # probably similar to merge sort

  34. Distributed-MemorySorting

  35. Issues in Sample Sort • Main idea: Partition input into P intervals, classify elements, send elements in ith interval to processor i, sort locally • Most of the communication in one global all-to-all phase • Load balancing: Intervals must besimilar in size • How do we sort the sample?

  36. Balancing the Load • Select a random sample of sP elements • OK even if every processor selects s • The probability of an interval larger than cn/P grows linearly with n, shrinks exponentially with s; a large s virtually ensures uniform intervals • Example: • n = 109, s = 256 • Pr[max interval > 2n/P] < 10-8

  37. Sorting the Sample • Can’t do it recursively! • Sending the sample to one processor • Θ(sP+n/P) communication in that processor • Θ(sP log sP+n/P log( n/P )) work • Not scalable, OK for small P • Using a different algorithm that works well for small n/P, e.g., radix sort

  38. Distributed-MemoryRadix Sort • Sort blocks of r bits from least significant to most significant; use a stable sort • Counting sort of one block • Sequentially, count occurrences using a 2r array, compute prefix sums, use as pointers • In parallel, every processor counts occurrences, then pipelined parallel prefix sums, send elements to destination processor • Θ((b/r) (2r + n/P) work & comm / proc

  39. Odds and Ends

  40. CPU Utilization Issues • Avoid conditionals • In sorting algorithms, the compiler & processors cannot predict outcome, so the pipeline stalls • Example: partitioning in qsort without conditionals • Avoid stalling the pipeline • Even without conditionals, rapid use of computed values stalls the pipeline • Same example

  41. Dirty Tricks • Exploit uniform input distributions approximately (quick sort, radix sort) • Fix mistakes by bubbling • To avoid conditionals when fixing mistakes • Split the array into small blocks • Use and’s to check for mistakes in a block • Fix a block only if it contains mistakes • Some conditionals, but not many • Compute probability of mistakes to optimize

  42. The Exercise • Get sort.cilk, more instuctions inside • Convert sequential merge sort into parallel merge sort • Make it as fast as possible as long is it is a parallel merge sort (e.g., make the bottom of the recursion fast) • Convert the fast sort into the parallel fastest sort you can • Submit files in home directory, one page with output on 1, 2 procs + possible explanation (on one side of the page)

More Related